Geothermal Resources Council Transactions · Exploration; Drilling; Power plant design and operation; Pow

Electric Exploration and Development of the Milos Island, Greece, Geothermal Resources

Adamis, P. N.

Download unavailable for this file.

Abstract

Milos resources have been investigated since 1971. Five deep wells have been drilled in the eastern part of the island, identifying a high temperature and high enthalpy geothermal reservoir. Reservoir characteristics and the thermodynamic properties of the fluid suggest a fluid and heat storage capacity that could support geothermoelectric power plants with a 120 MWe capacity at least. Late in 1985 a 2 MWe geothermal pilot plant will be placed in commercial operation on Milos in order to proved the long term reservoir efficiency. At the same time Public Power Corporation (PPC) will carry out the feasibility study of an initial 60 MWe development on Milos with the longer term objective being the installation of the total possible generating capacity. This paper described briefly the main features of the Milos geothermal resource, the 2 MWe goethermoelectric power plant, the feasibility study to be carried out, and the development plans.

Details

Conference
Geothermal Resources Council Transactions
Year
1985
Session
Exploration; Drilling; Power plant design and operation; Pow
Language
English
Geographic area
Milos, Greece
Copyright
Geothermal Resources Council
Keywords
Exploration Drilling Power Generation Greece Milos Condensing Geology Case History
Record ID
15617

Suggested citation

Adamis, P. N. (1985). Electric Exploration and Development of the Milos Island, Greece, Geothermal Resources. Proceedings, Geothermal Resources Council Transactions 1985.

Proceedings-level reference. Individual papers do not carry DOIs.

More papers by Adamis, P. N. ›