Recent Development of 30 MW Kamojang Geothermal Power Project, West Java, Indonesia
Abstract
This paper has been prepared to discuss various problems of geothermal energy studies for the development of the Kamojang field in West java, Indonesia for the production of 30 MW power plant capacity. These studies, carried out by the Indonesian Government in cooperation with the New Zealand Government, are primarily based on the information gained during reconnaissance survey, initial investigation, and exploration and production wells testing. Production drilling of ten wells started in 1976 followed by design of structural, mechanical and electrical equipment, and the steam gathering system. The construction of this power plant required approximately 48 months. The jobs occur in three major phases: (1) site development (2) foundation and building construction, and (3) equipment installation. With successful production drilling, design and construction of this project, the Indonesian engineers will gain valuable experience.
Details
Suggested citation
Basoeki, Mohammed; Radja, Vincent T. (1978). Recent Development of 30 MW Kamojang Geothermal Power Project, West Java, Indonesia. Proceedings, Geothermal Resources Council Transactions 1978.
Proceedings-level reference. Individual papers do not carry DOIs.