Geothermal Resources Council Transactions · Power plant design and operation; Steam scrubbers; Brine che

Application of a Steam Purity Monitoring System at the Triple Flash Nga Awa Purua Geothermal Power Station in New Zealand

Taguchi, Kosuke; Makimoto, Shizuka; Ishii, Daisuke

Download unavailable for this file.

Abstract

The world’s largest single-cylinder geothermal turbine has recently been deployed at the Nga Awa Purua Geothermal Power Station. The rated 140MW NAP plant employs a triple flash steam separation and steam purification system. The plant utilizes conventional mechanical separation and scrubbing water injection processes but during its design, construction and commissioning, an additional automated steam purity monitoring technology was developed. This paper describes the steam purity monitoring system and its effectiveness as applied to this project.

Details

Conference
Geothermal Resources Council Transactions
Year
2010
Session
Power plant design and operation; Steam scrubbers; Brine che
Language
English
Geographic area
Kawerau, New Zealand; Taupo Volcanic Zone
Copyright
Geothermal Resources Council
Keywords
Nga Awa Purua Power generation Triple flash Steam separator Steam scrubbing Steam washing Steam purity Silica Cholride pH Non condensable gas Scaling Monitoring New Zealand
Record ID
18651

Suggested citation

Taguchi, Kosuke; Makimoto, Shizuka; Ishii, Daisuke (2010). Application of a Steam Purity Monitoring System at the Triple Flash Nga Awa Purua Geothermal Power Station in New Zealand. Proceedings, Geothermal Resources Council Transactions 2010.

Proceedings-level reference. Individual papers do not carry DOIs.

More papers by Taguchi, Kosuke; Makimoto, Shi ›