Geothermal Resources Council Transactions · Geopressured reservoirs; Methane; Oil and gas co-production;
Methane Extraction From Geopressured-Geothermal Brine at Wellhead Conditions
Abstract
Disposal of geopressured geothermal brine effluents by injection this expected to be costly, even into shallow aquifers. If injection into the production reservoir becomes necessary to maintain productivity and to minimize subsidence, the injection pumping costs can become overwhelming. An option aimed at reducing injection pump operating costs is to maintain a higher than normal pressure at the production wellhead to reduce the injection pumping work load. The crucial element, however, is that a significant portion of CH4 remains in the solution an must be recovered in order for the pressure maintenance option to be cost effective. A laboratory and field test capability has been established, and were are presently evaluation several methods for extracting dissolved CH4 at high temperature and pressure. Solvent extraction and use of hydraulic motors or turbines coupled to CH4 recovery systems are the leading candidate methods.
Details
Suggested citation
Quong, R.; Owen, L. B.; Locke, F. E.; Otto, C. H.; Netherton, R.; Lorensen, L. E. (1980). Methane Extraction From Geopressured-Geothermal Brine at Wellhead Conditions. Proceedings, Geothermal Resources Council Transactions 1980.
Proceedings-level reference. Individual papers do not carry DOIs.