Skip to content
International Geothermal Association Conference Paper Database Live

Searches title, authors, abstract, keywords and session. Use "quotes" for an exact phrase.

Advanced search

All filled fields must match. Conference and year are added to the filters on the left.

Filters

Show filters
Conference
Year
–

1–25 of 80 papers

  1. Six Month Production Test at Momotombo, Nicaragua: Preliminary Results

    Lopez, Carlos V.; Eckstein, Yoram · Geothermal Resources Council Transactions · 1980 ·Well testing; Flow testing; Production decline; Reservoir ma

    Results of a monitored six months production test carried out simultaneously on eight wells at the Momotombo geothermal field in Nicaragua indicate that its resource has a much smaller potential than previously believed. The resource potential is determined …

    View paper: Six Month Production Test at Momotombo, Nicaragua: Preliminary Results Download unavailable

  2. Deliverability Curve Analysis from Flow Production Test Data

    A.F. Fanani, M.A. Habiburrahman, G. Hastriansyah, F. Pasaribu · New Zealand Geothermal Workshop · 2022 ·Session 3.3 - PRODUCTION & MANAGEMENT 2

    The Flow Production Test is an alternative method to frequently update well deliverability curves with minimum disturbance to power plant generation. This method has been conducted in our fields such as Lahendong (Fanani, 2020), Ulubelu (Sugiharto, 2020), and …

    View paper: Deliverability Curve Analysis from Flow Production Test Data PDF: Deliverability Curve Analysis from Flow Production Test Data (761KB)

  3. Production Test Analysis Using Separator Method with Respect to Separator Efficiency

    Clinton SIHOMBING, Hendra Ardi KURNIAWAN, Achmad Djumarma WIRAKUSUMAH, Ahmad Fahmi FANANI, Ahmad YANI · Stanford Geothermal Workshop · 2018 ·Production Engineering

    Production test is one of very crucial activities in the geothermal field development process. The condition of the well, reservoir characteristics, and production capacity of the well can be determined by production test. The result of production test must …

    View paper: Production Test Analysis Using Separator Method with Respect to Separator Efficiency PDF: Production Test Analysis Using Separator Method with Respect to Separator Efficiency (1022 KB)

  4. Production Test Analysis of XYZ-Well at Dieng Geothermal Field Using Horizontal Discharge Lip Pressure Method with Russell James Equation and Hiriart Equation

    Aris Tristianto WIBOWO, Muhammad THASRIL, Puji SIRAIT · World Geothermal Congress · 2015 ·Production Engineering, Steam Gathering Systems

    Production test is one of very crucial activities in the geothermal field development process because the condition of the well, reservoir characteristics, and production capacity of the well can be determined by the test. Production test data should be …

    View paper: Production Test Analysis of XYZ-Well at Dieng Geothermal Field Using Horizontal Discharge Lip Pressure Method with Russell James Equation and Hiriart Equation PDF: Production Test Analysis of XYZ-Well at Dieng Geothermal Field Using Horizontal Discharge Lip Pressure Method with Russell James Equation and Hiriart Equation (1261 KB)

  5. The Use of Inflow Performance Relationships to Identify Reservoir Response During Production Tests in a Geothermal Well

    AragÛn, A., Su·rez, M.C., Moya, S., Izquierdo, G. · Stanford Geothermal Workshop · 2007 ·Production Engineering

    … (pwf). Application of this methodology to four cases of production test in wells was carried out, founding that the intervals of pD values where the stabilized flow is identified is a function of the magnitude of the well flow capacity.

    View paper: The Use of Inflow Performance Relationships to Identify Reservoir Response During Production Tests in a Geothermal Well PDF: The Use of Inflow Performance Relationships to Identify Reservoir Response During Production Tests in a Geothermal Well (118KB)

  6. Initial Production Testing at the Coso Hot Springs KGRA

    Petty, Susan; Adams, Richard H. · Geothermal Resources Council Transactions · 1984 ·Well testing; Flow testing; Drawdown testing; Temperature gr

    … productivity tests have been conducted on all five of the production wells. Long term tests of wells 75-7, 75b-7, 71-7 and 81a-7 have been completed. Productivities for the three wells tested so far indicated the potential for production of at least 9.6 MWe …

    View paper: Initial Production Testing at the Coso Hot Springs KGRA Download unavailable

