New Zealand Geothermal Workshop · Session 5.1: Production

TE MIHI GEOTHERMAL POWER STATION – HOTWELL PUMPS – A TALE OF UNINTENDED CONSEQUENCES

D. Morrison

Abstract

The Te Mihi geothermal power station hotwell pumps (HWP) are a special duty “closed can” design of pump used to extract condensate under vacuum from a direct contact condenser and return it to the cooling tower (CT).
During procurement the Engineer Procure Construct (EPC) contractor pursued a variation with the pump Original Equipment Manufacturer (OEM) for the closed can material selection. With the change in material, the can shape was modified from a typical Hydraulic Institute type of design and this affected the hydraulic performance of the can.
This case study reviews a number of lessons learned for design impacts from an apparently small change.

Details

Conference
New Zealand Geothermal Workshop
Year
2017
Session
Session 5.1: Production
Paper number
90
Language
English
Copyright
University of Auckland
Keywords
Hot Well Pump Vibration Cavitation
Record ID
28095

Suggested citation

D. Morrison (2017). TE MIHI GEOTHERMAL POWER STATION – HOTWELL PUMPS – A TALE OF UNINTENDED CONSEQUENCES. Proceedings, New Zealand Geothermal Workshop 2017, Paper 90.

Proceedings-level reference. Individual papers do not carry DOIs.