World Geothermal Congress · SECTION 10 - Direct Heat Uses

Geothermal Plant in Thisted with Absorption Heat Pump and 10 Years Operation Without Corrosion or Reinjection Problems in Sandstone for 15% Saline Water

Allan Mahler

Download PDF

Abstract

A geothermal pilot plant with an electric heat pump was erected by Dansk Olie og Naturgas in 1984 and expanded to the present demonstration plant with an absorption heat pump in 1988. The use of an absorption heat pump nearly eliminates energy consumption and operation costs for the heat pump. The absorption heat pump is by now driven by heat from a combined heat and power incineration plant and the driving heat is fully recovered on the district heating network. The design has made it possible to avoid corrosion problems and to reinject millions of cubic meters of a 15% saline geothermal water in a sandstone reservoir. Heat production costs, plant concept, operating experiences and absorption heat pump are discussed. The reservoir temperature at 1250 m is 46?C and the transmissivity Dm.

Details

Conference
World Geothermal Congress
Year
1995
Session
SECTION 10 - Direct Heat Uses (47 papers)
Paper number
3-mahler2
Language
English
Geographic area
Thisted, Denmark
Copyright
International Geothermal Association
Keywords
combined absorption CO2 injection sandstone saline
Record ID
4788

Suggested citation

Allan Mahler (1995). Geothermal Plant in Thisted with Absorption Heat Pump and 10 Years Operation Without Corrosion or Reinjection Problems in Sandstone for 15% Saline Water. Proceedings, World Geothermal Congress 1995, Paper 3-mahler2.

Proceedings-level reference. Individual papers do not carry DOIs.

More papers by Mahler ›