  7. A Study of Non-Condensable Gas (NCG) Release Controlling at Initial Production Testing through GEO-RISE (Geothermal Gas Reinjection System for Emission Elimination)

    Dika Iqbal Lidyanto · World Geothermal Congress · 2026 ·Poster

    The LHD-X well is a production well located in Cluster ABC, Geothermal Area Lahendong, North Sulawesi, Indonesia. Previously in 2023, a workover activity was carried out on the well. Before the well was opened to supplying steam to the existing unit, a series …

    View paper: A Study of Non-Condensable Gas (NCG) Release Controlling at Initial Production Testing through GEO-RISE (Geothermal Gas Reinjection System for Emission Elimination) PDF: A Study of Non-Condensable Gas (NCG) Release Controlling at Initial Production Testing through GEO-RISE (Geothermal Gas Reinjection System for Emission Elimination) (1089KB)

  8. Steam and Water Relative Permeabilities Calculation Using Production Test Data and Tortuous Channel Model Modified Equations

    Hermas DAVILA · Stanford Geothermal Workshop · 2024 ·Reservoir Engineering

    … reservoir have been attempted to calculate using available production test data. Flowing saturation value (S_wf) it yields by means the reservoir steam fraction obtained from flowing enthalpy production test and bottomhole temperature recorded; both values …

    View paper: Steam and Water Relative Permeabilities Calculation Using Production Test Data and Tortuous Channel Model Modified Equations PDF: Steam and Water Relative Permeabilities Calculation Using Production Test Data and Tortuous Channel Model Modified Equations (1204 KB)

  9. Kawah Kamojang pilotiInjection test: Production monitoring evaluation and numerical reservoir modelling study to support Kamojang injection optimization program

    F.H. Abdurachman, S. Hendriana, B.L. Riandari, P. Hastuti, F. Pasaribu · New Zealand Geothermal Workshop · 2023 ·Session 8.2 - RESERVOIR MODELLING 3

    … at full capacity at 235 MW from about 515 kg/s of steam production and giving an excess of 95 kg/s condensate to reinject. Condensate injection in the Kamojang field began in 1978, corresponding with the initiation of commercial production and to date the …

    View paper: Kawah Kamojang pilotiInjection test: Production monitoring evaluation and numerical reservoir modelling study to support Kamojang injection optimization program PDF: Kawah Kamojang pilotiInjection test: Production monitoring evaluation and numerical reservoir modelling study to support Kamojang injection optimization program (1330KB)

  10. Application of the Flow Production Test to Update Well Production Capacity in Lahendong Geothermal Field

    Ahmad Fahmi FANANI, Teguh PRABOWO, Gamal HASTRIANSYAH, Fernando PASARIBU, Marihot SILABAN · World Geothermal Congress · 2020 ·Reservoir Engineering

    … is a two phase geothermal system where the dryness of each production well cluster varies between 10% up to 100%. In determining the decline for two-phase wells, subsurface data acquisition is needed and routine production wells are re-tested. However, …

    View paper: Application of the Flow Production Test to Update Well Production Capacity in Lahendong Geothermal Field PDF: Application of the Flow Production Test to Update Well Production Capacity in Lahendong Geothermal Field (736 KB)

  11. Inferring Production Performance from Early Injectivity Tests

    Marc PERREAUX, Patrick EGERMANN, Martial SAQUER · World Geothermal Congress · 2020 ·Reservoir Engineering

    … wellbore warm-up is necessary to be able to start the well production. Considering the significant cost of rig time, accelerating the decision process leads to an optimization of the rig usage and thus, can lead to significant savings in drilling costs, …

    View paper: Inferring Production Performance from Early Injectivity Tests PDF: Inferring Production Performance from Early Injectivity Tests (1712 KB)

  12. Results of Well Production Test for Olkaria Domes Field, Olkaria Kenya

    Eric Rop · ARGeo · 2012 ·Direct Use

    … to supply steam for the 140 MWeOlkaria IV power plant. Production tests (discharge tests) were performed to obtain the discharge character of a well and to estimate its production capacity. The wells were discharge tested using the lip pressure method. …

    View paper: Results of Well Production Test for Olkaria Domes Field, Olkaria Kenya PDF: Results of Well Production Test for Olkaria Domes Field, Olkaria Kenya (701KB)

