After getting stuck on the figure of 807 MW for almost four years, the development of geothermal energy for power generation was endeavored to be intensified again by the government. Various policies have been issued. One of the newest was the Geothermal Development Road-map. The other policies were the National Energy Policy 2003 – 2010, supported by Law No. 20 of 2003 on Electricity and Law No. 27 of 2003 on Geothermal. In the road-map the development of geothermal is targeted for power plant with capacity from 807 MW to 2000 MW in 2008 and will rise to 6000 MW in 2020. Today, eight geothermal areas are being developed to produce 822.5 MW and as scheduled the eight power plants will be operated in the next three years. These areas including Lahendong + 40 MW; Kamojang + 60 MW; Wayang Windu + 110 MW; Darajat + 110 MW; Ulu Belu 110 MW; Lumut Balai 330 MW; Tompaso 60 MW and Mataloko 2.5 MW. We expect the total installed capacity of geothermal power plant will become of 1629.5 MW by 2007.

Details

Conference
Asian Geothermal Symposium
Year
2004
Session
High-Temperature Resource Development
Language
English
Geographic area
Indonesia
Copyright
Asian Geothermal Symposium
Keywords
Current status geothermal development road-map national energy policy
Record ID
6976

Suggested citation

Dwipa Sjafra (2004). Current State of Geothermal Development in Indonesia. Proceedings, Asian Geothermal Symposium 2004.

Proceedings-level reference. Individual papers do not carry DOIs.

More papers by Sjafra ›