Skip to content
International Geothermal Association Conference Paper Database Live

Searches title, authors, abstract, keywords and session. Use "quotes" for an exact phrase.

Advanced search

All filled fields must match. Conference and year are added to the filters on the left.

Filters

Show filters
Conference
Year
–

1–25 of 52 papers

  1. A Global Perspective on Aligning Resource Assessment, Technological Evaluation, and Financial Analysis for Geothermal Project Development

    Kennard Maturgo, John Gilliland, Duncan Steven, Martin Pujol, Neale Young · Philippine International Geothermal Congress · 2025

    … and boost existing markets. It analyzes and compares project development factors in geothermal power generation and direct-use heat application, such as techno-economic assessment, risk management strategy and economic outcome, which focuses on …

    View paper: A Global Perspective on Aligning Resource Assessment, Technological Evaluation, and Financial Analysis for Geothermal Project Development PDF: A Global Perspective on Aligning Resource Assessment, Technological Evaluation, and Financial Analysis for Geothermal Project Development (347KB)

  2. Direct Large-Scale Vs. Staged Geothermal Field Development: Evaluating Pros and Cons and the Economic Impacts for Projects in Indonesia

    Daniel ADITYATAMA, Ferdino R. FADHILLAH, M. Rizqi Al ASYARI, Dorman PURBA, Nadya ERICHATAMA, Vincentius Adven BRILIAN · Stanford Geothermal Workshop · 2024 ·General

    … two scenarios may have different impacts on the whole project's economics. This paper delves into the multifaceted nature of geothermal project development, highlighting the significant upfront capital required due to the inherent risks and exploration …

    View paper: Direct Large-Scale Vs. Staged Geothermal Field Development: Evaluating Pros and Cons and the Economic Impacts for Projects in Indonesia PDF: Direct Large-Scale Vs. Staged Geothermal Field Development: Evaluating Pros and Cons and the Economic Impacts for Projects in Indonesia (1790 KB)

  3. Bridging the Gap Between Project Planning and Execution--A Case of Menengai Geothermal Prospect of Geothermal Development Company in Kenya

    Mwangi, Jane; Langat, Diana · Geothermal Resources Council Transactions · 2011 ·Business administration; Operations management

    … tracking of performance and reporting at every stage of a project are all essential in project execution. Kenya has a geothermal potential of over 10000 MWe along its rift system and Geothermal Development Company (GDC) was formed to fast track its …

    View paper: Bridging the Gap Between Project Planning and Execution--A Case of Menengai Geothermal Prospect of Geothermal Development Company in Kenya Download unavailable

  4. Deep Groundsourced Heat Exchanger with Coaxial Pipe, Closed Water Circuit-Improvement Proposals in Project Development and Technical Pipe Conception

    Robert John Doelling and Iver Schulte · World Geothermal Congress · 2010 ·8. Business Strategies

    … wells without risky investments in seismics. Projects can be started by test drillings and being finished as DGHE in case of non-profitable well usage. This paper shows a technical concept to dimension the bore hole diameter in a way that, if …

    View paper: Deep Groundsourced Heat Exchanger with Coaxial Pipe, Closed Water Circuit-Improvement Proposals in Project Development and Technical Pipe Conception PDF: Deep Groundsourced Heat Exchanger with Coaxial Pipe, Closed Water Circuit-Improvement Proposals in Project Development and Technical Pipe Conception (225KB)

  5. Recent Geothermal Activities and Developments in Turkey and Projections for the Year 2013

    Orhan Mertoglu, F. Murat Mertoglu, Nilgun Bakir, Tevfik Kaya · European Geothermal Conference · 2007 ·Country Updates

    … drying, cooling, fish farming, mineral recovery) 2013 projections has been estimated as 8000 MWt (35.040.000 MWth/year). The total investment required to reach the 2013 goals for geothermal electricity production, district heating (houses, thermal …

    View paper: Recent Geothermal Activities and Developments in Turkey and Projections for the Year 2013 PDF: Recent Geothermal Activities and Developments in Turkey and Projections for the Year 2013 (72KB)

