Skip to content
International Geothermal Association Conference Paper Database Live

Searches title, authors, abstract, keywords and session. Use "quotes" for an exact phrase.

Advanced search

All filled fields must match. Conference and year are added to the filters on the left.

Filters

Show filters
Conference
Year
–

1–25 of 91 papers

  1. Cementless Geothermal Well Construction

    Elvin ALLAHVERDIYEV, Khizar ABID, Catalin TEODORIU · Stanford Geothermal Workshop · 2026 ·Drilling

    … loads on the casing strings and cement. Historically, well construction relied on cement to provide annular zonal isolation, structural support, casing protection, and wellbore stability. However, the cement sheath is prone to mechanical failures (e.g., …

    View paper: Cementless Geothermal Well Construction PDF: Cementless Geothermal Well Construction (1841 KB)

  2. DE-RISKING GEOTHERMAL PROJECTS BY RE-THINKING WELL DESIGN AND THE WELL CONSTRUCTION MINDSET

    F.R. Gutterres, S. Hallundbæk, J.J.R. Cayao, W.H. Chum · New Zealand Geothermal Workshop · 2021 ·Session 2.2 - Drilling & Well Testing 1

    … holistic, strategic, and innovative way of planning well construction. This can be achieved by integrating data acquisition not only during appraisal stages but also within well construction and production/injection phases with permanent monitoring …

    View paper: DE-RISKING GEOTHERMAL PROJECTS BY RE-THINKING WELL DESIGN AND THE WELL CONSTRUCTION MINDSET PDF: DE-RISKING GEOTHERMAL PROJECTS BY RE-THINKING WELL DESIGN AND THE WELL CONSTRUCTION MINDSET (184KB)

  3. Theistareykir Geothermal Power Plant - Challenges in Project Management During Design and Construction

    Valur KNÚTSSON, Sigurgeir Björn GEIRSSON, Hreinn HJARTARSON, Jón Arnar EMILSSON · World Geothermal Congress · 2020 ·Case Histories

    … for turbine, generator and cold end was signed and construction at site started. From 2016 production drilling continued for 90 MWe. In end of 2017 unit 1 started commercial operation and unit 2 started commercial operation in spring of 2018. Today …

    View paper: Theistareykir Geothermal Power Plant - Challenges in Project Management During Design and Construction PDF: Theistareykir Geothermal Power Plant - Challenges in Project Management During Design and Construction (2224 KB)

  4. Ecological Restoration of Construction Sites of Geothermal Power Plants

    Magnea MAGNUSDOTTIR · World Geothermal Congress · 2020 ·Environmental Aspects

    … soil in the Hengill area of Iceland were disturbed at the construction sites at Hellisheidi and Nesjavellir geothermal power plants. The disturbance was related to the establishment of buildings, drilling platforms, ditches, roads, etc. Restoration …

    View paper: Ecological Restoration of Construction Sites of Geothermal Power Plants PDF: Ecological Restoration of Construction Sites of Geothermal Power Plants (1238 KB)

  5. IEA ECES ANNEX 27 - Quality Management in Design, Construction and Operation of Borehole Systems

    Manfred REUSS, Hanne KARRER · World Geothermal Congress · 2020 ·Geothermal Heat Pumps

    … and recommendations for quality management in design, construction and operation of systems with borehole heat exchangers like ground source heat pumps and borehole thermal energy storage. The goal is to provide practical experiences from the eleven …

    View paper: IEA ECES ANNEX 27 - Quality Management in Design, Construction and Operation of Borehole Systems PDF: IEA ECES ANNEX 27 - Quality Management in Design, Construction and Operation of Borehole Systems (399 KB)

  6. Final Design for Construction Phase of Lumut Balai Geothermal Power Plant, Indonesia

    Hanifah Bagus SULISTYARDI · World Geothermal Congress · 2020 ·Power Generation

    … This technical paper will compare the final design for construction of the geothermal power plant against author’s previous publication in World Geothermal Congress 2015 and also highlight the technical features that distinguish it of its kind. The …

    View paper: Final Design for Construction Phase of Lumut Balai Geothermal Power Plant, Indonesia PDF: Final Design for Construction Phase of Lumut Balai Geothermal Power Plant, Indonesia (744 KB)

  7. Design and Construction of the Kawerau Steam Field

    KC Foong, Jay Valavil, Michael Rock · World Geothermal Congress · 2010 ·25. Production Engineering and Steam Gathering Systems

    The steam field design and construction at the MRP Kawerau Geothermal Project in New Zealand is unique in many ways. The location of one well pad is unusual in that it is in the middle of an industrial complex. The steam field two-phase piping system runs …

    View paper: Design and Construction of the Kawerau Steam Field PDF: Design and Construction of the Kawerau Steam Field (1965KB)

