Skip to content
International Geothermal Association Conference Paper Database Live

Searches title, authors, abstract, keywords and session. Use "quotes" for an exact phrase.

Advanced search

All filled fields must match. Conference and year are added to the filters on the left.

Filters

Clear all
Show filters
Conference
Year
–

1–25 of 43 papers

  • Author: Moya ×
  1. Analysis of Different Times Period for Achieving Thermal Recovery in Wells

    Alfonso ARAGÓN-AGUILAR, Sara MOYA-ACOSTA, Ariel FRANCISCO-HERNANDEZ, Siomara LÓPEZ-BLANCO · Stanford Geothermal Workshop · 2023 ·Field Studies

    Thermal properties of rock formation are a useful technical tool that allows the heat flow in the reservoir, whose result is the influence in fluid flow from the reservoir to the wellbore. However, the distribution of rock formation type varies according to …

    View paper: Analysis of Different Times Period for Achieving Thermal Recovery in Wells PDF: Analysis of Different Times Period for Achieving Thermal Recovery in Wells (793 KB)

  2. Opening New Frontiers for Geothermal Generation in Colombia, Peru and Ecuador: Resource, Regulation & Capacity Building

    A. Prieto, B. van Campen, P. Carvajal, D. Moya Pinta, A. Akamine · New Zealand Geothermal Workshop · 2016 ·6.4

    Latin America has an enormous potential for geothermal generation along its Andean Cordillera, but this remains largely untapped and can be seen as the largest global geothermal frontier. At present Chile is leading the way with the Apacheta (Cerro Pabellón) …

    View paper: Opening New Frontiers for Geothermal Generation in Colombia, Peru and Ecuador: Resource, Regulation & Capacity Building PDF: Opening New Frontiers for Geothermal Generation in Colombia, Peru and Ecuador: Resource, Regulation & Capacity Building (270KB)

  3. OBSTACLES AND STRATEGIES OF ACHIEVING GEOTHERMAL ENERGY TARGET OF 1000 MW IN ECUADOR: A TECHNO-POLITICAL OVERVIEW

    D.A. MOYA, and P. KAPARAJU · New Zealand Geothermal Workshop · 2015 ·Session 5C: Next 10,000MW

    This paper explores the key challenges and strategies for achieving the geothermal energy target of 1000 MW in Ecuador. Despite the new political decision to address the change of energy matrix based on new renewable power developments, there are other …

    View paper: OBSTACLES AND STRATEGIES OF ACHIEVING GEOTHERMAL ENERGY TARGET OF 1000 MW IN ECUADOR: A TECHNO-POLITICAL OVERVIEW PDF: OBSTACLES AND STRATEGIES OF ACHIEVING GEOTHERMAL ENERGY TARGET OF 1000 MW IN ECUADOR: A TECHNO-POLITICAL OVERVIEW (190.69 KB)

  4. Contribution to the Knowledge of the Paipa Geothermal System by the Application of the Magnetotelluric Method

    Ismael MOYANO; Edwin VALLEJO · World Geothermal Congress · 2015 ·Geophysics

    The Paipa geothermal system, located in the Eastern Cordillera of Colombian Andes, 150 km north of Bogotá, is an area of great interest because it may be related to volcanic bodies emplaced on a sedimentary and orogenic environment, about 400 km away from the …

    View paper: Contribution to the Knowledge of the Paipa Geothermal System by the Application of the Magnetotelluric Method PDF: Contribution to the Knowledge of the Paipa Geothermal System by the Application of the Magnetotelluric Method (1370 KB)

  5. Las Pailas 35 MW (Net) Binary Power Plant, Rincon de la Vieja, Guanacaste, Costa Rica

    Moya, Paul; DiPippo, Ronald · Geothermal Resources Council Transactions · 2012 ·Drilling; Power plant design and operation

    The Las Pailas geothermal power station, the second field in Costa Rica to achieve commercial operation, is described. The drilling of the wells and well-field layout and constraints are presented. The design of the unique 2-unit binary power plant is …

    View paper: Las Pailas 35 MW (Net) Binary Power Plant, Rincon de la Vieja, Guanacaste, Costa Rica Download unavailable

  6. Behavior of the Geothermal Reservoir at the Miravalles Geothermal Field During 1994-2010

    Paul Moya, Federico Nietzen, Sergio Castro and Waldo Taylor · Stanford Geothermal Workshop · 2011 ·Reservoir Engineering

