Iceland Geothermal Conference · Reservoir and Reinjection

Reinjection of thermal waters into sandstone reservoirs in the North German Basin

Peter Seibt

Abstract

Intensive investigations into the utilisation of the geothermal potential in the North German Basin began already in the early 1980s. The firsts tests of production and reinjection of thermal water from / into sandstone reservoirs were started in 1982. As a result, these led to the commissioning of the first geothermal heating plant for heat supply of a residential area in the town of Waren (MԹԴritz) in 1984. More plants were put into operation in Neubrandenburg, Neustadt-Glewe and Berlin. The use of the sandstonereservoirs for heat storage produced new technical solutions. The exact knowledge of the geological and geochemical conditions forms the essential prerequisite for the successful planning, construction and operation of the geothermal plant. In the following, technical solutions and practical experience are presented along with the geological andgeochemical conditions.

Details

Conference
Iceland Geothermal Conference
Year
2003
Session
Reservoir and Reinjection
Language
English
Geographic area
Germany
Copyright
Geothermal Association of Iceland
Keywords
reinjection thermal waters sandstone reservoirs.
Record ID
512

Suggested citation

Peter Seibt (2003). Reinjection of thermal waters into sandstone reservoirs in the North German Basin. Proceedings, Iceland Geothermal Conference 2003.

Proceedings-level reference. Individual papers do not carry DOIs.

More papers by Seibt ›