  1. The Potential for Energy Recovery and Electricity Generation in High-Pressure Production Wells and Gathering Systems Using Turboexpanders

    Alfonso GARCÍA-GUTIÉRREZ, Juan. I. MARTÍNEZ-ESTRELLA, Rosember OVANDO-CASTELAR, Ismael CANCHOLA-FÉLIX, Vicente P. JACOBO-GALVAN, Abelardo VÁZQUEZ-SANDOVAL, César ROSALES-LÓPEZ · World Geothermal Congress · 2015 ·Power Generation

    … and electricity generation in production wells and gathering systems with high pressures currently not used in two geothermal fields is discussed. Losses of available high-pressure include the pressure drop at the wellhead production orifice plates …

    View paper: The Potential for Energy Recovery and Electricity Generation in High-Pressure Production Wells and Gathering Systems Using Turboexpanders PDF: The Potential for Energy Recovery and Electricity Generation in High-Pressure Production Wells and Gathering Systems Using Turboexpanders (863 KB)

  2. Energy Analysis of the Cerro Steam Gathering System

    Garcia-Gutierrez, Alfonso; Martinez-Estrella, Juan; Ovando-Castelar, Rosember; Canchola-Felix, Ismael; Jacobo-Galvan, Paul · Geothermal Resources Council Transactions · 2014 ·Power plant design and operation; Heat loss; Pipelines; Stea

    … the Cerro Prieto high- and low-pressure (HP and LP) steam gathering networks was performed to determine the thermal efficiencies of the partial (transportation sub-processes between selected points) and overall (wellhead to power plant inlet) processes from …

    View paper: Energy Analysis of the Cerro Steam Gathering System Download unavailable

  3. Energy Recovery Using Turboexpanders in Production Wells and Gathering Systems With High Pressures

    Garcia-Gutierrez, Alfonso; Martinez-Estrella, Juan I.; Ovando-Castelar, Rosember; Canchola-Felix, Ismael; Gutierrez-Espericueta, Sergio; Vazquez-Sandoval, Abelardo; Rosales-Lopez, Cesar · Geothermal Resources Council Transactions · 2013 ·Power plant design and operation; Steam separators; Turboexp

    … high pressures currently not used in the production and gathering system of two geothermal fields. Losses of available high-pressure include the pressure drop occurring at the wellhead production orifice plates which reduce the fluid pressure from its …

    View paper: Energy Recovery Using Turboexpanders in Production Wells and Gathering Systems With High Pressures Download unavailable

  4. Two Phase Flow Gathering System at Coso Unit 1

    Dietl, Bruno; Taylor, John; Martin, Bill · Geothermal Resources Council Transactions · 1989 ·Two phase flow; Pipelines; Power plant design and operation

    … and construction considerations of the two phase flow gathering system (first of its kind in the USA), the brine and noncondensable gas injection system and the steam vent facilities.

    View paper: Two Phase Flow Gathering System at Coso Unit 1 Download unavailable

  5. Design of Steam Gathering Systems at The Geysers: A State-of-the-Art-Review

    Veizades, Harry; Cain, W. J. · Geothermal Resources Council Transactions · 1989 ·Pipelines; Steam separators; Equipment design

    Geothermal gathering system designs have evolved at the Geysers KGRA to meet the ever-changing operational and design parameters. New technologies have enabled more accurate and economical designs to be developed. This paper lists some of the developments …

    View paper: Design of Steam Gathering Systems at The Geysers: A State-of-the-Art-Review Download unavailable

  6. Operational Results of a Dry-Steam Resource Chloride Corrosion Mitigation System

    Hirtz, Paul; Miller, Joe; Prabhu, Edan · Geothermal Resources Council Transactions · 1990 ·Corrosion; Power plant design and operation; Chloride; Scrub

    … Ltd. to prevent acidic chloride induced corrosion of the gathering system and to protect the turbine from pitting corrosion, stress corrosion cracking and erosion related to the presence of chloride in the steam. To date, no failures of steam piping have …

    View paper: Operational Results of a Dry-Steam Resource Chloride Corrosion Mitigation System Download unavailable

  7. NCPA Geysers Geothermal Development of Integrated Steam Field Management System

    Fontes, Roger A. · Geothermal Resources Council Transactions · 1984 ·Economics; Power plant design and ooperation; Air quality; B

