Modular Design and Construction at the Bear Canyon 20 MW Power Plant
Download unavailable for this file.
Abstract
The Bear Canyon 20 MW Power Plant was designed around numerous modular equipment packages. This modular concept resulted in significant schedule savings in design, construction, and startup. The use of modular equipment contributed to the completion of the project more than 4 months ahead of schedule.
Details
Suggested citation
Phair, Kenneth A. (1989). Modular Design and Construction at the Bear Canyon 20 MW Power Plant. Proceedings, Geothermal Resources Council Transactions 1989.