Project Development Desert Peak 9 MW Power Plant

Cerini, D. J.; Diddle, C. P.; Gonser, W. C.

Download unavailable for this file.

Abstract

In late 1982 Phillips Petroleum Company began preliminary design of a power plant for Desert Peak in Churchill County, Nevada. Like all geothermal resources and projects Desert Peak is unique and required careful consideration of existing process schemes and design technologies. This paper is limited to discussing the evolution of surface facilities design and will not attempt to review geological aspects of the resource. Although specific conclusion may not be applicable to other projects, process and design considerations discussed in this paper should be reviewed to ensure maximum conversion efficient for any new facility.

Details

Conference
Geothermal Resources Council Transactions
Year
1984
Session
Power plant design and operation; Hybrid power generation; T
Language
English
Geographic area
Desert Peak, Nevada
Copyright
Geothermal Resources Council
Keywords
Power Generation Production Economics USA Nevada Churchill Desert Peak Cooling Towers Air Cooling Two Phase Separators Power Plant Design Power Plant Cycle Binary Hybrid Systems Process Control Efficiency Estimates Rotary Separator Turbi
Record ID
15283

Suggested citation

Cerini, D. J.; Diddle, C. P.; Gonser, W. C. (1984). Project Development Desert Peak 9 MW Power Plant. Proceedings, Geothermal Resources Council Transactions 1984.

Proceedings-level reference. Individual papers do not carry DOIs.

More papers by Cerini, D. J.; Diddle, C. P.; ›