Skip to content
International Geothermal Association Conference Paper Database Live

Searches title, authors, abstract, keywords and session. Use "quotes" for an exact phrase.

Advanced search

All filled fields must match. Conference and year are added to the filters on the left.

Filters

Show filters
Conference
Year
–

1–9 of 9 papers

  1. Rotokawa upgrade project: Midlife geothermal power plant development and optimisation

    O. Goh, L. McLellan · New Zealand Geothermal Workshop · 2024 ·Session 2.2 - PRODUCTION & MANAGEMENT 1

    … the geothermal fluid enthalpy has declined. The Rotokawa Upgrade project was initiated to mitigate the impact of this enthalpy decline on the generation output of the two power stations. This midlife upgrade project sought to rebalance the steam and brine …

    View paper: Rotokawa upgrade project: Midlife geothermal power plant development and optimisation PDF: Rotokawa upgrade project: Midlife geothermal power plant development and optimisation (774KB)

  2. Turbine Upgrade for Geysers Geothermal Power Plant

    Maedomari, Junichiro; Avery, John · Geothermal Resources Council Transactions · 2011 ·Turbines

    … geothermal power plants. Toshiba performed the turbine upgrade, which included the steam path redesign optimized to the reduced steam inlet deliverability and applied new technology for performance improvement and erosion/corrosion countermeasures, for …

    View paper: Turbine Upgrade for Geysers Geothermal Power Plant Download unavailable

  3. Capacity Upgrade by Turbine Modification at Gunung Salak Geothermal Power Plant and Its Voluntary Emission Credits Generation

    Alin Pratidina and Antonius R. T. Artono · World Geothermal Congress · 2010 ·35. Clean Development Mechanism

    … company, is aware that geothermal power plant capacity upgrade could be one solution to increase electricity generation from renewable energy. Meanwhile, other power generation companies consider new geothermal power plant construction as an option to …

    View paper: Capacity Upgrade by Turbine Modification at Gunung Salak Geothermal Power Plant and Its Voluntary Emission Credits Generation PDF: Capacity Upgrade by Turbine Modification at Gunung Salak Geothermal Power Plant and Its Voluntary Emission Credits Generation (392KB)

  4. Steam Separator Selection for a Geothermal Power Station

    L. McLellan, K. Koorey · New Zealand Geothermal Workshop · 2021 ·Session 5.4 - Production and Management 3

    … the North Island of New Zealand. As part of the Rotokawa Upgrade project, Mercury installed two horizontal steam-brine separators in 2021. The horizontal separator design was a first for Mercury and two of only a few of those installed within the New …

    View paper: Steam Separator Selection for a Geothermal Power Station PDF: Steam Separator Selection for a Geothermal Power Station (526KB)

  5. Generator Excitation System Replacement in Geothermal Power Stations – Merits and Pitfalls

    G. Paloso Jr., D. Preston · New Zealand Geothermal Workshop · 2020 ·Session 3.1 Above Ground Technology 1

    … of technologies currently available in the market. The upgrade work has to consider the interfaces between the excitation system and other equipment, such as control system DCS, electrical protection relays, dependable power supplies, measuring devices, …

    View paper: Generator Excitation System Replacement in Geothermal Power Stations – Merits and Pitfalls PDF: Generator Excitation System Replacement in Geothermal Power Stations – Merits and Pitfalls (356KB)

  6. Steam Turbine Blade Erosion Protection Options

    Leger, Donald R.; Franklin, Paul · Geothermal Resources Council Transactions · 2020 ·Equipment design; Turbines; Power plant design and operation

    View paper: Steam Turbine Blade Erosion Protection Options Download unavailable

  7. Tiwi Geothermal Brine Injection Surface Facility Developments as Response to Changing Subsurface Conditions

    Jakechris SICAD · World Geothermal Congress · 2015 ·Production Engineering, Steam Gathering Systems

    The Tiwi steam field has been in operation for the past 35 years and over the last 15 years it has witnessed changes in operating system and reservoir conditions which have ultimately affected the brine injection systems and brine disposal strategies. The …

    View paper: Tiwi Geothermal Brine Injection Surface Facility Developments as Response to Changing Subsurface Conditions PDF: Tiwi Geothermal Brine Injection Surface Facility Developments as Response to Changing Subsurface Conditions (1258 KB)

  8. Extending Asset Life and Enhancng Value through Steam Path Retrofits

    Cunningham, Kevin; Clews, Donald C.; Hurgin, Max · Geothermal Resources Council Transactions · 2011 ·Power plant design and operation; Turbines

    The Northern California Power Agency (NCPA), headquartered in Roseville, California, is a joint power agency formed in 1968 to provide its members with electrical energy purchasing aggregation, scheduling and management. The NCPA owns and operates a number of …

    View paper: Extending Asset Life and Enhancng Value through Steam Path Retrofits Download unavailable

  9. Mitsubishi's Reliable Solutions and Domestic Service Infrastructure

    Riaz, Muhammad; Sanchez, Marco; Grace, Scott · Geothermal Resources Council Transactions · 2011 ·Turbines; Corrosion; Stress corrosion cracking; Scaling; Org

    abstract not provided

    View paper: Mitsubishi's Reliable Solutions and Domestic Service Infrastructure Download unavailable

Papers are freely accessible. Copyright remains with the authors and conference organisers as stated on each paper.

IGA Conference Paper Database · New search