First Eleven Years of Exploitation at the Miravalles Geothermal Field

Paul Moya and Antonio Yock

Download PDF (373KB) Hosted on pangea.stanford.edu

Abstract

The Miravalles Geothermal Field has been producing electric energy since March 1994. It has provided steam for Unit 1 (55 MWe) since 1994, a Wellhead Unit (5 MWe) installed in 1995, Unit 2 (55 MWe) in 1998, Unit 3 (29 MWe) in 2000 and Unit 5 (19 MWe, a binary plant) in year 2004. The total installed capacity in Miravalles is therefore 163 MWe. The reservoir response during the ten years of exploitation is described in the following sections. So far the field has successfully supplied the steam needed to maintain constant production over the first ten years of exploitation. Field management policies as well as injection strategies have been implemented to support the pressure decline in the reservoir.

Details

Conference
Stanford Geothermal Workshop
Year
2005
Session
Reservoir Engineering
Paper number
Moya1
Language
English
Geographic area
Miravalles, Costa Rica
Copyright
Stanford Geothermal Program
Keywords
Exploitation Miravalles Geothermal Field Costa Rica
Record ID
776

Suggested citation

Paul Moya and Antonio Yock (2005). First Eleven Years of Exploitation at the Miravalles Geothermal Field. Proceedings, Stanford Geothermal Workshop 2005, Paper Moya1.

Proceedings-level reference. Individual papers do not carry DOIs.

More papers by Moya ›