1–25 of 42 papers

  1. Resource Capacity Estimation Using Lognormal Distributions of Power Density Derived from Producing Fields and Area Derived from Resource Conceptual Models; Advantages, Pitfalls and Remedies

    William CUMMING · Stanford Geothermal Workshop · 2016 ·General

    The power density method for estimating potential power generation capacity of geothermal exploration prospects is recommended because it is relatively simple, case histories have been graphically compiled to support parameter estimates, and its pitfalls are …

    View paper: Resource Capacity Estimation Using Lognormal Distributions of Power Density Derived from Producing Fields and Area Derived from Resource Conceptual Models; Advantages, Pitfalls and Remedies PDF: Resource Capacity Estimation Using Lognormal Distributions of Power Density Derived from Producing Fields and Area Derived from Resource Conceptual Models; Advantages, Pitfalls and Remedies (673 KB)

  2. Expansion of Power Capacity at The Geysers Steam Field, California - Case History of the Western Geopower Unit 1 Project

    S. K. Sanyal, R. C. Henneberger, E. E. Granados, M. Long, K. MacLeod · World Geothermal Congress · 2010 ·6. Case Histories

    … of the first significant expansion of the installed power capacity in two decades at The Geysers steam field (California), which has been producing commercial electric power for nearly 50 years. Western GeoPower Corporation is constructing a 35 MW …

    View paper: Expansion of Power Capacity at The Geysers Steam Field, California - Case History of the Western Geopower Unit 1 Project PDF: Expansion of Power Capacity at The Geysers Steam Field, California - Case History of the Western Geopower Unit 1 Project (3941KB)

  3. Geothermal Power Capacity of Wells in Non-Convective Sedimentary Formations

    Subir K. Sanyal and Steven J. Butler · World Geothermal Congress · 2010 ·37. Advanced Technology (Magma, Geopressure, etc.)

    … and well logs. Using these estimates, the well’s power capacity can be estimated for various well production options (such as, pumped or self-flowing) and power generation technology options (such as, binary, flash or hybrid). The sedimentary …

    View paper: Geothermal Power Capacity of Wells in Non-Convective Sedimentary Formations PDF: Geothermal Power Capacity of Wells in Non-Convective Sedimentary Formations (2910KB)

  4. Sustainability and Renewability of Geothermal Power Capacity

    Sanyal, Subir K. · Geothermal Resources Council Transactions · 2004 ·Reservoir Engineering

    View paper: Sustainability and Renewability of Geothermal Power Capacity Download unavailable

  5. The Coso Geothermal Power Projects

    Schoonmaker, James L. · Geothermal Resources Council Transactions · 1989 ·Power plant design and operation; NCG; Operations management

    The California Energy Company, Inc. (CECI) and Mission Power Engineering Co. (MPE) formed a team in 1987 to develop Units 2 through 9 of the COSO Project. Each of these units are 30 MW nominal, dual flash design. They are located on four sites in the COSO …

    View paper: The Coso Geothermal Power Projects Download unavailable

  6. Design and Construction of the West Ford Flat Power Plant at The Geysers

    Urbank, Karl F. · Geothermal Resources Council Transactions · 1989 ·Power plant design and operation; Permitting; Operations man

    The West Ford Flat 27 megawatt power plant is one of two Geysers plants constructed by Geysers Geothermal Company during 1987 and 1988. The project began in May 1987 with the acquisition of a PG&E Power Purchase Agreement from SAI Geothermal. Construction …

    View paper: Design and Construction of the West Ford Flat Power Plant at The Geysers Download unavailable

  7. Geothermal Representation in Power System Models

    Warren, Ian; Porse, Sean; Winick, Jeff · Geothermal Resources Council Transactions · 2021 ·Energy markets; Power plant design and operation; Economic a

    View paper: Geothermal Representation in Power System Models Download unavailable

  8. Power Density in Geothermal Fields, 2020 Update

    Maxwell WILMARTH, James STIMAC, Gugi GANEFIANTO · World Geothermal Congress · 2020 ·Resource Assessment

    We estimated and updated the power densities of 103 geothermal fields around the world. Power density follows a log-normal probability distribution. The mean power density of the population is 12.4 MW/km2 and the median is 10.1 MW/km2. Power density is a …

    View paper: Power Density in Geothermal Fields, 2020 Update PDF: Power Density in Geothermal Fields, 2020 Update (1346 KB)

  9. Thermal Fluid Characteristics of Geothermal Prospects in the North Central Vietnam and Their Potential for Power Generation

    Tran Trong Thang, Nguyen Thac Cuong and Pham Xuan Anh · Asian Geothermal Symposium · 2016

    … electric generating capacity. However, to calculate the power generation capacity, the parameters such as: the area of the reservoir, the thickness of the reservoir and some others are estimated or referenced from the published literatures. According to …