  6. Sustainable Development of Geothermal Resources in China and Future Projects

    Tingshan Tian and Shangyao Huang · World Geothermal Congress · 2005 ·5. Sustainability

    … of chemicals and others. At present, the long-term project of the future geothermal development in China is compiling. In this paper the development and utilization status of geothermal resources in China are presented. Several tables are given in …

    View paper: Sustainable Development of Geothermal Resources in China and Future Projects PDF: Sustainable Development of Geothermal Resources in China and Future Projects (98KB)

  7. The Establishment of a Global Network to Support Renewable Energy Projects in Development Countries

    Todd R. Bartholf and Robert H. Bell · World Geothermal Congress · 1995 ·SECTION 3 Geothermal Energy in the National Energy Policy

    … and financial pon services developers of renewable energy projects in developing countries. Known as Renewable Energy Project Support Officer (REPSOs),these facilities aremanaged by institutions in coordination with Winrock's Renewable Energy and the …

    View paper: The Establishment of a Global Network to Support Renewable Energy Projects in Development Countries PDF: The Establishment of a Global Network to Support Renewable Energy Projects in Development Countries

  8. Intermediary Risk Assuming Vehicles: Financing Geothermal Energy Development Projects

    Rodzianko, Paul · Geothermal Resources Council Transactions · 1979 ·Economics; Direct use; Risk management; Financing; Power pla

    … been presented in the context of electric power generation projects. The author will outline the advances such financing approaches have encountered within the last year and discuss optimized development strategies related thereto. In addition, he will …

    View paper: Intermediary Risk Assuming Vehicles: Financing Geothermal Energy Development Projects Download unavailable

  9. Project Development Update of the Dieng Unit-2 Geothermal Power Plant, Dieng Geothermal Field, Indonesia

    Rizkhy Ridoh ALAMSYAH, Iqbal MARATAMA, Siti Olivinia YUSRA, Randy Wijaya ATMAJA, Ingria Yunanda Muhammad ARRASY · Stanford Geothermal Workshop · 2024 ·Field Studies

    … to obtain capacity of approximately 55+10% buffer MWe. The development plan will be concentrated in the Sileri area with early estimation of at least 6.2 square-kilometers proven area. The plan has been designed to achieve maximum steam availability, …

    View paper: Project Development Update of the Dieng Unit-2 Geothermal Power Plant, Dieng Geothermal Field, Indonesia PDF: Project Development Update of the Dieng Unit-2 Geothermal Power Plant, Dieng Geothermal Field, Indonesia (1904 KB)

  10. Geothermal Energy Utilisation, Development and Projections - Country Update Report (2000-2004) of Turkey

    Sakir Simsek, Orhan Mertoglu, Nilg¸n Bakir, Ibrahim Akkus, Onder Aydogdu · World Geothermal Congress · 2005 ·1. Country Updates

    … country in the world in geothermal potential. Most of the development is achieved in geothermal direct-use applications by 65,000 residences equivalence geothermal heating (750 MWt) including district heating, thermal facilities and 635,000 m2 geothermal …

    View paper: Geothermal Energy Utilisation, Development and Projections - Country Update Report (2000-2004) of Turkey PDF: Geothermal Energy Utilisation, Development and Projections - Country Update Report (2000-2004) of Turkey (229KB)

  11. A Five-Phase Linear Workflow for Geothermal Power Project Development

    Hernandez, Jonathan A.; Robertson-Tait, Ann; · Geothermal Resources Council Transactions · 2023 ·Exploration; Drilling; Feasibility studies; Workflow

    View paper: A Five-Phase Linear Workflow for Geothermal Power Project Development Download unavailable

  12. The CDM and Geothermal Projects, Indonesia

    Fadli Cahyono · World Geothermal Congress · 2010 ·35. Clean Development Mechanism

    Developing a geothermal power plant project is a financial challenge, and is harder than developing more traditional forms of renewable energy. One aim of the Kyoto protocol is to speed up the development of renewable energy power and indeed the evolution of …

