Geothermal power plants in Iceland constitute about 30% of the electricity production with installed capacity of about 780 MW, utilizing high enthalpy geothermal fields. The plants are typically operated as baseload while hydro plants provide the necessary …
View paper: Potential of High Enthalpy Geothermal Power Plants to Operate at Variable Load
PDF: Potential of High Enthalpy Geothermal Power Plants to Operate at Variable Load
-
George Ngomi
·
World Geothermal Congress
·
2026
·Power Plant Operations & Maintenance
… owns and operates five conventional geothermal power plants and twenty-one wellhead units. The oldest operational geothermal plant is the Olkaria II Power Station, which has an installed capacity of 105 MW from three generating units, each rated at 35 …
View paper: Applying Waterfall-Agile Hybrid Methodology for Optimized Maintenance Activities in Geothermal Power Plants: A Case Study of Olkaria II Power Station, Kenya
PDF: Applying Waterfall-Agile Hybrid Methodology for Optimized Maintenance Activities in Geothermal Power Plants: A Case Study of Olkaria II Power Station, Kenya
-
Azam Thatte, Doug Simpkins, Mauricio Rivas, Lev Ring, Cindy Taff
·
World Geothermal Congress
·
2026
·Advances in Power Plants - Part 2
… efficiency and net power output from the geothermal power plant. To remedy this issue, this paper presents a novel pressure recovery system using Rotary Pressure Exchanger (RPX) to recover up to 95% of the pressure energy from PGS well and utilize it to …
View paper: Novel Pressure Recovery System for Increasing Efficiency of Geothermal Power Plants
PDF: Novel Pressure Recovery System for Increasing Efficiency of Geothermal Power Plants
-
Nathaniel Njeru Mugo
·
World Geothermal Congress
·
2026
·Advances in Power Plants - Part 2
Wellhead power plants offer a flexible and rapid deployment model for geothermal energy, particularly in high-temperature fields undergoing phased development. While their operational potential is increasingly recognized, targeted operator training tools …
View paper: Development of a Simplified Operator Training Simulator for Geothermal Wellhead Power Plants Using MATLAB and Simulink
PDF: Development of a Simplified Operator Training Simulator for Geothermal Wellhead Power Plants Using MATLAB and Simulink
-
Giorgia Ruffato, Davide Elia Lattuada
·
World Geothermal Congress
·
2026
·Advances in Power Plants - Part 2
Geothermal plants using Organic Rankine Cycle (ORC) technology face high volumetric flow rates combined with medium enthalpy drops. While increasing the size of heat exchangers and piping can easily accommodate higher flow rates on the heat exchange side, the …
View paper: The Gemini Turbine: A Boost for Power Generation in Large-Scale ORC Geothermal Plants
PDF: The Gemini Turbine: A Boost for Power Generation in Large-Scale ORC Geothermal Plants
-
Li, Tailu; Wang, Qiulin; Zhu, Jialing; Fu, Wencheng
·
Geothermal Resources Council Transactions
·
2014
·Power plant design and operation; Binary cycle power generat
With respect to an actual geo-plant in China, the authors have identified four critical measures. They are, removing the plate heat exchangers (PHEs), installing an internal heat exchanger (IHE), adding a preheater, and replacing the working fluid, are …
View paper: System Improvement and Thermodynamic Optimization of an Organic Rankine Cycle Based Geo-plant in an Oilfield in China
Download unavailable
-
Sacerdoti, Ariel
·
Geothermal Resources Council Transactions
·
2013
·Power plant design and operation; Binary cycle power generat
… of electricity from 1985 to 2003. The original power plant consisted of Ormat Energy Converters (OEC), a topping turbine and a condensing steam turbine totaling just over 10 MW. Enel Green Power acquired the project rights in 2007. The resource …
View paper: Repowering of the Cove Fort Power Plant
Download unavailable
-
Tanoguchi, Toshiyasu; Saito, Shojiro; Iwai, Koji
·
Geothermal Resources Council Transactions
·
2013
·Power plant design and operation; Equipment design; Turbines
… of turbine and condenser is discussed for geothermal power plant where locates at high altitude or low altitude, comparing plant arrangement and process flow diagram in several combinations. In this paper, steam turbine and condenser applied to flash cycle …
View paper: Optimum Selection of Steam Turbine and Condenser for Geothermal Power Plant
Download unavailable
-
Mendive, David L.; Green, Lawrence H.
