Stanford Geothermal Workshop · Production Engineering

Practical Experiences on Operating a Combined Geothermal Power Plant in AlaÅŸehir Field

Hakki AYDIN, Volkan KARAOGLAN, Ahmet YILMAZ, Arda EMRE, Huseyin GENCKAN

Download PDF (1287 KB) Hosted on pangea.stanford.edu

Abstract

Geothermal power plant operating conditions and efficiency are heavily influenced by the quality of the produced geothermal fluid, which is directly affected by changes in geothermal well performance and reservoir dynamics. The Alaşehir geothermal field, one of the most active fields in Türkiye, is operated by various geothermal developers. This study highlights the challenges encountered during 10 years of operation at a combined double-flash and binary geothermal power plant, with a focus on resource and power plant management. Solutions implemented include enhanced resource management strategies and operational improvements such as ESP installations, gas lifting, acidizing, booster pumps, and equipment upgrades. Modifications and adaptations were applied to critical components such as pumps, fans, heat exchangers, turbines, and other equipment in both the flashing and binary systems to maintain efficient and reliable operations.

Details

Conference
Stanford Geothermal Workshop
Year
2025
Session
Production Engineering
Paper number
Aydin3
Language
English
Copyright
Stanford Geothermal Program
Keywords
combined geothermal power plant reservoir management artificial lifting
Record ID
37965

Suggested citation

Hakki AYDIN, Volkan KARAOGLAN, Ahmet YILMAZ, Arda EMRE, Huseyin GENCKAN (2025). Practical Experiences on Operating a Combined Geothermal Power Plant in AlaÅŸehir Field. Proceedings, Stanford Geothermal Workshop 2025, Paper Aydin3.

Proceedings-level reference. Individual papers do not carry DOIs.

More papers by Aydin ›