  13. Exposure Tests of Turbine Materials in Geothermal Steam from a Deep Production Well

    Hideo Kato, Koji Furuya and Mitsuo Yamashita · World Geothermal Congress · 2000 ·Power Generation

    … the period of one year, using geothermal steam from a deep production well in Japan. One of the purposes of the tests was to examine the effect of the coating to prevent scaling. Six kinds of coating materials to be applied to the blade material were …

    View paper: Exposure Tests of Turbine Materials in Geothermal Steam from a Deep Production Well PDF: Exposure Tests of Turbine Materials in Geothermal Steam from a Deep Production Well (3 KB)

  14. Building resilience: Designing well testing equipment and procedures for powerful wells

    C. Horan, P. vonHirtz · New Zealand Geothermal Workshop · 2024 ·Session 1.3 - DRILLING & WELL TESTING 1

    Testing geothermal production wells is a key step in the life cycle of a well asset. The owner of the well aims to quantify the value of the asset in terms of; MWe capacity, interaction with nearby wells and geochemistry during the well test. Geothermal wells …

    View paper: Building resilience: Designing well testing equipment and procedures for powerful wells PDF: Building resilience: Designing well testing equipment and procedures for powerful wells (1343KB)

  15. Performance Testing the Phase II HDR Reservoir

    Ponden, Raymond F.; Dreesen, Donald S.; Thomson, Jim C. · Geothermal Resources Council Transactions · 1991 ·HDR/EGS; Well testing; Power plant design and operation; Cir

    … in an efficient manner to support commercial power production. This year, the Laboratory will begin a circulation test of its Phase II reservoir. The objectives of this test are to characterize steady state power production and long term reservoir …

    View paper: Performance Testing the Phase II HDR Reservoir Download unavailable

  16. An Integrated Test Program for the Definition of a High Temperature Geothermal Reservoir: A Case Study from the Zunil Geothermal Field, Guatemala

    Menzies, A. J.; Granados, E. E.; Sanyal, S. K.; Mink, L. L.; Merida-I., L.; Caicedo-A., A. · Geothermal Resources Council Transactions · 1990 ·Well testing; Flow testing; Interference testing

    … and 5 can maintain their present power capacity, the four production wells (ZCQ 3 to -6) would be capable of supplying the required steam flow rate for the proposed 15 MW power plant. Measured flow rate decline from the 1989 long term test and previous long …

    View paper: An Integrated Test Program for the Definition of a High Temperature Geothermal Reservoir: A Case Study from the Zunil Geothermal Field, Guatemala Download unavailable

  17. Water and Gas Chemistry from HGP-A Geothermal Well: January 1980 Flow Test

    Thomas, Donald M. · Geothermal Resources Council Transactions · 1980 ·Brine chemistry; Isotopes; Well testing

    During January 1980, a two week production test was conducted on the geothermal well HGP-A. Brine chemistry indicates that approximately six percent of the well fluids are presently derived from seawater and that this fraction will probably increase during …

    View paper: Water and Gas Chemistry from HGP-A Geothermal Well: January 1980 Flow Test Download unavailable

  18. Hydraulic and Thermal Behavior of a Hot Dry Rock Reservoir during a 30-Day Circulation Test

    Kelkar, Sharad; Dash, Zora; Malzahn, Mark; Hendron, Robert · Geothermal Resources Council Transactions · 1987 ·HDR/EGS; Injection; Well testing; Circulation testing

    … range in depth from 365 to 450 m. During the injection test, the falloff and the maximum injectivity test were repeated to examine the decrease of injectivity. Using fluorescent dye, the tracer test was also conducted to determine the connectivity …

    View paper: Hydraulic and Thermal Behavior of a Hot Dry Rock Reservoir during a 30-Day Circulation Test Download unavailable

  19. Pressure Transient Tests at the Okuaizu Geothermal Field in Japan

    Ishido, Tsuneo · Geothermal Resources Council Transactions · 1985 ·Well testing; Pressure transient analysis; Injection testing

    Injection, falloff and buildup tests were conducted on well OA-4 drilled in the Okauizu geothermal field in Japan. The pressure transient data were interpreted using conventional type curve and graphical analysis. The early time data of each test is closely …

    View paper: Pressure Transient Tests at the Okuaizu Geothermal Field in Japan Download unavailable