·
Geothermal Resources Council Transactions
·
2012
·Power plant design and operation
… Company (KenGen) for a modular 2.4 MW geothermal wellhead plant for a project located at Eburru, Kenya. The plant was constructed by Civicon Limited under a separate contract with KenGen. Commissioning took place in January 2012, and plant output exceeded …
View paper: Wellhead Geothermal Power Plant at Eburru, Kenya
Download unavailable
-
Kitz, Kevin; Elliott, Ryan; Spanswick, Ian
·
Geothermal Resources Council Transactions
·
2012
·Equipment design; Power plant cooling; Condensers; Economics
… was implemented at the Neal Hot Springs geothermal power plant in Vale, Oregon. Large cooling tower fans were used in an induced draft arrangement (fans above the heat exchanger). The total number of fans was reduced from 270 x 12ft / 3.7m fans to 30 x …
View paper: Economic and Performance Benefits Resulting from the Use of Large Diameter Fans on Air Cooled Heat Exchangers (A Case Study in the Use of Large Fan Air Cooled Condensers at the Neal Hot Springs Geothermal Power Plant, Oregon)
Download unavailable
-
Hallgrimsdottir, Elin; Ballzus, Claus; Hrolfsson, Ingolfur
·
Geothermal Resources Council Transactions
·
2012
·Power plant design and operation
The concept of Hellisheiði power plant was to co-generate electricity for power intensive industry and hot water for district heating. The power plant consists of six 45 MWe high pressure and one 33 MWe low pressure turbine generator units and 133 MWt thermal …
View paper: The Geothermal Power Plant at Hellisheidi, Iceland
Download unavailable
-
Reshef, Ran; Fever, Tomas
·
Geothermal Resources Council Transactions
·
2012
·Operations management; Power plant design and operation; Rem
… operates geothermal and recovered energy generation power plants in 22 countries. The engineering and customer support teams require process and equipment data in order to respond quickly to events of upsets, malfunction and failures. Not long ago, …
View paper: Ormat Plants: From Remote Monitoring to Remote Operation
Download unavailable
-
Moya, Paul; DiPippo, Ronald
·
Geothermal Resources Council Transactions
·
2012
·Drilling; Power plant design and operation
… presented. The design of the unique 2-unit binary power plant is discussed in detail. Plant performance is assessed based on the design specifications and on actual operations, from both a cycle and an overall plant perspective. Thermal and utilization …
View paper: Las Pailas 35 MW (Net) Binary Power Plant, Rincon de la Vieja, Guanacaste, Costa Rica
Download unavailable
-
Kutschera, Ulf A.; Phair, Kenneth A.; Avery, John R.
·
Geothermal Resources Council Transactions
·
2011
·Power plant design and operation; Operations management
The Aidlin Power Plant was constructed in the late 1980s. After over twenty years of continuous operation, the pressure, temperature, and flow of geothermal steam has changed substantially. Calpine Corporation is the owner and operator of the Aidlin Power …
View paper: Development of a Computer Model of the Aidlin Geothermal Power Plant for Performance Monitoring, Performance Prediction, and Performance Improvement
Download unavailable
-
Jalilinasrabady, Saeid; Itoi, Ryuichi; Gotoh, Hiroki; Yamashiro, Rie
·
Geothermal Resources Council Transactions
·
2011
·Power plant design and operation; Binary cycle power generat
The single flash Takigami Geothermal Power Plant is located in the southwestern part of Oita prefecture, Kyushu Island, Japan, with installed capacity of 27.5 MW. Energy and exergy of waste brine from a single flash system were calculated as 45.71% and 37.64% …
View paper: Exergetic Optimization of Proposed Takigami Binary Geothermal Power Plant, Oita, Japan
Download unavailable
-
Louw, Roubaix; Wallace, Kevin; Harvey, William
·
Geothermal Resources Council Transactions
·
2011
·Power plant design and operation; Condensers; Flash steam po
Flash steam power plants commonly use evaporative cooling with wet cooling towers, with cooling tower makeup provided by the condensed steam. These units are often preferred over binary units for high temperature resources for thermodynamic and economic …
View paper: Air Cooling Options for Flash Plants
Download unavailable
-
Wendt, Daniel; Mines, Greg
·
Geothermal Resources Council Transactions
·
2011
