Geothermal Resources Council Transactions · Power plant design and operation; Binary cycle power generat

Project Development Desert Peak

Diddle, C. P.; Gonser, W. C.

Download unavailable for this file.

Abstract

In late 1982 Phillips Petroleum Company began preliminary design of a power plant for Desert Peak in Churchill County, Nevada. Like all geothermal resources and projects Desert Peak is unique and required careful consideration of existing process schemes and design technologies was required. This paper will review process studies, examine some of the detail design and discuss the construction program. No attempt will be made to discuss geological aspects of the resource.

Details

Conference
Geothermal Resources Council Transactions
Year
1985
Session
Power plant design and operation; Binary cycle power generat
Language
English
Geographic area
Desert Peak, Nevada
Copyright
Geothermal Resources Council
Keywords
Power Generation Production USA Nevada Churchill Engineering Wellhead Separators Binary Systems Piping Systems Flow Rates Gathering Systems Software
Record ID
15478

Suggested citation

Diddle, C. P.; Gonser, W. C. (1985). Project Development Desert Peak. Proceedings, Geothermal Resources Council Transactions 1985.

Proceedings-level reference. Individual papers do not carry DOIs.

More papers by Diddle, C. P.; Gonser, W. C. ›