    View paper: Thermal Fluid Characteristics of Geothermal Prospects in the North Central Vietnam and Their Potential for Power Generation PDF: Thermal Fluid Characteristics of Geothermal Prospects in the North Central Vietnam and Their Potential for Power Generation (806KB)

  10. Geothermal Plant Capacity Factors

    Greg MINES, Christopher RICHARD, Jay NATHWANI, Hillary HANSON, Rachel WOOD · Stanford Geothermal Workshop · 2015 ·General

    … stakeholders to express the ability of a plant to produce power, it is a term that is frequently misunderstood and in some instances incorrectly used. In this paper we discuss how this capacity factor is defined and utilized by the EIA, including discussion …

    View paper: Geothermal Plant Capacity Factors PDF: Geothermal Plant Capacity Factors (890 KB)

  11. Interpretations of U.S. Geothermal Industry Data Analysis of Capacity, Net Production, and Efficiency Trends: 2002-2011

    Richard, Christopher · Geothermal Resources Council Transactions · 2013 ·Energy markets; Economics

    … defined as capacity factor. The conversion of power to energy requires time, but also must consider specific system efficiencies relative to each technology. This study has explored the state of the U.S. geothermal market based on data available …

    View paper: Interpretations of U.S. Geothermal Industry Data Analysis of Capacity, Net Production, and Efficiency Trends: 2002-2011 Download unavailable

  12. Geothermal Power Generation in China: Past and Future

    Keyan Zheng · Geothermal Resources Council Transactions · 2012 ·Geothermal overviews

    Geothermal power generation has the highest capacity factor among renewable energy power generations. Considering investment cost, geothermal has highest investment benefit. China started geothermal power generation in 1970. It was the seventh country …

    View paper: Geothermal Power Generation in China: Past and Future Download unavailable

  13. Electric Power Potential Estimates of High-Temperature Geothermal Fields in Indonesia and the Philippines (a Historic Review)

    M P Hochstein, M Crosetti · New Zealand Geothermal Workshop · 2011 ·Production and Management

    Electric power potential estimates (Pe) have been used for the initial development phase of 7 geothermal fields in Indonesia and 8 fields in the Philippines during 1975 to 2000. Most of the estimates were based on stored (anomalous) heat assessments together …

    View paper: Electric Power Potential Estimates of High-Temperature Geothermal Fields in Indonesia and the Philippines (a Historic Review) PDF: Electric Power Potential Estimates of High-Temperature Geothermal Fields in Indonesia and the Philippines (a Historic Review) (1 MB)

  14. Construction and Operation of Kamojang Unit-4, the First Commercial Geothermal Power Plant Built, Owned and Operated by PT Pertamina Geothermal Energy

    Mawardi Agani, Khairul Rozaq, Zainal I. Bachrun · World Geothermal Congress · 2010 ·6. Case Histories

    … in supplying steam to the first commercial geothermal power plant (30 MW.) namely Kamojang Unit 1 in 1983. It was followed by Unit 2 and Unit 3, 55 MW capacities each, commissioned in 1987. These 140 MW total capacity power plants are owned and operated …

    View paper: Construction and Operation of Kamojang Unit-4, the First Commercial Geothermal Power Plant Built, Owned and Operated by PT Pertamina Geothermal Energy PDF: Construction and Operation of Kamojang Unit-4, the First Commercial Geothermal Power Plant Built, Owned and Operated by PT Pertamina Geothermal Energy (3594KB)

  15. Geothermal Power from Wells in Non-Convective Sedimentary Formations--An Engineering Economic Analysis

    Sanyal, Subir K.; Butler, Steven J. · Geothermal Resources Council Transactions · 2009 ·Sedimentary formations; Feasibility studies

    … cores and well logs. Using these estimates, the well’s power capacity can be estimated for various well production options (such as, pumped or self-flowing) and power generation technology options (such as, binary, flash or hybrid). The sedimentary …

    View paper: Geothermal Power from Wells in Non-Convective Sedimentary Formations--An Engineering Economic Analysis Download unavailable

  16. Design and Implementation of Steam Supply for the Western Geopower Unit 1 Project at the Geyers Geothermal Field, California

    Sanyal, S. K.; Henneberger, R. C.; Granados, E. E.; Long, M.; MacLeod, K. · Geothermal Resources Council Transactions · 2009 ·Reservoir management; Drilling; Production decline

    … of the first significant expansion of the installed power capacity in two decades at The Geysers steam field (California), which has been producing commercial electric power for nearly 50 years. Western GeoPower Corporation is constructing a 35 MW …

    View paper: Design and Implementation of Steam Supply for the Western Geopower Unit 1 Project at the Geyers Geothermal Field, California Download unavailable

  17. Opening New Frontiers for Geothermal Generation in Colombia, Peru and Ecuador: Resource, Regulation & Capacity Building