    The Miravalles Geothermal Field has been producing electric energy since March 1994. It has provided steam for Unit I (55 MW, installed in 1994), a wellhead unit (5 MW, 1995), Unit 2 (55 MW, 1998) and Unit 3 (29 MW, 2000). A 19 MW “bottoming cycle” plant …

    View paper: Behavior of the Geothermal Reservoir at the Miravalles Geothermal Field During 1994-2010 PDF: Behavior of the Geothermal Reservoir at the Miravalles Geothermal Field During 1994-2010 (3121KB)

  7. The Contribution of Geothermal Exploitation at the Miravalles Geothermal Field Toward the Reduction of Global Warming

    Paul Moya and Emilia M. Rodríguez · World Geothermal Congress · 2010 ·2. Environmental and Societal Aspects

    Geothermal energy production in Costa Rica began in early 1994 with the first unit (Unit 1 - 55 MW) located at the Miravalles geothermal field in Guanacaste, Costa Rica. The Costa Rican Institute of Electricity (ICE), aware of the economic and environmental …

    View paper: The Contribution of Geothermal Exploitation at the Miravalles Geothermal Field Toward the Reduction of Global Warming PDF: The Contribution of Geothermal Exploitation at the Miravalles Geothermal Field Toward the Reduction of Global Warming (806KB)

  8. Las Pailas Geothermal Project: A 35 MW Plant

    Paul Moya, Luis Diego Pérez · World Geothermal Congress · 2010 ·6. Case Histories

    The Costa Rican Electricity Institute (ICE) developed the Miravalles geothermal field in only one decade (1994-2004), reaching a geothermal installed capacity of 163 MW at present. Additionally, ICE is going to increase the installed geothermal capacity by 35 …

    View paper: Las Pailas Geothermal Project: A 35 MW Plant PDF: Las Pailas Geothermal Project: A 35 MW Plant (3009KB)

  9. Production-Injection at the Miravalles Geothermal Field, Costa Rica

    Paul Moya, Federico Nietzen · World Geothermal Congress · 2010 ·6. Case Histories

    The Miravalles Geothermal Field has been producing electric energy since March 1994. It has provided steam for Unit 1 (55 MW, installed in 1994), a wellhead unit (5 MW, 1995), Unit 2 (55 MW, 1998) and Unit 3 (29 MW, 2000). A 19 MW “bottoming cycle” plant …

    View paper: Production-Injection at the Miravalles Geothermal Field, Costa Rica PDF: Production-Injection at the Miravalles Geothermal Field, Costa Rica (2568KB)

  10. Micro-seismicity at the Miravalles Geothermal Field, Costa Rica (1994-2009): A Tool to Confirm the Real Extent of the Reservoir

    Paul Moya and Waldo Taylor · World Geothermal Congress · 2010 ·13. Geophysics

    The micro-seismicity at the Miravalles geothermal field has been analyzed for the period from 1994 to the present. The study period is divided into four phases that coincide with the phases of development of the geothermal field: 1) January 1994 to May 1998; …

    View paper: Micro-seismicity at the Miravalles Geothermal Field, Costa Rica (1994-2009): A Tool to Confirm the Real Extent of the Reservoir PDF: Micro-seismicity at the Miravalles Geothermal Field, Costa Rica (1994-2009): A Tool to Confirm the Real Extent of the Reservoir (1168KB)

  11. Miravalles Unit 3 Single-Flash Plant, Guanacaste, Costa Rica: Technical and Environmental Performance Assessment

    Paul Moya, Ronald DiPippo · World Geothermal Congress · 2010 ·26. Power Generation

    Since it was first visited by a United Nations scientific delegation in 1963, the Miravalles geothermal field in Costa Rica has developed into one of the most productive and reliable geothermal power complexes in the world. Currently five power units are in …

    View paper: Miravalles Unit 3 Single-Flash Plant, Guanacaste, Costa Rica: Technical and Environmental Performance Assessment PDF: Miravalles Unit 3 Single-Flash Plant, Guanacaste, Costa Rica: Technical and Environmental Performance Assessment (904KB)

  12. Miravalles PGM-29 Wellhead Unit, Guanacaste, Costa Rica: Technical and Environmental Performance Assessment

    Paul Moya, Ronald DiPippo · World Geothermal Congress · 2010 ·26. Power Generation

    Wellhead power plants have played an important role in the development of the Miravalles field in Costa Rica. Wellhead units were being considered during the well-drilling phase to provide on-site power and to allow well testing under realistic flow …

