Geothermal Resources Council Transactions · Power plant design and operation; Injection; Well testing; R

Eighteen Years History of Reservoir Development in the Ogiri Geothermal Field, Japan

Takayama, Junichi; Itoi, Ryuichi; Morita, Seiya

Download unavailable for this file.

Abstract

The Ogiri geothermal power plant started its operation in March 1996 with installed capacity of 30MW. Since the beginning of operation, the plant has successfully maintained high utilization factor of over 90% in average. Timely change of well operations and developing a new area within Ogiri contributed to the long term high level productivity of the plant.

Details

Conference
Geothermal Resources Council Transactions
Year
2014
Session
Power plant design and operation; Injection; Well testing; R
Language
English
Geographic area
Ogiri, Japan
Copyright
Geothermal Resources Council
Keywords
Ogiri steam production utilization factor Ginyu fault Ogiri deep faults
Record ID
24841

Suggested citation

Takayama, Junichi; Itoi, Ryuichi; Morita, Seiya (2014). Eighteen Years History of Reservoir Development in the Ogiri Geothermal Field, Japan. Proceedings, Geothermal Resources Council Transactions 2014.

Proceedings-level reference. Individual papers do not carry DOIs.

More papers by Takayama, Junichi; Itoi, Ryuic ›