Skip to content
International Geothermal Association Conference Paper Database Live

Searches title, authors, abstract, keywords and session. Use "quotes" for an exact phrase.

Advanced search

All filled fields must match. Conference and year are added to the filters on the left.

Filters

Show filters
Conference
Year
–

1–18 of 18 papers

  1. Analysis of Performance and Reliability of BPPT 3MW Condensing Type Geothermal Power Plant – Kamojang During 3x24 Hours Continuous Synchronous Testing

    Bambang Teguh PRASETYO, SUYANTO, Himawan SUTRIYANTO · World Geothermal Congress · 2020 ·Power Generation

    … and operated a 3MW Geothermal Power Plant (GPP) of condensing type technology in Kamojang - Indonesia, which is the first prototype GPP manufactured by national companies. The GPP design is based on KMJ-68 well data characteristics, owned by …

    View paper: Analysis of Performance and Reliability of BPPT 3MW Condensing Type Geothermal Power Plant – Kamojang During 3x24 Hours Continuous Synchronous Testing PDF: Analysis of Performance and Reliability of BPPT 3MW Condensing Type Geothermal Power Plant – Kamojang During 3x24 Hours Continuous Synchronous Testing (768 KB)

  2. Financial Feasibility Assessment of a Wellhead Geothermal Power Plant at Nevado del Ruiz Volcano in Colombia

    Pablo AGUILERA, José Luis HENRIQUEZ · World Geothermal Congress · 2020 ·Economics and Financing

    … currently there are also wellhead power plants with condensing turbine even below 10 MW, which can be more technically efficient and with better investment returns. The selection of a geothermal power plant will depend mainly on the volume of the …

    View paper: Financial Feasibility Assessment of a Wellhead Geothermal Power Plant at Nevado del Ruiz Volcano in Colombia PDF: Financial Feasibility Assessment of a Wellhead Geothermal Power Plant at Nevado del Ruiz Volcano in Colombia (932 KB)

  3. Technology Selection Criteria for a Geothermal Power Plant: Greenfield Development

    Jose Luis HENRIQUEZ MIRANDA · World Geothermal Congress · 2020 ·Power Generation

    … energy from geothermal are mainly back pressure, condensing single flash, double flash, triple flash, dry steam and binary units. The geothermal development in the feasibility stage requires the selection of the technology suitable to the …

    View paper: Technology Selection Criteria for a Geothermal Power Plant: Greenfield Development PDF: Technology Selection Criteria for a Geothermal Power Plant: Greenfield Development (579 KB)

  4. Big Iron in Nicaragua: A Muscular New Geothermal Plant! The San Jacinto-Tizate Geothermal Project

    Chin, Chun; Wallace, Kevin; Harvey, William; Dalin, Bridget; Long, Mike · Geothermal Resources Council Transactions · 2013 ·Power plant design and operation; Flash steam power generati

    … phase eventually yielded to staged installation of two new condensing flash units, each of 36 MW capacity, with a dessert course of a binary bottoming cycle now getting the finishing touches. At its current capacity of 72 MW, the plant is the largest in …

    View paper: Big Iron in Nicaragua: A Muscular New Geothermal Plant! The San Jacinto-Tizate Geothermal Project Download unavailable

  5. Staged Asset Deployment – Commercial and Technical Advantages of Using a Wellhead Generation Unit

    Mike Long, Ramesh Raman and William Harvey · ARGeo · 2012 ·Case Studies

    … for wellhead units, including backpressure turbines, condensing units, binary units, and surplus equipment, and compare their relative merits. The transition to the long-term power station is discussed. A number of case studies of successful …

    View paper: Staged Asset Deployment – Commercial and Technical Advantages of Using a Wellhead Generation Unit PDF: Staged Asset Deployment – Commercial and Technical Advantages of Using a Wellhead Generation Unit (597KB)

  6. Resource Temperature as a Measure of Geothermal Potential

    McFarland, Clifton B., Jr. · Geothermal Resources Council Transactions · 1977 ·Reservoir engineering; Fluid dynamics; Thermodynamics

    … work as a function of flow rate, resource temperature, condensing temperature and reinjection temperature show that well productivity (flow rate) and condensing temperature variations within the typical ranges of geothermal resources can be more …

    View paper: Resource Temperature as a Measure of Geothermal Potential Download unavailable

  7. Additional Wellhead Units at Ulumbu, Indonesia

    Mendive, David ., Heninger, Milan ., Geffert, Sean . and Hamacek, Yvette · New Zealand Geothermal Workshop · 2014 ·Geothermal Engineering - Production and Management

    Geothermal Development Associates (GDA) provided engineering, major equipment, and startup and commissioning services to PT Perusahaan Listrik Negara (Persero) (PLN) for a modular 2 x 2.5 MW geothermal wellhead plant located at Ulumbu, Flores Island, …

    View paper: Additional Wellhead Units at Ulumbu, Indonesia PDF: Additional Wellhead Units at Ulumbu, Indonesia (635 KB)

  8. Geothermal Resource Sustainability Through Innovative Air Cooled Combined Cycle Hybrids

    Dickey, Halley K.; Leger, Donald R. · Geothermal Resources Council Transactions · 2011 ·Power plant design and operation; Binary cycle power generat

