Mohamad Husni MUBAROK, Yanuaris Dwi CAHYONO, Salvius PATANGKE, Eben Ezer SIAHAAN
·
World Geothermal Congress
·
2015
·Production Engineering, Steam Gathering Systems
… but there are two commonly used methods, lip pressure and separator method. Lip pressure method can be performed in an upright (vertical discharge) or in a flat (horizontal discharge). Basically, both methods have the same purpose, its to clean the drill …
View paper: The Statistical Analysys Comparison Between Lip Pressure and Separator in Production Well Testing at Lahendong and Ulubelu Field
PDF: The Statistical Analysys Comparison Between Lip Pressure and Separator in Production Well Testing at Lahendong and Ulubelu Field (715 KB)
-
Pointon, Alan R.; Mills, Tracy D.; Seil, Gregory J.; Qihong Zhang
·
Geothermal Resources Council Transactions
·
2009
·Steam separators; Fluid dynamics
… power plant have progressively moved to more centralised separator stations located relatively close to the power plant. Consequently, clients have been expecting individual separators to handle increasing large fluid flows. While SKM achieves …
View paper: Computational Fluid Dynamic Techniques for Validating Geothermal Separator Sizing
Download unavailable
-
Somera, John Joeffrey
·
Geothermal Resources Council Transactions
·
2018
·Reservoir management; Pressure drawdown; Production decline
View paper: Detecting Changes in Production of Fluctuating Wells through High Frequency Surface Pressure Monitoring
Download unavailable
-
Carroll, Patrick; Ershen, Catherine L.; Cushman, Timothy
·
Geothermal Resources Council Transactions
·
2011
·Condensers; Steam separators; Power plant design and operati
In geothermal steam applications such as steam separators, flash tanks, and condensers, accurate level measurements can be challenging because of dynamic process conditions. Process densities, which vary from what was initially specified, will result in …
View paper: Level Measurement Challenges in Geothermal Power Plants and Improved Solutions
Download unavailable
-
Iraj GHADERI, Yosef SAFAVI
·
World Geothermal Congress
·
2015
·Power Generation
… and Enthalpy of outlet fluid from the well. Design of separator for separation & providing feed steam of condensing turbine of power plant is the object of present paper. Corresponding to each position of throttle valve calculation was carried out to …
View paper: Evaluation of Well NWS-6D Potential as Energy Resource for 5MWe Sabalan Pilot Power Plant Project
PDF: Evaluation of Well NWS-6D Potential as Energy Resource for 5MWe Sabalan Pilot Power Plant Project (1151 KB)
-
Vilma T. Capuno, Napoleon L. Saporsantos, Maria Teresa F. Amorin and Sol K. M. Regalado
·
World Geothermal Congress
·
2010
·27. Corrosion and Scaling
… parameters shown to significantly affect steam purity were separator level and separator pressure. When all these three operational parameters were controlled within the recommended limits, chloride readings never exceeded 0.1 ppm in the power plant
View paper: Steam Purity Monitoring Using Statistical Process Control
PDF: Steam Purity Monitoring Using Statistical Process Control (77KB)
-
Jung, Douglas B.
·
Geothermal Resources Council Transactions
·
1997
·Economics; Power plant design and operation; Pipelines; Scal
View paper: Making Geothermal Cost Competitive: Production Equipment and Facilities Cost Reduction
Download unavailable