World Geothermal Congress · Case Histories

Cove Fort – Binary Power Plant

Josh NORDQUIST

Abstract

Enel Green Power acquired the rights to the Cove Fort geothermal project in 2007. In the past, the project contained an both an operational flash power plant and Organic Rankine Cycle (ORC) equipment, however, over time, the steam resource diminished. Through extensive work, Enel Green Power was able to convert the well field into a sustainable, liquid dominated geothermal resource. Additionally, the challenges of a changing power market and the approaching termination of the ITC cash grant provided a unique set of hurdles for the project to be economically attractive. These hurdles were overcome through a collaboration with Ormat Technologies; coordinating a disciplined power plant design and project execution which resulted in the project meeting its expected performance, deadlines and budget. Today, the Cove Fort geothermal power plant is operating above expectations and has proven, once again, that geothermal power is a sustainable and effective solution for today, and the future.

Details

Conference
World Geothermal Congress
Year
2015
Session
Case Histories (29 papers)
Paper number
06021
Language
English
Copyright
International Geothermal Association
Keywords
Enel Ormat Cove Fort binary integrated two-level unit
Record ID
23886

Suggested citation

Josh NORDQUIST (2015). Cove Fort – Binary Power Plant. Proceedings, World Geothermal Congress 2015, Paper 06021.

Proceedings-level reference. Individual papers do not carry DOIs.

More papers by Nordquist ›