Skip to content
International Geothermal Association Conference Paper Database Live

Searches title, authors, abstract, keywords and session. Use "quotes" for an exact phrase.

Advanced search

All filled fields must match. Conference and year are added to the filters on the left.

Filters

Show filters
Conference
Year
–

1–3 of 3 papers

  1. Success of Multiple-leg Well Completions at the San Jacinto-Tizate Geothermal Field, Nicaragua

    K.M. Mackenzie, M.W. Steffen and R. Phillips · ARGeo · 2012 ·Drilling

    … Plan that was particularly successful was the use of multiple-leg well completions in certain situations, which resulted in an estimated cost saving of US$6M and a 10 week saving on schedule. This paper provides case studies for the use of “forked” …

    View paper: Success of Multiple-leg Well Completions at the San Jacinto-Tizate Geothermal Field, Nicaragua PDF: Success of Multiple-leg Well Completions at the San Jacinto-Tizate Geothermal Field, Nicaragua (525KB)

  2. Advances in Multiple-Legged Well Completion Methodology at the Geysers Geothermal Field, California

    Roger C. Henneberger, Murray C. Gardner and Daniel Chase · World Geothermal Congress · 1995 ·SECTION 5 - Drilling and Completion Technology

    … part of the field poses special difficulties for drilling multiple-legged or "forked" wells, because of greater reservoir depth, higher reservoir temperatures. the need for narrower well completions, and less stable rock conditions. Three wells within the …

    View paper: Advances in Multiple-Legged Well Completion Methodology at the Geysers Geothermal Field, California PDF: Advances in Multiple-Legged Well Completion Methodology at the Geysers Geothermal Field, California

  3. Success of Multiple Leg Well Completions at the San Jacinto Tizate Geothermal Field, Nicaragua

    K.M. Mackenzie, M.W. Steffen and R. Phillips · New Zealand Geothermal Workshop · 2012 ·07. Geothermal Engineering - Drilling and Well Testing

    … Plan that was particularly successful was the use of multiple-leg well completions in certain situations, which resulted in an estimated cost saving of US$6M and a 10 week saving on schedule. This paper provides case studies for the use of “forked” …

    View paper: Success of Multiple Leg Well Completions at the San Jacinto Tizate Geothermal Field, Nicaragua PDF: Success of Multiple Leg Well Completions at the San Jacinto Tizate Geothermal Field, Nicaragua (478KB)

Papers are freely accessible. Copyright remains with the authors and conference organisers as stated on each paper.

IGA Conference Paper Database · New search