Searches title, authors, abstract, keywords and session. Use "quotes" for an exact phrase.
All filled fields must match. Conference and year are added to the filters on the left.
Marquart, Clauser, MeProRisk R C · European Geothermal Conference · 2013 ·5 Hydrothermal Systems – Resource Assessment (HS1)
The MeProRisk II project is a joint venture of 5 universities and a geophysical consultancy for defining and developing methods and workflows or evaluating geothermal reservoirs. These workflows combine information on the structure and the lithology of a …
View paper: MeProRisk-II -A joint research project for optimization strategies and risk analysis for deep geothermal reservoirs PDF: MeProRisk-II -A joint research project for optimization strategies and risk analysis for deep geothermal reservoirs (1,581 KB)
Atam, Verhelst, Helsen · European Geothermal Conference · 2013 ·9 Shallow (SG)
In this paper, we develop a parameterized state-space model for borehole dynamics in terms of borehole length. The closed form formula can be used explicitly in an optimization framework to determine simultaneously the optimal borehole depth and the optimal …
View paper: Borehole dynamics parameterization for thermal performance optimization under cost constraints PDF: Borehole dynamics parameterization for thermal performance optimization under cost constraints (851 KB)
Montagud, Cervera- Vázquez, Corberán · European Geothermal Conference · 2013 ·9 Shallow (SG)
Geocool plant was the result of a EU project whose main purpose was to adapt ground source heat pump technology to cooling dominated areas. The installation was finally built by the end of year 2004 and it has been monitored since February 2005 until …
View paper: Analysis of different GSHP system configurations: tank and control sensor position and its influence on the system performance PDF: Analysis of different GSHP system configurations: tank and control sensor position and its influence on the system performance (560 KB)
Marta R. Karlsdottir, Halldor Palsson and Olafur P. Palsson · World Geothermal Congress · 2010 ·26. Power Generation
The objective of the study is to compare methods that increase power generation from conventional single flash power plants by utilizing waste heat contained in brine from steam separators. Three different utilization methods are investigated by constructing …
View paper: Comparison of Methods for Utilization of Geothermal Brine for Power Production PDF: Comparison of Methods for Utilization of Geothermal Brine for Power Production (731KB)