New Zealand Geothermal Workshop · Session 3.3 - PRODUCTION & MANAGEMENT 1

Calcite Inhibition Systems Tubing Recovery

D. Wilson, R. Hidayat

Abstract

Chemical Inhibition Systems (CIS) are widely used in geothermal wells to deliver antiscalant chemicals that mitigate mineral scaling. Over time, CIS tubing can become stuck due to scale buildup, caused by inappropriate chemical selection, changes in fluid chemistry, and lack of routine maintenance. This paper presents field-proven results using the Solenis chemical cleaning method to dissolve scale and recover immobilized CIS tubing in high-temperature geothermal wells.
The method has been successfully deployed in geothermal fields in New Zealand and the Philippines, with each case involving different scale types—primarily silica, calcite, and mixed mineral compositions. We detail the assessment process, tailored chemical program design, and safe retrieval procedures that avoided more costly well intervention methods involving a rig or coiled tubing unit. These interventions restored injection capability, improved well performance, and extended system life. The paper discusses practical recommendations for preventing stuck tubing and optimizing CIS reliability across a variety of geothermal environments.

Details

Conference
New Zealand Geothermal Workshop
Year
2025
Session
Session 3.3 - PRODUCTION & MANAGEMENT 1
Paper number
101
Language
English
Copyright
University of Auckland
Keywords
Calcite Inhibition System Geothermal Well Intervention CIS Tubing Recovery Solenis Acidising
Record ID
38197

Suggested citation

D. Wilson, R. Hidayat (2025). Calcite Inhibition Systems Tubing Recovery. Proceedings, New Zealand Geothermal Workshop 2025, Paper 101.

Proceedings-level reference. Individual papers do not carry DOIs.

More papers by Wilson ›