Geothermal Resources Council Transactions · Exploration; Power plant design and operation; Injection; En

Greece, Milos Island Geothermal Project

Delliou, E. E.

Download unavailable for this file.

Abstract

On Milos island (Aegean Sea) a high enthalpy water dominated geothermal field of high salinity exists. At 1985, a 2 MW geothermoelectric pilot plant was installed on the island. This plant has been provided by Mitsubishi Heavy Industries of Japan under a contract with Public Power Corporation of Greece. Due to high salinity of the geothermal fluid, unforeseen problems (scaling mainly) arised in both steam and brine cycles. As a consequence, the operation (trial mainly) of the power plant have been interrupted several time for long periods, in order to identify the arised, each time, problems and find the most appropriate technical solution. The above fact, as well as, some unfortunate coincidences, described in this paper, led Milos people to react against geothermal development in their island The sequence of the events, technical and nontechnical, their approach and the relevant conclusions are reported in this presentation.

Details

Conference
Geothermal Resources Council Transactions
Year
1990
Session
Exploration; Power plant design and operation; Injection; En
Language
English
Geographic area
Milos, Greece
Copyright
Geothermal Resources Council
Keywords
Exploration Power Generation Environmental Greece Milos Island Feasibility Pilot Projects Testing Assessment Salinity
Record ID
16065

Suggested citation

Delliou, E. E. (1990). Greece, Milos Island Geothermal Project. Proceedings, Geothermal Resources Council Transactions 1990.

Proceedings-level reference. Individual papers do not carry DOIs.

More papers by Delliou, E. E. ›