Geothermal Resources Council Transactions · Turbines; Isobutane; Operations management

Repowering Steamboat 2 and 3 Plants with New Axial Flow Turbines

Buchanan, Tom; Posten, Wade; Berryman, Sean

Download unavailable for this file.

Abstract

The Steamboat 2 and 3 geothermal power plants owned and Operated by Ormat Nevada, Inc. included four radial flow turbo-expanders originally supplied by Atlas Copco. The turboexpanders have experienced significant maintenance costs and unscheduled down time during the period 2006 through early 2008. The Ormat Technologies group undertook to repower the Steamboat 2 and 3 plants by replacing the four turbo-expanders with axial flow Ormat engineered turbines. The plant repowering was completed in mid 2008. The repowering was successfully performed with minimal plant down time using cross-functioning Ormat teams. The project required coordinated planning utilizing expertise from all aspects of a multifunctional team including engineering, manufacturing, construction and operation. Plant performance and reliability has been greatly improved. In addition to improved performance and reliability, on going maintenance costs are expected to be significantly less than with the turbo-expanders due to elimination of intermediate speed reduction gear boxes and complicated lubrication and shaft sealing systems.

Details

Conference
Geothermal Resources Council Transactions
Year
2009
Session
Turbines; Isobutane; Operations management
Language
English
Geographic area
Steamboat Springs, Nevada
Copyright
Geothermal Resources Council
Keywords
Repowering Ormat Turbo-Expander Organic Rankine Cycle Isobutane Management of Change Process safety Management
Record ID
18404

Suggested citation

Buchanan, Tom; Posten, Wade; Berryman, Sean (2009). Repowering Steamboat 2 and 3 Plants with New Axial Flow Turbines. Proceedings, Geothermal Resources Council Transactions 2009.

Proceedings-level reference. Individual papers do not carry DOIs.

More papers by Buchanan, Tom; Posten, Wade; B ›