Freyr HARDARSON, Sigurgeir B. GEIRSSON, Karl E. SVEINSSON, J. Gardar EINARSSON, Arni V. SIGURDSSON, Sigurgeir B. GEIRSSON, Valur KNUTSSON
·
World Geothermal Congress
·
2020
·Production Engineering, Steam Gathering Systems
The steam supply for Theistareykir Geothermal Power Plant is a single flash cycle providing steam for 2x45 MWe turbine units whereas the separated water is mixed with steam condensate from the units and reinjected. The steam supply has been in operation from …
View paper: Theistareykir Geothermal Power Plant, Description of the Steam Supply System: Design, Operation and Experience Gained
PDF: Theistareykir Geothermal Power Plant, Description of the Steam Supply System: Design, Operation and Experience Gained (2962 KB)
-
Achmad Sani ZAHID, Mukhamad NASHIR, Viqar Adly GANI, Bagus Reka SUSILO, Manda Wijaya KUSUMAH, Apriyansah TONI
·
World Geothermal Congress
·
2020
·Production Engineering, Steam Gathering Systems
Pertamina Geothermal Energy ( PGE ) operates geothermal steam fields in Lahendong, North Sulawesi, Indonesia; by supplying steam to PLN's GPP Unit 1, 2, 3, and 4 from 6 production clusters, which are cluster 4, 13, 13B, 24, 5 and 37. Steam from cluster 4 and …
View paper: Pipeline Debottlenecking Project to Maintain Steam Supply of Geothermal Power Plant Unit 1-4 at PGE Lahendong
PDF: Pipeline Debottlenecking Project to Maintain Steam Supply of Geothermal Power Plant Unit 1-4 at PGE Lahendong (932 KB)
-
Ahmad Fahmi FANANI, Benedict Amandus HANANTO, Dhanie Marstiga YUNIAR
·
Stanford Geothermal Workshop
·
2025
·Production Engineering
… Lahendong geothermal fields are related to the decline in steam supply from existing production wells. This can be caused by various factors, including reservoir pressure decline or damage to production wells. On the other hand, there are several marginal …
View paper: Utilization Potential of Marginal Well to Maintain Steam Supply to Geothermal Power Plants: Case Study of Lahendong Field, Indonesia
PDF: Utilization Potential of Marginal Well to Maintain Steam Supply to Geothermal Power Plants: Case Study of Lahendong Field, Indonesia (653 KB)
-
A. E. Amistoso, A. R. Aqui, D. M. Yglopaz and R.C.M. Malate
·
World Geothermal Congress
·
2005
·24. Field Management
Steam supply to the 112.5 MWe power plant in Palinpinon 1 has declined after more than 20 years of continuous exploitation. Pressure drawdown combined with effects of injection returns has been the major reservoir process affecting steam production. The …
View paper: Sustaining Steam Supply in Palinpinon 1 Production Field, Southern Negros Geothermal Project, Philippines
PDF: Sustaining Steam Supply in Palinpinon 1 Production Field, Southern Negros Geothermal Project, Philippines (212KB)
-
A.V. Kiryukhin
·
Stanford Geothermal Workshop
·
2004
·FIELD STUDIES
… author (Kiryukhin, 1992, 1996, 2002) has shown that total steam production of the wells existing in 1991 will yield not less than 44 MWe. In October 2002 Mutnovsky 50 MWe PP was put into operation in Dachny site. The problem of steam supply to Mutnovsky 50 …
View paper: Modeling Study of the Mutnovsky Geothermal Field (DACHNY) in Connection with the Problem of Steam Supply for 50 MWe PP
PDF: Modeling Study of the Mutnovsky Geothermal Field (DACHNY) in Connection with the Problem of Steam Supply for 50 MWe PP (3623KB)
-
Dell, R.; Wei, C. S.; Sidebotham, G.; Jonsson, Magnus Thor; Unnborsson, Runar
·
Geothermal Resources Council Transactions
·
2011
·Electric generators; Waste heat recovery; Piping
… that is designed to be clamped onto the outer wall of a steam pipe with a temperature of 160°C plus was built and tested in ambient temperatures from 30 to 85°C. The system consists of a pair of assemblies mounted on opposite sides of a pipe. Each …
View paper: A Thermoelectric-Based Point of Use Power Generator for Steam Pipes
Download unavailable
-
Freyr Harðarson(), Kristinn Ingason
·
World Geothermal Congress
·
2026
·Advances in Power Plants - Part 1
… generation will increase. The geothermal power plant’s steam turbines can easily adjust the load to accommodate varying production of wind turbines. Variable extraction from the resource is however more difficult and most usually the geothermal fields …
View paper: Potential of High Enthalpy Geothermal Power Plants to Operate at Variable Load
PDF: Potential of High Enthalpy Geothermal Power Plants to Operate at Variable Load
-
Hardarson, Freyr; Heimisson, Birkir; Geirsson, Sigurgeir Bjorn; Emilsson, Jon Arnar; Baldursdottir, Iris; Knutsson, Valur
·
Geothermal Resources Council Transactions
·
2018
·Power plant design and operation; Energy markets; Transmissi
View paper: Theistareykir Geothermal Power Plant, Challenges in a Weak Electrical Grid
Download unavailable