    … and development of an integrated electric power generating system linking two plants containing a total of four separate turbine generator units. How the Northern California Power Agency (NCPA) engineered, financed, built, operated and provide for …

    View paper: NCPA Geysers Geothermal Development of Integrated Steam Field Management System Download unavailable

  8. The Case for Automatic Control of Geothermal Steam-Collection Systems

    McGee, Roland · Geothermal Resources Council Transactions · 1979 ·Environmental aspects; Air quality; Injection; Hydrogen sulf

    Dry steam collection systems typified the Geysers field are subject to increasingly stringent regulation in the area of emissions. Labor costs of collection systems are increasing because of inflation an the sophisticated systems that will be required to …

    View paper: The Case for Automatic Control of Geothermal Steam-Collection Systems Download unavailable

  9. Coupled Production Facility and Geothermal Well Performance Modelling: Case Studies and Insights

    Dale Emet ALTAR, Nigel Joseph KABIGTING, Joy Cristine TOLENTINO, Miguel Enrico VILLENA · World Geothermal Congress · 2020 ·Production Engineering, Steam Gathering Systems

    … For two-phase, intermediate enthalpy production systems like in the Tiwi and Mak-Ban geothermal fields in the Philippines, transport phenomena have significant impacts on the overall system production. Transport can account for 65% (as high as 80% …

    View paper: Coupled Production Facility and Geothermal Well Performance Modelling: Case Studies and Insights PDF: Coupled Production Facility and Geothermal Well Performance Modelling: Case Studies and Insights (1707 KB)

  10. Numerical Simulation of a Steam Pipeline Network Using Dymola

    Maurizio CEI, Mirco LUPI · World Geothermal Congress · 2020 ·Production Engineering, Steam Gathering Systems

    … of Tuscany. The area hosts a steam-dominated geothermal system characterized by the presence of shallow and deeper reservoirs with different temperature and pressure conditions. The pipeline network examined counts of more than a hundred of branches and …

    View paper: Numerical Simulation of a Steam Pipeline Network Using Dymola PDF: Numerical Simulation of a Steam Pipeline Network Using Dymola (1255 KB)

  11. Darajat Unit II/III Interface Debottlenecking Project

    Wibisono YAMIN, Miftachul CHOIRI, Amsal GOESMANO and Temy NURFAHMIAWATI · World Geothermal Congress · 2015 ·Production Engineering, Steam Gathering Systems

    … surface facility to optimize reservoir management system and to meet the operation target in sustaining generation. • Minimizing pressure drop in geothermal production line can provide economical benefits to the company by deferring make up wells …

    View paper: Darajat Unit II/III Interface Debottlenecking Project PDF: Darajat Unit II/III Interface Debottlenecking Project (905 KB)

  12. Review of Steam-Water Separator Performance Testing

    Alexandre RIVERA DIAZ, Kevin KOOREY · World Geothermal Congress · 2020 ·Production Engineering, Steam Gathering Systems

    A review of theoretical calculations and test results for geothermal steam-water separator performance is presented. An overview of different test methodologies is given, including a discussion of their limitations, potential parameters that might influence …

    View paper: Review of Steam-Water Separator Performance Testing PDF: Review of Steam-Water Separator Performance Testing (743 KB)

  13. A Double-Flash Plant with Interstage Reheat: Thermodynamic Analysis and Optimization

    DiPippo, Ronald; Vrane, David R. · Geothermal Resources Council Transactions · 1991 ·Power plant design and operation; Flash steam power generati

    … an interstage reheater. Intended for use with two phase gathering systems, the new plant can generate over six percent more output than an optimized double flash plant, depending on the reservoir fluid temperature. The excess revenues from the added …

    View paper: A Double-Flash Plant with Interstage Reheat: Thermodynamic Analysis and Optimization Download unavailable

  14. Interaction Between Surface Facilities and Wells at an Operating Geothermal Flash Plant

    Stock, Don D. · Geothermal Resources Council Transactions · 1991 ·Well testing; Flow testing; Fluid dynamics; Power plant desi

    … Such facilities provide a poor model of the complex gathering system to which a typical well may ultimately be connected. Without carful analysis, such test results can lead to unrealistic expectations of well output under operating conditions. All …

    View paper: Interaction Between Surface Facilities and Wells at an Operating Geothermal Flash Plant Download unavailable