    View paper: The CDM and Geothermal Projects, Indonesia PDF: The CDM and Geothermal Projects, Indonesia (112KB)

  13. Geothermal for Mega Projects: A Use-Case Strategy for Scalable, Low-Risk Deployment

    Luca G. Xodo, Thomas W. Thompson, Jón Ö. Jónsson · World Geothermal Congress · 2026 ·District Heating, Urban Flexibility and Residual Heat Use

    Mega infrastructure projects demand energy systems that are not only sustainable, but also rapidly deployable and low-risk. This presentation explores how geothermal energy can meet that challenge, using NEOM’s pioneering geothermal program in the Kingdom of …

    View paper: Geothermal for Mega Projects: A Use-Case Strategy for Scalable, Low-Risk Deployment PDF: Geothermal for Mega Projects: A Use-Case Strategy for Scalable, Low-Risk Deployment

  14. Principles, Criteria & Indicators (PC&I) framework for sustainable subsurface development

    Alexandros Daniilidis · World Geothermal Congress · 2026 ·Poster

    … & Indicators framework is developed in the DIAMONDS project (Compernolle et al., 2023). This framework consists of three hierarchical levels. The first level, the principles, encompasses the universal values that determine sustainability. For the …

    View paper: Principles, Criteria & Indicators (PC&I) framework for sustainable subsurface development PDF: Principles, Criteria & Indicators (PC&I) framework for sustainable subsurface development (1439KB)

  15. Developing Geothermal Projects Using Energy Demand Profiles in the Pannonian Basin

    Attila TALAMON, Attila KUJBUS · Stanford Geothermal Workshop · 2024 ·Field Studies

    … has developed and implemented a large number of geothermal projects. The needs of industrial and municipal customers have changed significantly in recent years. The analysis of customer profiles (district heating, town communal heating, industrial, …

    View paper: Developing Geothermal Projects Using Energy Demand Profiles in the Pannonian Basin PDF: Developing Geothermal Projects Using Energy Demand Profiles in the Pannonian Basin (1199 KB)

  16. Managing Multiple Projects: the Story from Indonesia

    Marmelia Puja DEWI, Tavip DWIKORIANTO · World Geothermal Congress · 2020 ·Field Management

    The Geothermal Projects are exposed to various risks of varying degrees throughout all its phases and stages of development. Managing projects in a multiple-project environment involves planning and controlling project schedules and resources when the same …

    View paper: Managing Multiple Projects: the Story from Indonesia PDF: Managing Multiple Projects: the Story from Indonesia (811 KB)

  17. Accelerating the Development of Geothermal Energy in the Netherlands

    Leonora HEIJNEN, Melanie PROVOOST · World Geothermal Congress · 2020 ·Business Strategies

    … ideal starting point for the development of geothermal projects. Integration of the knowledge and experience gained from the hydrocarbon era is very useful and needed for safe and responsible growth of the geothermal industry. A Master Plan Geothermal …

    View paper: Accelerating the Development of Geothermal Energy in the Netherlands PDF: Accelerating the Development of Geothermal Energy in the Netherlands (930 KB)

  18. Current Status of Geothermal Development in Honduras

    Wilmer HENRIQUEZ · World Geothermal Congress · 2020 ·Country Updates

    … carried out which has identified the development of pilot projects for the use of geothermal resources of low and medium temperature for direct uses, focused on the sustainable development of communities and with an orientation to encourage the local …

    View paper: Current Status of Geothermal Development in Honduras PDF: Current Status of Geothermal Development in Honduras (1061 KB)

  19. Integration of HSE Principles on Project Design Stage: A Lesson Learn from PGE

    Irma KHOIRUNISSA, Marmelia Puja DEWI, Mufthi Gana SUKARDI · World Geothermal Congress · 2020 ·Environmental Aspects

    The project schedule is usually very tight in an effort to start up the facilities sooner. Due to these difficulties and the criticality of ensuring the proper implementation of the Health, Safety, and Environmental (HSE) requirements, an HSE Management …