  20. Analysis of Reservoir Conditions During Production Startup at the Los Azufres Geothermal Field

    Kruger, P.; Semprini, L.; Nieva, D.; Verma, S.; Barragan, R.; Molinar, R.; Aragon, A.; Ortiz, J.; Miranda, C.; Garfias, A.; Gallardo, M. · Geothermal Resources Council Transactions · 1985 ·Reservoir modeling; Geothermometers; Well testing; Flow test

    Since startup of production at the Los Azufres geothermal field in Michoacan, Mexico, in mid-1982, a large amount of production and chemical data has been accumulated. An evaluation of these data was undertaken with two objectives; first, to characterize the …

    View paper: Analysis of Reservoir Conditions During Production Startup at the Los Azufres Geothermal Field Download unavailable

  21. An Update on the Role of Step-Rate Injectivity Testing in Liquid Dominated, Highly Fractured Geothermal Reservoirs

    Rosser, James R.; Payne, Mark A.; Allen, Terry S. · Geothermal Resources Council Transactions · 1984 ·Reservoir engineering; Injection; Well testing; Injection te

    SPE Paper No.9275, "The Role of Step Rate Injectiviity Testing in Liquid Dominated Highly Fractured Geothermal Reservoir," was presented at the 55th Annual Fall Technical Conference of the Society of Petroleum Engineers of AIME in September 1980. The paper …

    View paper: An Update on the Role of Step-Rate Injectivity Testing in Liquid Dominated, Highly Fractured Geothermal Reservoirs Download unavailable

  22. Uses of Geochemistry with Injection-Backflow Testing in Geothermal Reservoir Studies

    Wright, Phillip M.; Capuano, Regina M.; Adams, Michael C.; Moore, Joseph N. · Geothermal Resources Council Transactions · 1984 ·Exploration; Geochemical surveys; Tracer testing; Injection;

    Injection back flow testing provides a new technique for obtaining information on a number of reservoir properties that are not obtainable form conventional analysis of only pressure, temperature and flow rate data. Our field experiments have demonstrated …

    View paper: Uses of Geochemistry with Injection-Backflow Testing in Geothermal Reservoir Studies Download unavailable

  23. 1981 Interference Well Testing: Beowawe, NV

    Epperson, I. J. · Geothermal Resources Council Transactions · 1983 ·Well testing; Interference testing; Hydrogeology

    In 1981, interference tests were conducted between six wells in Beowawe Geothermal Fields, Nevada. The results of the interference tests agree with the results of individual well flow tests and indicate pressure communication between all tested wells, even …

    View paper: 1981 Interference Well Testing: Beowawe, NV Download unavailable

  24. Assessment and Optimization for Flowing Readiness of Newly Drilled Production Wells in Mak-Ban Geothermal Field, Philippines

    Dave RAMOS · Stanford Geothermal Workshop · 2024 ·Reservoir Engineering

    In the Mak-Ban Geothermal Field, Philippines, nine (9) new production wells were drilled as part of the 2021 – 2022 Mak-Ban Steam Production Enhancement Campaign (MB SPEC). A deep casing strategy was implemented during well planning and drilling to prevent …

    View paper: Assessment and Optimization for Flowing Readiness of Newly Drilled Production Wells in Mak-Ban Geothermal Field, Philippines PDF: Assessment and Optimization for Flowing Readiness of Newly Drilled Production Wells in Mak-Ban Geothermal Field, Philippines (1323 KB)

  25. Modified Isochronal Testing in Patuha Geothermal Project Indonesia

    Dito Budi SUKARNO, Siti Olivinia YUSRA, Rudy MARTIKNO, Yuris RAMADHAN, Randy Wijaya ATMAJA, Nurlianto SADJI, Asum SUMARNA, Ramonchito Cedric M. MALATE · Stanford Geothermal Workshop · 2024 ·Reservoir Engineering

    Modified Isochronal Testing (MIT) was employed in the two production wells 2-X and 4-X in Patuha-2 Geothermal Project, West Java, Indonesia, to test its applicability as an alternative option of determining the Bore Output Curve (BOC) or well deliverability …

    View paper: Modified Isochronal Testing in Patuha Geothermal Project Indonesia PDF: Modified Isochronal Testing in Patuha Geothermal Project Indonesia (1373 KB)

1 2 3 4 Next ›

Papers are freely accessible. Copyright remains with the authors and conference organisers as stated on each paper.

IGA Conference Paper Database · New search