    For existing and future geothermal plants to remain viable, geothermal resource and water usage, environmental, and cost challenges need to be addressed. The system outlined within this paper spearhead these issues while at the same time increasing the …

    View paper: Geothermal Resource Sustainability Through Innovative Air Cooled Combined Cycle Hybrids Download unavailable

  9. Small-Scale Use of Geothermal Power at Oserian Farms, Naivasha, Kenya

    Steve Hirsch · World Geothermal Congress · 2010 ·26. Power Generation

    In November 2007, Oserian Development Company of Naivasha, Kenya, completed the construction and commissioning of its second geothermal power station. At the heart of the new plant is a nominal 2 MW steam turbine generator set provided by Geothermal …

    View paper: Small-Scale Use of Geothermal Power at Oserian Farms, Naivasha, Kenya PDF: Small-Scale Use of Geothermal Power at Oserian Farms, Naivasha, Kenya (2050KB)

  10. Small-Scale Use of Geothermal Power at Oserian Farms, Naivasha, Kenya

    Hirsch, Stephen · Geothermal Resources Council Transactions · 2009 ·Flash steam power generation; Single flash

    In November 2007, Oserian Development Company of Naivasha, Kenya, completed the construction and commissioning of its second geothermal power station. At the heart of the new plant is a nominl 2 MW steam turbine generator set provided by Geothermal …

    View paper: Small-Scale Use of Geothermal Power at Oserian Farms, Naivasha, Kenya Download unavailable

  11. Experience of creation and operation of geothermal power plants at Mutnovsky geothermal field, Kamchatka, Russia

    Oleg Povarov, Valery Saakyan, Alexandre Nikolski, Victor Luzin, Grigory Tomarov and Maxim Sapozhnikov · Iceland Geothermal Conference · 2003 ·Binary cycles ?? Power generation

    The energy development strategy of the Kamchatka Region lies in its entire conversion to use of geothermal resources. The Mutnovsky geothermal reservoir is well-studied and found adequate to ensure the operation of a geothermal power plant with more than …

    View paper: Experience of creation and operation of geothermal power plants at Mutnovsky geothermal field, Kamchatka, Russia PDF: Experience of creation and operation of geothermal power plants at Mutnovsky geothermal field, Kamchatka, Russia (433KB)

  12. About the Geothermal Electric Power Plant from the University of Oradea, Romania

    Gordan, Mircea I.; Maghiar, Teodor · Geothermal Resources Council Transactions · 1997 ·Power plant design and operation; Thermodynamics

    View paper: About the Geothermal Electric Power Plant from the University of Oradea, Romania Download unavailable

  13. Geysers Advanced Direct Contact Condenser Results

    Henderson, J.; Bahning, Tom · Geothermal Resources Council Transactions · 1997 ·Equipment design; Condensers; Power plant design and operati

    View paper: Geysers Advanced Direct Contact Condenser Results Download unavailable

  14. Geothermal Power Market Mobilization Initiative--Climate Change Action Plan

    Calvert, Stanley D. · Geothermal Resources Council Transactions · 1994 ·Economics; Energy markets; Energy policy

    View paper: Geothermal Power Market Mobilization Initiative--Climate Change Action Plan Download unavailable

  15. Operating Experience and Future Developments of the Los Azufres and Los Humeros 5 MW Geothermal Power Plants

    Cadenas Tovar, Roberto; Moscatelli, Guiseppe; Fogato, Giorgio; Vacca, Mauro · Geothermal Resources Council Transactions · 1994 ·Turbines; Power plant design and operation

    View paper: Operating Experience and Future Developments of the Los Azufres and Los Humeros 5 MW Geothermal Power Plants Download unavailable

  16. Increasing Electric Power Output from Single-Flash Geothermal Plants

    Rosenblatt, J. H.; Saulson, S. H. · Geothermal Resources Council Transactions · 1990 ·Single flash; Power plant design and operation; Flash steam

    Single flash geothermal power plants are relatively inefficient compared to their higher temperature "cousins." The Low Temperatures Engine System (LTES) is a novel cycle applicable to many types of power plants. The LTES has been analyzed as an add on …

    View paper: Increasing Electric Power Output from Single-Flash Geothermal Plants Download unavailable

  17. Electric Exploration and Development of the Milos Island, Greece, Geothermal Resources

    Adamis, P. N. · Geothermal Resources Council Transactions · 1985 ·Exploration; Drilling; Power plant design and operation; Pow

    Milos resources have been investigated since 1971. Five deep wells have been drilled in the eastern part of the island, identifying a high temperature and high enthalpy geothermal reservoir. Reservoir characteristics and the thermodynamic properties of the …

    View paper: Electric Exploration and Development of the Milos Island, Greece, Geothermal Resources Download unavailable

  18. Investigation of Heat Transfer Coefficients of Working Fluids in Geothermal Power Cycles

    Tleimat, B. W.; Laird, A. D. K. · Geothermal Resources Council Transactions · 1978 ·Working fluids; Binary cycle power generation

    Abstract not available

    View paper: Investigation of Heat Transfer Coefficients of Working Fluids in Geothermal Power Cycles Download unavailable

Papers are freely accessible. Copyright remains with the authors and conference organisers as stated on each paper.

IGA Conference Paper Database · New search