  15. Factors Controlling pH and Optimum Corrosion Mitigation in Chloride-Bearing Geothermal Steam at The Geysers

    Meeker, Kimberly A.; Robinson Haizlip, Jill · Geothermal Resources Council Transactions · 1990 ·Corrosion; Chloride; Scrubbers; Brine chemistry; Computer mo

    … (C1) scrubbing water and sodium hydroxide (NaOH) injection system has been tested for corrosion mitigation of superheated, C1 bearing geothermal steam (38-94 ppmw) in the northwest portion of the Geysers in California. Corrosion has been successfully …

    View paper: Factors Controlling pH and Optimum Corrosion Mitigation in Chloride-Bearing Geothermal Steam at The Geysers Download unavailable

  16. Two-Phase Flow Measurement by Chemical Tracer Technique for Uenotai Geothermal Field in Japan

    Sato, Tatsuya; Osato, Kazumi; Hirtz, Paul; Kunzman, Russell; Futagoishi, Masao · Geothermal Resources Council Transactions · 1996 ·Two phase flow; Tracer testing

    View paper: Two-Phase Flow Measurement by Chemical Tracer Technique for Uenotai Geothermal Field in Japan Download unavailable

  17. Design and Construction of the Coso Geothermal Power Projects

    Schoonmaker, James L.; Maricle, Mark F. · Geothermal Resources Council Transactions · 1990 ·Power plant design and operation; Power grids

    The California Energy Company, Inc. (CECI) and Mission Power Engineering Company (MPE) have completed engineering and construction, and began operation of four additional geothermal generating units as part of the Coso Geothermal Project. These units are …

    View paper: Design and Construction of the Coso Geothermal Power Projects Download unavailable

  18. Ecological Aspects on Cerro Prieto Geothermal Field

    Mercado, S.; Bermejo, F. J. · Geothermal Resources Council Transactions · 1988 ·Environmental aspects; Air quality; Water quality; Hydrogen

    The Cerro Prieto geothermal field, like all geothermal fields in the world, has several potential pollutants such as gases, brines, noise and heat; and problems as steam dispersion, subsidence, induced seismicity, scenic changes, and accidental spills. These …

    View paper: Ecological Aspects on Cerro Prieto Geothermal Field Download unavailable

  19. Project Development Desert Peak

    Diddle, C. P.; Gonser, W. C. · Geothermal Resources Council Transactions · 1985 ·Power plant design and operation; Binary cycle power generat

    In late 1982 Phillips Petroleum Company began preliminary design of a power plant for Desert Peak in Churchill County, Nevada. Like all geothermal resources and projects Desert Peak is unique and required careful consideration of existing process schemes and …

    View paper: Project Development Desert Peak Download unavailable

  20. The First Two Years of Operation of Tongonan I, Leyte, Philippines, A Variable Load Geothermal Power Plant

    Vasquez, Nazario C. · Geothermal Resources Council Transactions · 1985 ·Exploration; Geophysical surveys; Reservoir modeling; Reserv

    IN the early stages of geothermal power development in the Philippines, it had always been assumed that a geothermal power plant is good only for base load application. Against this entrenched belief, Tongonan I, a 112.5 MW geothermal power plant on the …

    View paper: The First Two Years of Operation of Tongonan I, Leyte, Philippines, A Variable Load Geothermal Power Plant Download unavailable

  21. Roosevelt Hot Springs Unit Development: A Case History

    Kerna, M. J.; Allen, T. S. · Geothermal Resources Council Transactions · 1984 ·Exploration; Flash steam power generation; Power plant desig

    The Roosevelt Hot Springs Unit (RHSU) was unitized in April 1976 and was the first geothermal unit approved by the United States Department of the Interior. At the time, Phillips Petroleum Company was named unit operator. In the fall of 1980, after an …

    View paper: Roosevelt Hot Springs Unit Development: A Case History Download unavailable

  22. The Multi-Purpose Geothermal Test and Experimental Activities at Raft River, Idaho

    Chappell, Robert N.; Griffith, John L.; Knowles, Wayne R.; Schultz, Robert J. · Geothermal Resources Council Transactions · 1978 ·Exploration; Direct use; Agricultural applications; Aquacult

    Abstract not available

    View paper: The Multi-Purpose Geothermal Test and Experimental Activities at Raft River, Idaho Download unavailable

Papers are freely accessible. Copyright remains with the authors and conference organisers as stated on each paper.

IGA Conference Paper Database · New search