  8. Fast Track Construction of Kawerau and Nga Awa Purua Geothermal Power Stations in New Zealand

    Bernard Hill, Paul Ware · World Geothermal Congress · 2010 ·26. Power Generation

    … with the total program duration for design, consenting, construction and commissioning activities (for each project) to be completed within two years. This paper primarily focuses on the power generating facility (PGF) developed within the ‘fenced’ …

    View paper: Fast Track Construction of Kawerau and Nga Awa Purua Geothermal Power Stations in New Zealand PDF: Fast Track Construction of Kawerau and Nga Awa Purua Geothermal Power Stations in New Zealand (606KB)

  9. Enhanced Geothermal Systems (EGS) Well Construction Technology Evaluation Synopsis

    Yarom Polsky, A.J. (Chip) Mansure, Douglas Blankenship, Robert J. Swanson and Louis E. Capuano, Jr. · Stanford Geothermal Workshop · 2009 ·HDR/EGS

    A synopsis of a report evaluating well construction technology for Enhanced Geothermal Systems (EGS) is presented. The assessment of well construction technology had two primary objectives: 1. Determining the ability of existing technologies to develop EGS …

    View paper: Enhanced Geothermal Systems (EGS) Well Construction Technology Evaluation Synopsis PDF: Enhanced Geothermal Systems (EGS) Well Construction Technology Evaluation Synopsis (170KB)

  10. Reconstruction and Redesign of the Project ìIstibanjaî - Vinica

    Sanja Popovska Vasilevska, Kiril Popovski · World Geothermal Congress · 2005 ·14. Direct Use, Geothermal Heat Pumps

    … of the project is given in the paper, explanation of the reconstructions made, new technical solutions introduced, and positive and negative (very few and marginal ones) consequences to the work of the system. Realization of the project and analysis of …

    View paper: Reconstruction and Redesign of the Project ìIstibanjaî - Vinica PDF: Reconstruction and Redesign of the Project ìIstibanjaî - Vinica (1317KB)

  11. Geothermal Well Design, Construction and Failures

    J.N.A. Southon · World Geothermal Congress · 2005 ·10. Drilling and Completion Technology

    … are the casing and cement used in the well. Design and construction techniques have been developed to minimise the risk of catastrophic failure of casing. Also, studies have shown that implementing code design requirements will not necessarily contribute …

    View paper: Geothermal Well Design, Construction and Failures PDF: Geothermal Well Design, Construction and Failures (75KB)

  12. Measuring Cement Thermal Expansion Coefficient and Its Impact Towards Geothermal Well Construction

    Alberto TOLEDO VELAZCO, Khizar ABID, Miguel Leonardo ROMERO TELLEZ, Catalin TEODORIU · Stanford Geothermal Workshop · 2024 ·Drilling

    The global energy demand is increasing worldwide, and geothermal is becoming an attractive option due to the untapped resources and being considered an important green energy source. Geothermal wells are challenging due to their depth, which makes the …

    View paper: Measuring Cement Thermal Expansion Coefficient and Its Impact Towards Geothermal Well Construction PDF: Measuring Cement Thermal Expansion Coefficient and Its Impact Towards Geothermal Well Construction (1105 KB)

  13. Performance Characteristics and Techno-economic Analysis of Geothermal Heat Pumps from Well Construction Perspective

    Wu, Yuxing; Salehi, Saeed; Karbalaeisaleh, Fatemeh · Geothermal Resources Council Transactions · 2022 ·Geothermal heat pumps; Vertical ground loops; Horizontal gro

    View paper: Performance Characteristics and Techno-economic Analysis of Geothermal Heat Pumps from Well Construction Perspective Download unavailable

  14. Drilling Infrastructure Construction Challenges in Geothermal Exploration Project in Eastern Indonesia

    Dorman PURBA, Vicky R. CHANDRA, Ferdino R. FADHILLAH, Rakhmawati D. WULAN, Agus SOEDARSA, Daniel W. ADITYATAMA, Mukhamad F. UMAM · World Geothermal Congress · 2020 ·Exploration

    In an attempt to achieve a national target of geothermal energy development, it is crucial to have all geothermal exploration projects run as per schedule. However, as an archipelago nation, Indonesia faces wide ranges of challenges in developing geothermal …

    View paper: Drilling Infrastructure Construction Challenges in Geothermal Exploration Project in Eastern Indonesia PDF: Drilling Infrastructure Construction Challenges in Geothermal Exploration Project in Eastern Indonesia (2089 KB)

  15. A Novel View of Cement Failure with Application to Geothermal Well Construction

    Catalin TEODORIU, Mi Chin YI, Adonis ICHIM, Saeed SALEHI · Stanford Geothermal Workshop · 2018 ·Drilling

    Geothermal wells are designed following oil and gas practice but have a longer expected life span, and thus their integrity evaluation is based on the same standards and requirements of hydrocarbon wells. Thermal cement degradation is known to occur at …

