World Geothermal Congress · 6. Case Histories

Wairakei Power Station – New Zealand. Plant Modifications arising from Operational Deficiencies, Technology Advances and Life Extension Studies

Chris Morris, Brian Carey

Abstract

The Wairakei Geothermal Power Station has had a remarkable generation history since machine commissioning through the period 1958 to 1963. The paper discusses some of the plant design constraints, the early reputation of the plant and learning experiences from over 50 years of operation. Plant deficiencies have been identified and analysed, plant maintenance processes have changed, life extension studies have been completed and technology advances have occurred through the decades. Modifications to the plant and maintenance practices have been made enabling the Wairakei steam turbine plant to achieve high availability, low forced outage factors, high plant load factors and an enviable 50 years of production service from the original plant. The paper discusses selected aspects and modifications to the plant that have contributed to 50 years of outstanding service from the Wairakei Geothermal Power Station.

Details

Conference
World Geothermal Congress
Year
2010
Session
6. Case Histories (36 papers)
Paper number
0621
Language
English
Geographic area
Wairakei, New Zealand; Taupo Volcanic Zone
Copyright
International Geothermal Association
Keywords
Wairakei New Zealand geothermal power station modifications reliability
Record ID
5977

Suggested citation

Chris Morris, Brian Carey (2010). Wairakei Power Station – New Zealand. Plant Modifications arising from Operational Deficiencies, Technology Advances and Life Extension Studies. Proceedings, World Geothermal Congress 2010, Paper 0621.

Proceedings-level reference. Individual papers do not carry DOIs.