Searches title, authors, abstract, keywords and session. Use "quotes" for an exact phrase.
All filled fields must match. Conference and year are added to the filters on the left.
Phair, Kenneth A. · Geothermal Resources Council Transactions · 1989 ·Power plant design and operation; Operations management
The Bear Canyon 20 MW Power Plant was designed around numerous modular equipment packages. This modular concept resulted in significant schedule savings in design, construction, and startup. The use of modular equipment contributed to the completion of the …
View paper: Modular Design and Construction at the Bear Canyon 20 MW Power Plant Download unavailable
Urbank, Karl F. · Geothermal Resources Council Transactions · 1989 ·Power plant design and operation; Permitting; Operations man
The West Ford Flat 27 megawatt power plant is one of two Geysers plants constructed by Geysers Geothermal Company during 1987 and 1988. The project began in May 1987 with the acquisition of a PG&E Power Purchase Agreement from SAI Geothermal. Construction …
View paper: Design and Construction of the West Ford Flat Power Plant at The Geysers Download unavailable
Rodriguez, G.; Sarmina, I.; Iglesias, E.; Aragon, A. · Geothermal Resources Council Transactions · 1986 ·Software; Well testing; Flow testing
This paper describes a software package, GEOTOOL, designed to help characterization and assessment of geothermal fields. GEOTOOL offers numeric and graphic technique integrated in a user-friendly and interactive system. The package performs a wide variety of …
View paper: GEOTOOL: A Computer Package to Aid Geothermal Reservoir Assessment Download unavailable