Stanford Geothermal Workshop · Reservoir Engineering

Dieng Reservoir Numerical Model: A Robust Update

Marchel Christian SUPIJO, Ichwan Agusta ELFAJRIE, Zahratul KAMILA, ELFINA, Reza Jamil FAJRI, Julia Satriani ALIBAZAH, Aditya Yudha KENCANA, Muhammad Istiawan NURPRATAMA, Ali ASHAT

Download PDF (3096 KB) Hosted on pangea.stanford.edu

Abstract

PT Geo Dipa Energi (Persero) started developing Dieng Geothermal Field in 2002 with installed plant capacity of 60 MWe. Several Dieng numerical models have been developed in 2006, 2013, and 2019. The latest Dieng numerical model was built in 2019 as the basis of feasibility study for Dieng 2 development. With additional Dieng 2 wells data, comprehensive assessment of production and injection data of Dieng 1, and deep analysis of PT shut-in data, the updated numerical model is more robust than the previous model developed in 2019. Two reservoir compartments are considered in this model i.e. Sileri and Sikidang. The natural state and history matching for 20 years of Dieng 1 production indicated the extension (horizontally and vertically) of the steam cap distribution in Sileri area.

Details

Conference
Stanford Geothermal Workshop
Year
2024
Session
Reservoir Engineering
Paper number
Supijo
Language
English
Copyright
Stanford Geothermal Program
Keywords
Dieng geothermal field reservoir numerical model TOUGH2
Record ID
36455

Suggested citation

Marchel Christian SUPIJO, Ichwan Agusta ELFAJRIE, Zahratul KAMILA, ELFINA, Reza Jamil FAJRI, Julia Satriani ALIBAZAH, Aditya Yudha KENCANA, Muhammad Istiawan NURPRATAMA, Ali ASHAT (2024). Dieng Reservoir Numerical Model: A Robust Update. Proceedings, Stanford Geothermal Workshop 2024, Paper Supijo.

Proceedings-level reference. Individual papers do not carry DOIs.

More papers by Supijo ›