Stanford Geothermal Workshop · Field Studies

Analysis of Stuck Pipe in Menengai

Billy Oketch AWILI

Download PDF (1250 KB) Hosted on pangea.stanford.edu

Abstract

Stuck pipe or sticking and lost circulation are the two main events which cause Non-productive time (NPT) in the drilling industry. A considerable amount of time and resources can be spent in efforts to free a stuck pipe. Sometimes, stuck pipe events result in breakage (either intentional or non-intentional) of the drill string leading to a lot of money being spent in fishing. Unsuccessful fishing operations have resulted in costly alternatives including side-tracking or worse still, well abandonment. Stuck pipe situations are very common around the world with most data gathered in the petroleum drilling industry. A stuck pipe situation has led to abandonment of a well in the Menengai drilling field, Kenya as at the date of writing this paper. This paper explores the stuck pipe problem in geothermal well drilling. The paper presents causes of stuck pipe events, predicting their occurrence and common methods used to free stuck pipe. Finally an analysis is made of stuck pipe events in a few wells drilled in Menengai, Kenya using the graphical analysis software Easy View. The results will then be discussed to identify the causes of stuck pipe in Menengai.

Details

Conference
Stanford Geothermal Workshop
Year
2015
Session
Field Studies
Paper number
Awili
Language
English
Copyright
Stanford Geothermal Program
Keywords
stuck pipe geothermal drilling Menengai field Kenya.
Record ID
20487

Suggested citation

Billy Oketch AWILI (2015). Analysis of Stuck Pipe in Menengai. Proceedings, Stanford Geothermal Workshop 2015, Paper Awili.

Proceedings-level reference. Individual papers do not carry DOIs.

More papers by Awili ›