Geothermal Resources Council Transactions · Well completion; HDR/EGS; Hydraulic fracturing; Tubulars

Improvement of Tubulars Used for Fracturing in Hot Dry Rock Wells

Nicholson, Robert W.; Dreesen, Donald S.; Turner, William C.

Download unavailable for this file.

Abstract

Completion of hot dry rock wells as it is currently envisioned, requires that hydraulic fracturing be used to develop a heat extraction reservoir and to provide low impedance flow paths between the designated water injection and production wells. Recent fracturing operations at measured depths from 11,400 ft to 15,000 ft at the Fenton Hill Hot Dry Rock Geothermal Test site have resulted in numerous failures of tubular caused by the high fracturing pressures, corrosive environment and large treatment volumes at high flow rates. Two new fracturing strings were designed and purchased. Physical and chemical properties exceeding API specifications were demanded and supplied by the manufacturers. These tubular have performed to design specifications.

Details

Conference
Geothermal Resources Council Transactions
Year
1984
Session
Well completion; HDR/EGS; Hydraulic fracturing; Tubulars
Language
English
Geographic area
Fenton Hill, New Mexico; Valles Caldera, New Mexico
Copyright
Geothermal Resources Council
Keywords
Well Completion Hot Dry Rock USA New Mexico Fenton Hill Tubing Metallurgy Materials Stimulation Hydraulic Fracturing
Record ID
15325

Suggested citation

Nicholson, Robert W.; Dreesen, Donald S.; Turner, William C. (1984). Improvement of Tubulars Used for Fracturing in Hot Dry Rock Wells. Proceedings, Geothermal Resources Council Transactions 1984.

Proceedings-level reference. Individual papers do not carry DOIs.

More papers by Nicholson, Robert W.; Dreesen, ›