Skip to content
International Geothermal Association Conference Paper Database Live

Searches title, authors, abstract, keywords and session. Use "quotes" for an exact phrase.

Advanced search

All filled fields must match. Conference and year are added to the filters on the left.

Filters

Show filters
Conference
Year
–

1–3 of 3 papers

  1. PRODUCTIVE AND ALLOCATIVE EFFICIENCY - ROTORUA GEOTHERMAL SYSTEM

    M. Zuquim, Q. Peng, P Doorman and J. Clearwater · New Zealand Geothermal Workshop · 2021 ·Session 1.2 - Social & Community

    … The current plan has strong imperatives to support efficiency in the use and allocation of the geothermal resource. The effectiveness of these policies, and their implementation, has been assessed as part of a review of the regional plan. This work …

    View paper: PRODUCTIVE AND ALLOCATIVE EFFICIENCY - ROTORUA GEOTHERMAL SYSTEM PDF: PRODUCTIVE AND ALLOCATIVE EFFICIENCY - ROTORUA GEOTHERMAL SYSTEM (351KB)

  2. Reducing Flat Time in Geothermal Drilling: Surface-Landed Threaded Wellhead Installation

    Anil Tokcan, Sami Atalay, Ernesto Rivas, William M. Rickard · World Geothermal Congress · 2026 ·Advances in Well Engineering and Pump Technology - Part 1

    Reducing non-productive time (NPT) is critical in geothermal drilling, where complex formations and high costs demand operational efficiency. We present a field-proven wellhead installation method that eliminates waiting on cement time by landing each casing …

    View paper: Reducing Flat Time in Geothermal Drilling: Surface-Landed Threaded Wellhead Installation PDF: Reducing Flat Time in Geothermal Drilling: Surface-Landed Threaded Wellhead Installation

  3. Planning for Efficient Drilling Operations (A Case Study of Drilling Well PW 03B)

    Esther Nyambura Njuguna · World Geothermal Congress · 2026 ·Advances in Drilling Technologies & Data - Part 2

    … equipment and human resource which translates into non-productive time and consequently high costs. Drilling in Paka started in the year 2018, and as of May, 2025, nineteen wells had been drilled. Among them is Paka Well 03B (PW 03B) drilled between …

    View paper: Planning for Efficient Drilling Operations (A Case Study of Drilling Well PW 03B) PDF: Planning for Efficient Drilling Operations (A Case Study of Drilling Well PW 03B)

Papers are freely accessible. Copyright remains with the authors and conference organisers as stated on each paper.

IGA Conference Paper Database · New search