Panurach DUMRONGTHAI, William MAHAPUTRA
·
World Geothermal Congress
·
2015
·Business Strategies
… execution phase. Many times, there are conflicts among the project team members as each discipline has their own interest, objective, and priority. The geologist usually is interested in getting as much as possible geological information. The reservoir …
View paper: SW-CPDEP, Project Management Process for the Right Decision in Geothermal Field Drilling and Completion
PDF: SW-CPDEP, Project Management Process for the Right Decision in Geothermal Field Drilling and Completion (643 KB)
-
Rodzianko, Paul
·
Geothermal Resources Council Transactions
·
1979
·Economics; Direct use; Risk management; Financing; Power pla
… been presented in the context of electric power generation projects. The author will outline the advances such financing approaches have encountered within the last year and discuss optimized development strategies related thereto. In addition, he will …
View paper: Intermediary Risk Assuming Vehicles: Financing Geothermal Energy Development Projects
Download unavailable
-
Eliasson, Larus; Smith, Christopher
·
Geothermal Resources Council Transactions
·
2011
·Financing; Business administration; Risk management; Economi
When we consider the cost of projects, then we have two types of cost, technical and financial where each can be split into two subcategories giving four major cost components: 1. Technical cost, here predominately capital expenditure 2. Technical cost as …
View paper: When Smaller Is Better--Cost/Size/Risk Analysis of Geothermal Projects
Download unavailable
-
Yamazawa, Shigeyuki; Tosha, Toshiyuki; Horikoshi, Takamasa; Ide, Tomonori
·
Geothermal Resources Council Transactions
·
2001
·Reservoir Evaluation; Geophysical surveys; Seismicity; Reser
View paper: NEDO's Project on Development of Technology for Reservoir Mass and Heat Flow Characterization Geophysical Monitoring Techniques
Download unavailable
-
Wang Yuanming, Yin Heng, Jia Honggang
·
Beijing International Geothermal Symposium
·
2002
·Management of Geothermal Resources
… data base., The system software was written based on MCGS project control software. The temperature, water level and flow rate of the well will be measured by means of sensor devices which are located on the well head. All electric current and voltage …
View paper: EXPERIMENT AND DEVELOPMENT OF REMOTE MONITIORING SYSTEM FOR GEOTHERMAL WELLS IN BEIJING
PDF: EXPERIMENT AND DEVELOPMENT OF REMOTE MONITIORING SYSTEM FOR GEOTHERMAL WELLS IN BEIJING (sale only)
-
Harrison, R.
·
Geothermal Resources Council Transactions
·
1986
·Economics; Direct use; District heating/cooling; Space heati
… the physical characteristics. On average, greenhouse and process heating schemes were found to be the most attractive and heat pump application the least.
View paper: Economics of Some Direct Use Geothermal Schemes in the U.S.A.
Download unavailable
-
Fontes, Roger A.
·
Geothermal Resources Council Transactions
·
1984
·Economics; Power plant design and ooperation; Air quality; B
The challenge: to optimize the potential of a large single geothermal steam field through design and development of an integrated electric power generating system linking two plants containing a total of four separate turbine generator units. How the Northern …
View paper: NCPA Geysers Geothermal Development of Integrated Steam Field Management System
Download unavailable