    View paper: Miravalles PGM-29 Wellhead Unit, Guanacaste, Costa Rica: Technical and Environmental Performance Assessment PDF: Miravalles PGM-29 Wellhead Unit, Guanacaste, Costa Rica: Technical and Environmental Performance Assessment (1356KB)

  13. Iron Meter for Production Wells at the Miravalles Geothermal Field

    Paul Moya and Rodrigo Mora · World Geothermal Congress · 2010 ·27. Corrosion and Scaling

    At the Miravalles geothermal field there are wells that produce acid fluids, which have been successfully utilized by treating the acidity using a neutralization system. The system continuously adds sodium hydroxide (NaOH) through a capillary tubing string …

    View paper: Iron Meter for Production Wells at the Miravalles Geothermal Field PDF: Iron Meter for Production Wells at the Miravalles Geothermal Field (2577KB)

  14. Performance of Calcium Carbonate Inhibition and Neutralization Systems for Production Wells at the Miravalles Geothermal Field

    Paul Moya and Federico Nietzen · World Geothermal Congress · 2010 ·27. Corrosion and Scaling

    Power generation at the Miravalles geothermal field currently depends on the utilization of 21 systems for inhibition of calcium carbonate scale, as well as 3 acid-neutralization systems, in the field’s production wells. The performance of the inhibition and …

    View paper: Performance of Calcium Carbonate Inhibition and Neutralization Systems for Production Wells at the Miravalles Geothermal Field PDF: Performance of Calcium Carbonate Inhibition and Neutralization Systems for Production Wells at the Miravalles Geothermal Field (1306KB)

  15. Geothermal Inflow Performance Relationships with Well Damage Effect and Their Applications

    Aragon, A. A.; Moya, S. L.; Izquierdo, M. G.; Arellano, G. V. · Geothermal Resources Council Transactions · 2007 ·Formation damage; Well testing; Production decline

    In this work a review of Inflow Performance Relationships (IPR), their development in petroleum reservoir engineering and the innovations made to incorporate the damage effects are presented. In analogous manner the Inflow Performance Relationships for …

    View paper: Geothermal Inflow Performance Relationships with Well Damage Effect and Their Applications Download unavailable

  16. The Use of Inflow Performance Relationships to Identify Reservoir Response During Production Tests in a Geothermal Well

    AragÛn, A., Su·rez, M.C., Moya, S., Izquierdo, G. · Stanford Geothermal Workshop · 2007 ·Production Engineering

    The behavior of four inflow performance relationships are analyzed and discussed. Two of them are developed for petroleum systems and two others are developed for geothermal fluid containing high and low salinity respectively. A methodology to determine the …

    View paper: The Use of Inflow Performance Relationships to Identify Reservoir Response During Production Tests in a Geothermal Well PDF: The Use of Inflow Performance Relationships to Identify Reservoir Response During Production Tests in a Geothermal Well (118KB)

  17. Miravalles Unit 5: Planning and Design

    Rojas, Paul Moya; DiPippo, Ronald · Geothermal Resources Council Transactions · 2006 ·Power Plant design and operation; Binary cycle power generat

    The Miravalles geothermal power station in Costa Rica is described before and after the addition of Unit 5, a bottoming binary power plant. The early planning and design alternatives for Unit 5 are discussed. The bids and the selection criteria are presented. …

    View paper: Miravalles Unit 5: Planning and Design Download unavailable

  18. Legal Barriers to the Utilization of Geothermal Energy in Protected Areas of Costa Rica

    Moya, Paul; Rodriguez, Emilia M.; Mainieri, Alfredo · Geothermal Resources Council Transactions · 2006 ·Laws and regulations

    The Costa Rican Institute of Electricity (ICE) is in charge of the development and management of electric power generation in Costa Rica. ICE has developed the Miravalles geothermal project, which currently has an installed capacity of 163 MW, representing …

    View paper: Legal Barriers to the Utilization of Geothermal Energy in Protected Areas of Costa Rica Download unavailable

  19. Analysis of Structural Influence on Production Wells at the Los Humeros, Mexico Geothermal Field

    Aragon, Alfonso; Moya, Sara L.; Arellano, Victor; Izquierdo, Georgina · Geothermal Resources Council Transactions · 2005 ·Faults & Fractures

    View paper: Analysis of Structural Influence on Production Wells at the Los Humeros, Mexico Geothermal Field Download unavailable

  20. First Eleven Years of Exploitation at the Miravalles Geothermal Field

    Paul Moya and Antonio Yock · Stanford Geothermal Workshop · 2005 ·Reservoir Engineering

