Searches title, authors, abstract, keywords and session. Use "quotes" for an exact phrase.
All filled fields must match. Conference and year are added to the filters on the left.
M. Kelley, D. Chaparro, O. Goh, B. Murphy · New Zealand Geothermal Workshop · 2024 ·Session 5.2 - DRILLING & WELL TESTING 2 | PRODUCTION & MANAG
… casing annulus. As an initial risk mitigation prior to commissioning in 2017, a pack-off assembly was added to the effected annulus to contain any shallow hot aquifer fluids, to allow thermal expansion of trapped water between the casings, and to allow …
View paper: Post drilling outer casing cement remediation and recommissioning of a Rotokawa well PDF: Post drilling outer casing cement remediation and recommissioning of a Rotokawa well (599KB)
George NGOMI, Leonard LANGAT · World Geothermal Congress · 2020 ·Case Histories
Commissioning geothermal power plants is considered a crucial step in the geothermal energy development cycle. It is the last stage prior to commercial operation and it aims at ensuring that all guaranteed system conditions are met. In the year 2015, Kenya …
View paper: Commissioning the 280MW Geothermal Power Plants in Olkaria, Kenya PDF: Commissioning the 280MW Geothermal Power Plants in Olkaria, Kenya (792 KB)
Waldheim, Johanna; Towers, Jordan; Wilson, Daniel; Winmill, Ralph · Geothermal Resources Council Transactions · 2023 ·Well abandonment; Equipment design
View paper: Geothermal Well Abandonment Preparation Aided By Real Time Video Technology Download unavailable
Hiroshi Funaba, Toshie Muto, Ian Stabler · World Geothermal Congress · 2010 ·26. Power Generation
This paper presents some of the control challenges associated with the application of a distributed control system intended to provide integrated control of all functions across Mighty River Power’s Kawerau plant in New Zealand. The control system provides …
View paper: Features of Kawerau Geothermal Plant Control System PDF: Features of Kawerau Geothermal Plant Control System (141KB)