Stanford Geothermal Workshop · Field Studies

A Research and Production Geothermal Project on the TU Delft Campus: Project Implementation and Initial Data Collection

Phil VARDON, Hemmo ABELS, Auke BARNHOORN, Alexandros DANIILIDIS, David BRUHN, Guy DRIJKONINGEN, Kaylee ELLIOTT, Beer VAN ESSER, Susanne LAUMANN, Piet VAN PAASSEN, Liliana VARGAS MELEZA, Andrea VONDRAK, Denis VOSKOV

Download PDF (1389 KB) Hosted on pangea.stanford.edu

Abstract

A geothermal well doublet, designed with two primary aims; one of research and the second of commercial thermal energy supply, is currently being installed on the campus of Delft University of Technology, with the wells being drilled in the second half of 2023. The project includes a comprehensive research program, involving the installation of a wide range of instruments alongside an extensive logging and coring program and monitoring network. The doublet has been cored, with continuous samples from the heterogenous reservoir being complimented with more distributed side-wall cores, alongside a large suite of open-hole well logs in the reservoir section of both wells. Such investigation is rarely undertaken in geothermal projects. A fiber optic cable will monitor the production well, and will be installed all-the-way down to the reservoir section when the well completion is installed, at approximately 2300m depth. The reservoir is the fluvial Lower Cretaceous Delft Sandstone that is used as a geothermal reservoir in a series of existing and planned doublets in the West Netherlands Basin. A local seismic monitoring network has been installed in the surrounding area with the aim of monitoring very low-magnitude natural or induced seismicity. A vertical observation well with electromagnetic sensors will be drilled in a few years’ time between the injector and producer to monitor cold-front propagation. The total project is targeted to supply around 25 MW of thermal energy at peak conditions, next to this project a thermal energy storage system is planned to provide a seasonal buffer. The project is a key national research infrastructure and is being incorporated into the European infrastructure EPOS (European Plate Observing System, https://www.epos-eu.org/), such that accessibility and data availability will be as wide as possible. All observations will be included in a digital-twin framework that will allow better decisions to be made in future geothermal projects. This paper presents the implementation and initial data collection from the project, including an initial evaluation of the logging and coring campaigns.

Details

Conference
Stanford Geothermal Workshop
Year
2024
Session
Field Studies
Paper number
Vardon
Language
English
Copyright
Stanford Geothermal Program
Keywords
Direct-use heating Field study Monitoring Data collection
Record ID
36469

Suggested citation

Phil VARDON, Hemmo ABELS, Auke BARNHOORN, Alexandros DANIILIDIS, David BRUHN, Guy DRIJKONINGEN, Kaylee ELLIOTT, Beer VAN ESSER, Susanne LAUMANN, Piet VAN PAASSEN, Liliana VARGAS MELEZA, Andrea VONDRAK, Denis VOSKOV (2024). A Research and Production Geothermal Project on the TU Delft Campus: Project Implementation and Initial Data Collection. Proceedings, Stanford Geothermal Workshop 2024, Paper Vardon.

Proceedings-level reference. Individual papers do not carry DOIs.

More papers by Vardon ›