Searches title, authors, abstract, keywords and session. Use "quotes" for an exact phrase.
All filled fields must match. Conference and year are added to the filters on the left.
Ben BAKER, Daniel PEARL, Mathew STADDON · World Geothermal Congress · 2020 ·Power Generation
… to work together to identify and correct gaps in business processes, equipment and operations that could lead to large-scale industrial accidents. Contact Energy decided to implement a safety lifecycle approach as defined by International Electrotechnical …
View paper: Implementing Safety Lifecycle and Functional Safety with an Existing Organic Rankin Cycle Unit PDF: Implementing Safety Lifecycle and Functional Safety with an Existing Organic Rankin Cycle Unit (941 KB)
R. Winmill · New Zealand Geothermal Workshop · 2020 ·Session 5.1 Drilling
Monitoring and managing well casing integrity is an important part of safely managing geothermal wells over their lifetime. A failure of casing integrity can lead to contamination of shallow aquifers and ultimately could even lead to an uncontrolled blowout. …
View paper: Using Air-Cap Testing to Monitor and Measure Geothermal Well Casing Integrity PDF: Using Air-Cap Testing to Monitor and Measure Geothermal Well Casing Integrity (447KB)
Tom Buchanan, Wade Posten, Sean Berryman · World Geothermal Congress · 2010 ·26. Power Generation
The Steamboat 2 and 3 geothermal power plants owned and Operated by Ormat Nevada, Inc. included four radial flow turbo-expanders originally supplied by a third party vendor with the original plant design. The turbo-expanders have experienced significant …
View paper: Repowering Steamboat 2 and 3 Plants with New Axial Flow Turbines PDF: Repowering Steamboat 2 and 3 Plants with New Axial Flow Turbines (1425KB)
Buchanan, Tom; Posten, Wade; Berryman, Sean · Geothermal Resources Council Transactions · 2009 ·Turbines; Isobutane; Operations management
The Steamboat 2 and 3 geothermal power plants owned and Operated by Ormat Nevada, Inc. included four radial flow turbo-expanders originally supplied by Atlas Copco. The turboexpanders have experienced significant maintenance costs and unscheduled down time …
View paper: Repowering Steamboat 2 and 3 Plants with New Axial Flow Turbines Download unavailable