Repowering of the Cove Fort Power Plant

Sacerdoti, Ariel

Download unavailable for this file.

Abstract

Exploration of the Cove Fort geothermal resource began in the 1970s with generation of electricity from 1985 to 2003. The original power plant consisted of Ormat Energy Converters (OEC), a topping turbine and a condensing steam turbine totaling just over 10 MW. Enel Green Power acquired the project rights in 2007. The resource characteristics were evaluated for repowering the power plant and several alternatives were considered in order to maximize the owner?s return on investment (ROI). Namely, the design objective was to maximize generation output given the resource data. Ormat did not propose an off-the-shelf pre-engineered unit, rather it analyzed the resource, carried out various custom engineering alternative schemes for the resource and chose the most efficient option.

Details

Conference
Geothermal Resources Council Transactions
Year
2013
Session
Power plant design and operation; Binary cycle power generat
Language
English
Geographic area
Cove Fort, Utah
Copyright
Geothermal Resources Council
Keywords
Power plant repowering binary custom engineering ORC
Record ID
24705

Suggested citation

Sacerdoti, Ariel (2013). Repowering of the Cove Fort Power Plant. Proceedings, Geothermal Resources Council Transactions 2013.

Proceedings-level reference. Individual papers do not carry DOIs.

More papers by Sacerdoti, Ariel ›