-
Merga Tassew
·
World Geothermal Congress
·
2010
·26. Power Generation
Ethiopia is well endowed with geothermal resources, and current exploration is believed to have studied only a fraction of the ultimate potential. The potential prospective areas are distributed along the Ethiopian Rift valley system which runs in a northeast …
View paper: Maintenance and Operational Experience Gained By Operating the Aluto Langano Geothermal Pilot Power Plant
PDF: Maintenance and Operational Experience Gained By Operating the Aluto Langano Geothermal Pilot Power Plant (98KB)
-
Tassew, Merga
·
Geothermal Resources Council Transactions
·
2009
·Power plant design and operation; Operations management
Ethiopia is well endowed with geothermal resources, and current exploration is believed to have studied only a fraction of the ultimate potential. The potential prospective areas are distributed along the Ethiopian Rift valley system which runs in a northeast …
View paper: Maintenance and Operational Experience Gained by Operating the Aluto Langano Geothermal Pilot Power Plant
Download unavailable
-
Netzel, Tom L.
·
Geothermal Resources Council Transactions
·
1993
·Wellheads; Corrosion; Well servicing; Well casing
View paper: Wellhead Casing Thickness Measurement and Repairs
Download unavailable
-
Gudmundsson, J. S.
·
Geothermal Resources Council Transactions
·
1983
·Injection; Reservoir management; Well testing; Injection tes
… maintain reservoir pressure. Cold water was injected into well 12 at Svartsengi for 24 days in 1982. Fluid chemistry was monitored in 6 production wells for about 70 days. Breakthrough indicated by lower sodium concentration (due to dilution of brine by …
View paper: Injection Testing in 1982 at the Svartsengi High-Temperature Field in Iceland
Download unavailable
-
Geertjan van Og, Floris Degener, Arturs Blinovs, Ryvo Octaviano, Demetris Palochis,
Leila Hashemi, Pejman Shoeibi Omrani
·
Der Geothermiekongress
·
2025
… tool to optimise the performance and to gain control on well integrity risks. This paper presents a digital twin framework for geothermal systems, focusing on two key challenges for long-term field and assets performance: injectivity and well integrity. …
View paper: Geothermal Digital Twins
PDF: Geothermal Digital Twins (974 KB)
-
Ilen KARDANI, Budi SANTOSO, Andisyah PURDANTO
·
Stanford Geothermal Workshop
·
2024
·Production Engineering
… facilities, and is structured into four key areas: 1. Idle Well Utilization: As the drilling of 12 wells on progress and construction of a power plant still ongoing, the strategic utilization of idle wells takes center stage. This study investigates …
View paper: Optimizing Power Generation in Patuha Geothermal Field: an Integrated Approaches to Field Management for Optimum Capacity and Reliability
PDF: Optimizing Power Generation in Patuha Geothermal Field: an Integrated Approaches to Field Management for Optimum Capacity and Reliability (1127 KB)
-
Perrone, Greg; Mendoza, Alejandro
·
Geothermal Resources Council Transactions
·
2019
·Wellbore integrity; Scaling; Corrosion; Welding
View paper: Welding; Properties, Characteristics and Applications in the Geothermal Industry
Download unavailable
-
A.H. Truesdell, M.J. Lippmann, J.L. Quijano and F. D'Amore
·
World Geothermal Congress
·
1995
·SECTION 7 - Field Management and Monitoring
… and geochemical processes occurring in the reservoir and wells. These processes include coldwater entry, near-well boiling, reservoir-wide boiling, production of injectate, scaling in the wellbore or in the formation, and entry of fluid through casing …
View paper: Chemical and Physical Indicators of Reservoir Processes in Exploited High-Temperature, Liquid-Dominated Geothermal Fields
PDF: Chemical and Physical Indicators of Reservoir Processes in Exploited High-Temperature, Liquid-Dominated Geothermal Fields
-
Dominguez A., Bernardo
·
Geothermal Resources Council Transactions
·
1981
·Exploration; Power plant design and operation; Flash steam p
The generation of 75,000 Kw, with turbines 1 and 2, of 37,500 Kw, for each one, started in the years 1973, with excellent results, that for 1979, the capacity of the Main Plants was increased, with the turbines 3 and 4, similar to the first ones, reaching the …
View paper: Brief Commentaries of the Generation in the Main Plant in Cerro Prieto
Download unavailable