    The Miravalles Geothermal Field has been producing electric energy since March 1994. It has provided steam for Unit 1 (55 MWe) since 1994, a Wellhead Unit (5 MWe) installed in 1995, Unit 2 (55 MWe) in 1998, Unit 3 (29 MWe) in 2000 and Unit 5 (19 MWe, a binary …

    View paper: First Eleven Years of Exploitation at the Miravalles Geothermal Field PDF: First Eleven Years of Exploitation at the Miravalles Geothermal Field (373KB)

  21. Non-Condensable Gases at the Miravalles Geothermal Field

    Paul Moya and Eddy S·nchez · Stanford Geothermal Workshop · 2005 ·Production Engineering

    The Miravalles Geothermal Field has been producing electric energy since March 1994. It has provided steam for Unit 1 (55 MWe) since 1994, a Wellhead Unit (5 MWe) installed in 1995, Unit 2 (55 MWe) in 1998, Unit 3 (29 MWe) in 2000 and Unit 5 (19 MWe, a binary …

    View paper: Non-Condensable Gases at the Miravalles Geothermal Field PDF: Non-Condensable Gases at the Miravalles Geothermal Field (269KB)

  22. Evolution of the Miravalles Geothermal Field in Costa Rica after Ten Years of Exploitation

    Carlos González-Vargas, Paul Moya-Rojas, Eddy Sánchez-Rivera, Osvaldo Vallejos-Ruiz, and Antonio Yock-Fung · World Geothermal Congress · 2005 ·9. Case Histories

    The Miravalles Geothermal Field has been producing since 1994, and its installed capacity has now reached 163 MW. The field is a high-temperature liquid-dominated reservoir with temperatures reaching 230-255?C. Since exploitation began, the reservoir's …

    View paper: Evolution of the Miravalles Geothermal Field in Costa Rica after Ten Years of Exploitation PDF: Evolution of the Miravalles Geothermal Field in Costa Rica after Ten Years of Exploitation (1542KB)

  23. Reservoir Response to Exploitation at the Miravalles Geothermal Field

    Paul Moya, Sergio Castro · World Geothermal Congress · 2005 ·11. Reservoir Engineering

    The Miravalles Geothermal Field has been producing electric energy since March 1994. It has provided steam for Unit 1 (55 MWe, installed 1994), a wellhead unit (5 MWe, 1995), Unit 2 (55 MWe, 1998) and Unit 3 (29 MWe, 2000). A 19 MWe "bottoming cycle" plant …

    View paper: Reservoir Response to Exploitation at the Miravalles Geothermal Field PDF: Reservoir Response to Exploitation at the Miravalles Geothermal Field (195KB)

  24. Benefits from the Utilization of a Calcium Carbonate Inhibition System for Production Wells at the Miravalles Geothermal Field

    Paul Moya, Federico Nietzen, Antonio Yock · World Geothermal Congress · 2005 ·20. Corrosion and Scaling

    The Miravalles Geothermal Field has been producing electric energy since March 1994. It has provided steam for Unit 1 (55 MWe) since 1994, a Wellhead Unit (5 MWe) installed in 1995, Unit 2 (55 MWe) in 1998, Unit 3 (29 MWe) in 2000, and Unit 5 (19 MWe, a …

    View paper: Benefits from the Utilization of a Calcium Carbonate Inhibition System for Production Wells at the Miravalles Geothermal Field PDF: Benefits from the Utilization of a Calcium Carbonate Inhibition System for Production Wells at the Miravalles Geothermal Field (214KB)

  25. Development of the Neutralization System for Production Wells at the Miravalles Geothermal Field

    Paul Moya, Federico Nietzen, Eddy S·nchez-Rivera · World Geothermal Congress · 2005 ·20. Corrosion and Scaling

    The Miravalles geothermal field has been producing electric energy since March 1994. It has provided steam for Unit 1 (55 MWe) since 1994, a Wellhead Unit (5 MWe) installed in 1995, Unit 2 (55 MWe) in 1998, Unit 3 (29 MWe) in 2000 and also Unit 5 (19 MWe, a …

    View paper: Development of the Neutralization System for Production Wells at the Miravalles Geothermal Field PDF: Development of the Neutralization System for Production Wells at the Miravalles Geothermal Field (290KB)

1 2 Next ›

Papers are freely accessible. Copyright remains with the authors and conference organisers as stated on each paper.

IGA Conference Paper Database · New search