Heber Binary Project

Nelson, Tiffany T.

Download unavailable for this file.

Abstract

The need to demonstrate commercial scale, binary cycle, geothermal technology was first expressed in the mid 1970's in EPRI Report Er-1099. From those initial conceptual plans, the Heber Binary Project has finally evolved into an operating plant. Engineering was kicked off in early 1981, with construction beginning in June 1983. Start-up commenced in early 1985 culminating in the synchronization of the generator in June 1985. Half of the brine facilities are in operation with the second half scheduled for completion in mid 1987. Initial component data is being gathered, and, as the second phase of brine field development comes on stream, the plant will begin full load testing. The plant's demonstration period will continue into 1988 after which it is planned to go into commercial operation.

Details

Conference
Geothermal Resources Council Transactions
Year
1986
Session
Binary cycle power generation; Power plant design and operat
Language
English
Geographic area
Heber, California; Imperial Valley
Copyright
Geothermal Resources Council
Keywords
Power Generation Production General Engineering USA California Imperial Valley Heber Moderate Temperature Binary Cycle Rankine Cycle Reinjection Injection Case Histories Heat Exchangers Condensers Turbine Cooling Towers Cooling Waters R
Record ID
15692

Suggested citation

Nelson, Tiffany T. (1986). Heber Binary Project. Proceedings, Geothermal Resources Council Transactions 1986.

Proceedings-level reference. Individual papers do not carry DOIs.

More papers by Nelson, Tiffany T. ›