·Power plant design and operation; Binary cycle power generat
Air-cooled binary plants are designed to provide a specified level of power production at a particular air temperature. Nominally this air temperature is the annual mean or average air temperature for the plant location. This study investigates the effect …
View paper: Effect of Ambient Design Temperature on Air-Cooled Binary Plant Output
Download unavailable
-
Jalilinasrabady, Saeid; Itoi, Ryuichi; Gotoh, Hiroki; Kamenosono, Hiroyuki
·
Geothermal Resources Council Transactions
·
2010
·Single flash; Flash steam power generation; Power plant desi
The single flash Takigami Geothermal Power Plant is located in the southwestern part of Oita prefecture, Kyushu Island, Japan, with installed capacity of 25 MW. Mathematical models for energy and exergy flows were developed and implemented in the Engineering …
View paper: Energy and Exergy Analysis of Takigami Geothermal Power Plant, Oita, Japan
Download unavailable
-
Kreuter, Horst; Schrage, Christina
·
Geothermal Resources Council Transactions
·
2010
·Hybrid power generation; Power plant design and operation
… power concept coupling a biogas and a geothermal power plant is implemented in Neuried in the Upper Rhine Graben. The biogas plant is operational since 2007; the geothermal project will start drilling the first well in 2010. From a technical point of …
View paper: The Hybrid Power Plant Neuried, Germany
Download unavailable
-
Rodriguez, Saul; Speirs, Donald
·
Geothermal Resources Council Transactions
·
2010
·Power plant design and operation; Operations management
Advanced power plant controls are now commonly applied to the newest fossil, nuclear and hydro plants to achieve maximum performance and increase reliability. The expansion of integrated plant controls to geothermal plants presents equally valuable …
View paper: Control System Concepts to Improve Geothermal Plant Availability
Download unavailable
-
Tassew, Merga
·
Geothermal Resources Council Transactions
·
2009
·Power plant design and operation; Operations management
… constructed the Aluto Langano geothermal pilot power plant (8.5 MW gross) consisting of two Ormat generating units, one an OEC (Ormat Energy Converter) and the other a GCCU (Geothermal Combined Cycle Unit consisting of a back pressure steam turbine …
View paper: Maintenance and Operational Experience Gained by Operating the Aluto Langano Geothermal Pilot Power Plant
Download unavailable
-
Bouche, Douglas P.
·
Geothermal Resources Council Transactions
·
2009
·Power plant design and operation
… that careful consideration be given to designing the plant that represents a good fit with respect to the plant’s reservoir, area surface conditions, and the environment. This paper summarizes some important design considerations that should be made in …
View paper: Understanding Plant External Conditions When Designing Geothermal Power Plants--Some Important Considerations
Download unavailable
-
Wallace, Kevin; Dunford, Tim; Ralph, Marshall; Harvey, William
·
Geothermal Resources Council Transactions
·
2009
·Power plant design and operation; Dual flash; NCG; Air quali
… addition to Turkey´s renewable energy landscape. The plant, shown in Figure 1, was completed in Spring 2009 by the Turkish company Güri? and is operated by its subsidiary Gürmat. Power plant design was performed by POWER Engineers, Inc. of the USA. The …
View paper: Germencik: A Thoroughly Modern Flash Plant in Turkey
Download unavailable
-
Kindap, Ali; Kaya, Tevfik; Tut, Fusun
·
Geothermal Resources Council Transactions
·
2009
·Power plant design and operation
… able to generate energy. Kizildere Geothermal Power Plant is operated by Electricity Generation Co. Inc (EÜAS) on be half of the government for 24 years. Zorlu Energy Group acquired the operational rights of the power plant and its surrounding (70 …
View paper: Privatization of Kizildere Geothermal Power Plant and Current Approaches for the Field and Plant
Download unavailable
-
Campbell, Richard G.
·
Geothermal Resources Council Transactions
·
2007
·Power plant design and operation; Flash steam power generati
… reliability, and economics. While two technologies—steam plants and binary cycles—continue to dominate commercial applications, there have been numerous advances within those technologies.