    View paper: Integration of HSE Principles on Project Design Stage: A Lesson Learn from PGE PDF: Integration of HSE Principles on Project Design Stage: A Lesson Learn from PGE (380 KB)

  20. Geothermal Green Bond Certification: Challenges in Investment Screen Criteria Development Using Global Geothermal Carbon Dioxide Emissions Rates

    Anna M. WALL, Ben MATEK · Stanford Geothermal Workshop · 2016 ·General

    Geothermal project development is often hampered by the availability of funding, particularly at stages of exploration prior to confirmation drilling. However, the increasing investor appetite for sustainability-related financial instruments has introduced …

    View paper: Geothermal Green Bond Certification: Challenges in Investment Screen Criteria Development Using Global Geothermal Carbon Dioxide Emissions Rates PDF: Geothermal Green Bond Certification: Challenges in Investment Screen Criteria Development Using Global Geothermal Carbon Dioxide Emissions Rates (807 KB)

  21. Delivering Value to Geothermal Operators Through Innovative Engineering Design and Project Delivery

    J. Bydder, S. Henderson, A. Hochwimmer, E. Powell · New Zealand Geothermal Workshop · 2016 ·1.2

    … in over 20 countries. The diverse nature of these projects has fostered highly innovative thinking with “whole-of-life” consideration. This paper outlines a number of case studies showing beneficial outcomes achieved by identifying and quantifying …

    View paper: Delivering Value to Geothermal Operators Through Innovative Engineering Design and Project Delivery PDF: Delivering Value to Geothermal Operators Through Innovative Engineering Design and Project Delivery (194KB)

  22. Non-Technical Barriers of Geothermal Projects

    Benjamin RICHTER, Kai IMOLAUER, Maria UELTZEN · World Geothermal Congress · 2015 ·Legal and Regulatory Aspects

    … respect to their investment environment for geothermal projects. For the World Bank and the German Federal Ministry for Environment Rödl & Partner developed a benchmark system, that allows for the evaluation and analysis of the economic, legal, …

    View paper: Non-Technical Barriers of Geothermal Projects PDF: Non-Technical Barriers of Geothermal Projects (338 KB)

  23. Geothermal Energy Development in Latin America and the Caribbean and the Role of International Development Partners

    Marietta SANDER · World Geothermal Congress · 2015 ·Business Strategies

    … region aiming to assist in geothermal energy development. Project approaches differ depending whether they are conducted in the framework of technical or financial cooperation. Determining factors also include the funding source, multilateral, bilateral, …

    View paper: Geothermal Energy Development in Latin America and the Caribbean and the Role of International Development Partners PDF: Geothermal Energy Development in Latin America and the Caribbean and the Role of International Development Partners (1528 KB)

  24. Reducing Geothermal Resource Risk and Project Schedule Prior to Exploration Drilling

    Greg USSHER, Aaron HOCHWIMMER · World Geothermal Congress · 2015 ·Exploration

    The biggest project risks for a green-field geothermal development are almost always related to the limited knowledge of the geothermal resource in early stages of the development. Confirmation of the presence of a resource, assessing resource capacity and …

    View paper: Reducing Geothermal Resource Risk and Project Schedule Prior to Exploration Drilling PDF: Reducing Geothermal Resource Risk and Project Schedule Prior to Exploration Drilling (633 KB)

  25. When Smaller Is Better--Cost/Size/Risk Analysis of Geothermal Projects

    Eliasson, Larus; Smith, Christopher · Geothermal Resources Council Transactions · 2011 ·Financing; Business administration; Risk management; Economi

    When we consider the cost of projects, then we have two types of cost, technical and financial where each can be split into two subcategories giving four major cost components: 1. Technical cost, here predominately capital expenditure 2. Technical cost as …

    View paper: When Smaller Is Better--Cost/Size/Risk Analysis of Geothermal Projects Download unavailable

1 2 3 Next ›

Papers are freely accessible. Copyright remains with the authors and conference organisers as stated on each paper.

IGA Conference Paper Database · New search