World Geothermal Congress · Advances in Well Engineering and Pump Technology - Part 2
Tubing Impossible: Rig-less Casing Repair in a Geothermal Well with Coiled Tubing
Abstract
Maintaining casing integrity is crucial for the long-term reliability and safety of geothermal monitoring wells. This paper presents a successful rig-less intervention using high-capacity coiled tubing (HCCTU) technology to clean out and restore a compromised geothermal well. Conducted in mid-2025, the operation achieved two primary objectives: removal of wellbore obstructions at approximately 219 m and 731 m measured depth (MD) and, most importantly, the restoration of casing integrity by installing and cementing a 6-5/8in casing string from surface to 461 m MD.
This intervention marks the first application of HCCTU on a geothermal well of this configuration in New Zealand, demonstrating a viable alternative to conventional rig-based workovers. The paper provides an overview of the engineering design, including the selection of tools and materials, and the operational execution, detailing the step-by-step process of the intervention. It also discusses technical challenges such as tool wear, thermal management, and real-time diagnostics. The methodology offers a scalable, low-impact approach for geothermal interventions requiring minimized surface footprint and improved operational efficiency. This paper aims to demonstrate the viability of rig-less casing repairs of geothermal wells, and offer insight into future applications of HCCTU in the geothermal industry.
Details
Suggested citation
Edgina Kemala, Toby Ryan, Ben Drew, Sam Payne (2026). Tubing Impossible: Rig-less Casing Repair in a Geothermal Well with Coiled Tubing. Proceedings, World Geothermal Congress 2026, Paper 999803.
Proceedings-level reference. Individual papers do not carry DOIs.