    A. Prieto, B. van Campen, P. Carvajal, D. Moya Pinta, A. Akamine · New Zealand Geothermal Workshop · 2016 ·6.4

    … assessed the geothermal potential, regulation and human capacity in 5 Andean countries with the objective of supporting their geothermal development. Much of this information remains unpublished. Other country studies were done in the context of the …

    View paper: Opening New Frontiers for Geothermal Generation in Colombia, Peru and Ecuador: Resource, Regulation & Capacity Building PDF: Opening New Frontiers for Geothermal Generation in Colombia, Peru and Ecuador: Resource, Regulation & Capacity Building (270KB)

  18. Power Density in Geothermal Fields

    Maxwell WILMARTH and James STIMAC · World Geothermal Congress · 2015 ·Resource Assessment

    We estimated the power densities of 66 geothermal fields above 10 MWnet with more than 5 years of production history. Power density follows a log-normal probability distribution. The mean power density of the population is 15.4 MW/km2, the median is 12.0 …

    View paper: Power Density in Geothermal Fields PDF: Power Density in Geothermal Fields (765 KB)

  19. Methods and Recommendations for Investment Substantiation of Geothermal Power Plant Developments

    Emil I. Boguslavsky, Alexey I. Mikheyev · World Geothermal Congress · 2010 ·4. Economics and Financing

    … can be explained by Russia’s lack of domestic conventional power resources, the high cost of transporting them from other regions, certain advantages of geothermal sources, the scientific basis of their development, word-wide industrial experience, and the …

    View paper: Methods and Recommendations for Investment Substantiation of Geothermal Power Plant Developments PDF: Methods and Recommendations for Investment Substantiation of Geothermal Power Plant Developments (147KB)

  20. Assessing the Rye Patch Geothermal Field, a Classic Basin-and-Range Resource

    Sanyal, S. K.; McNitt, J. R.; Butler, S. J.; Klein, C. W.; Ellis, R. E. · Geothermal Resources Council Transactions · 2006 ·Reserve Assessment; Power Capacity

    … project life. Based on well test data, the maximum gross power production capacity from the existing wells is estimated at 21 MW. The existing wells are capable of supplying the 12.5 MW plant installed at the site if one or two additional wells are drilled …

    View paper: Assessing the Rye Patch Geothermal Field, a Classic Basin-and-Range Resource Download unavailable

  21. Geothermal Electric Power Production in the United States: A Survey and Update for 1995-1999

    Sifford, Alex; Bloomquist, R. Gordon · Geothermal Resources Council Transactions · 2000 ·Geothermal overviews

    View paper: Geothermal Electric Power Production in the United States: A Survey and Update for 1995-1999 Download unavailable

  22. Geothermal Well Productivity: Why Hotter is Not Always Better

    Sanyal, Subir K.; Morrow, James W.; Butler, Steven J. · Geothermal Resources Council Transactions · 2007 ·Feasibility studies; Power plant design and operation; Well

    This paper investigates the practical range of net power capacity available from conventional and Enhanced Geothermal System (“EGS”) wells as a function of temperature. For a geothermal resource temperature up to about 190°C, which is the operating …

    View paper: Geothermal Well Productivity: Why Hotter is Not Always Better Download unavailable

  23. Broadlands Optimisation

    Grant, Malcolm A. · Geothermal Resources Council Transactions · 1979 ·Power plant design and operation; Two phase flow; Flash stea

    … of Broadlands geothermal field was used to study possible power station configurations. For two stage flash, a broad optimum was found in the inlet pressure on the turbine, from 6 to 10 bar with a value at the low end of range, 6.2 bar being recommended. A …

    View paper: Broadlands Optimisation Download unavailable

  24. Country Update: Mexico

    Luis C.A. Gutiérrez-Negrín · World Geothermal Congress · 2026 ·Country Updates

    The current installed geothermal power capacity in the country as of December 2025 is 976.1 MWe, and the running or operative capacity is 953.3 MW, with 34 power units installed in five geothermal fields in operation: Cerro Prieto, Los Azufres, Los Humeros, …

    View paper: Country Update: Mexico PDF: Country Update: Mexico (580KB)

  25. Regional and International Cooperation: A Strategy to Overcoming Longstanding Challenges in Geothermal Development in the Caribbean

    Judith Ephraim, Charlin Bodley, Johann Thor Magnusson, Jonathan Kelly, Gary Jackson · World Geothermal Congress · 2023 ·Risk Mitigation

    … need to be successfully addressed. Most of the proposed power plants have a nameplate capacity of less than 20 MW, which poses economic challenges and challenges to attract reputable developers and investors. This paper identifies the techno-economic …

    View paper: Regional and International Cooperation: A Strategy to Overcoming Longstanding Challenges in Geothermal Development in the Caribbean PDF: Regional and International Cooperation: A Strategy to Overcoming Longstanding Challenges in Geothermal Development in the Caribbean (2,4 MB)

1 2 Next ›