    View paper: A Novel View of Cement Failure with Application to Geothermal Well Construction PDF: A Novel View of Cement Failure with Application to Geothermal Well Construction (1075 KB)

  16. Theistareykir Geothermal Power Plant, A Sustainable Construction

    Knutsson, Valur; Geirsson, Sigurgeir Bjorn; Hjartarson, Hreinn; Emilsson, Jon Arnar · Geothermal Resources Council Transactions · 2018 ·Power plant design and operation; Environmental aspects; Law

    View paper: Theistareykir Geothermal Power Plant, A Sustainable Construction Download unavailable

  17. Making Your Construction Documents Financeable

    Atkin, Jeffery R.; Piccola, Amie S.; Dufour, Bill D. · Geothermal Resources Council Transactions · 2011 ·Financing; Business administration

    abstract not provided

    View paper: Making Your Construction Documents Financeable Download unavailable

  18. “China Geothermal Town” Construction Promote Geothermal Development in China-Xianyang Model and Xiongxian Model as Two Examples

    Li Hongying · World Geothermal Congress · 2010 ·34. District Heating and Agriculture

    Geothermal resources are important in the renewable energy field and its exploitation is currently becoming more popular. The “China Geothermal Town” naming action is helpful for regulating geothermal exploitation behavior directed by the MLR and the CMA. Two …

    View paper: “China Geothermal Town” Construction Promote Geothermal Development in China-Xianyang Model and Xiongxian Model as Two Examples PDF: “China Geothermal Town” Construction Promote Geothermal Development in China-Xianyang Model and Xiongxian Model as Two Examples (130KB)

  19. Towards the Construction and Environmental Impacts of the Kamojang Geothermal Power Project, West Java, Indonesia

    Basoeki, Mohammed; Radja, Vincent T. · Geothermal Resources Council Transactions · 1979 ·Power plant design and operation; Economics; Environmental a

    Kawah Kamojang geothermal field is located in West Java, 30 km southwest of Bandung, West Java, Indonesia, at an altitude of approximately 1500 m. Climatically, the region is typically tropical with a wet monsoon season from October to April. Production …

    View paper: Towards the Construction and Environmental Impacts of the Kamojang Geothermal Power Project, West Java, Indonesia Download unavailable

  20. CO2 Resistance, Improved Mechanical Durability, and Successful Placement in a Problematic Lost-Circulation Interval Achieved: Reverse Circulation of Foamed Calcium Aluminate Cement in a Geothermal Well

    Bour, Daniel L.; Hernandez, Rafael · Geothermal Resources Council Transactions · 2003 ·Drilling - Well Construction; Cementing; Calcium Aluminate C

    View paper: CO2 Resistance, Improved Mechanical Durability, and Successful Placement in a Problematic Lost-Circulation Interval Achieved: Reverse Circulation of Foamed Calcium Aluminate Cement in a Geothermal Well Download unavailable

  21. Annex 7: The IEA's Role in Advanced Geothermal Drilling

    Finger, John T.; Hoover, Eddie R. · Geothermal Resources Council Transactions · 2003 ·Organizational profiles; Drilling; Well Construction; Advanc

    View paper: Annex 7: The IEA's Role in Advanced Geothermal Drilling Download unavailable

  22. Development of High-Temperature Batteries for Use in Geothermal and Oil/Gas Boreholes

    Guidotti, Ronald A.; Normann, Randy A.; Reinhardt, Frederick W.; Odinek, Judy · Geothermal Resources Council Transactions · 2003 ·Drilling - Well Construction; High-Temperature Battery; MWD

    View paper: Development of High-Temperature Batteries for Use in Geothermal and Oil/Gas Boreholes Download unavailable

  23. Successful Deepening of Well PGM-46 at the Miravalles Geothermal Field

    Moya, Paul; Gonzalez, Carlos · Geothermal Resources Council Transactions · 2003 ·Drilling - Well Construction; Well Recompletion

    View paper: Successful Deepening of Well PGM-46 at the Miravalles Geothermal Field Download unavailable

  24. Advantages of Using Top-Drive-System for High Temperature Geothermal Well Drilling

    Saito, Seiji; Kitao, Koji; Saeki, Kazuhiro; Suto, Yuko · Geothermal Resources Council Transactions · 2003 ·Drilling - Well Construction; Top Drive System; Drill bits;

    View paper: Advantages of Using Top-Drive-System for High Temperature Geothermal Well Drilling Download unavailable

  25. Casing Drilling Reduces Lost Circulation Problems

    Tessari, Robert M.; Warren, Tommy · Geothermal Resources Council Transactions · 2003 ·Drilling - Well Construction; Casing Drilling; Lost Circulat

    View paper: Casing Drilling Reduces Lost Circulation Problems Download unavailable

1 2 3 4 Next ›

Papers are freely accessible. Copyright remains with the authors and conference organisers as stated on each paper.

IGA Conference Paper Database · New search