Skip to content
International Geothermal Association Conference Paper Database Live

Searches title, authors, abstract, keywords and session. Use "quotes" for an exact phrase.

Advanced search

All filled fields must match. Conference and year are added to the filters on the left.

Filters

Show filters
Conference
Year
–

76–100 of 176 papers

  1. Evaluation of the Toxicity of a Mixture of Geothermal and Fresh Groundwater in Case of Perforation of Well Casing

    Afif Abou Akar · World Geothermal Congress · 1995 ·SECTION 13 - Environmental and Social Aspects

    Carbon steel casings of geothermal wells exploiting the Dogger aquifer in the Paris Basin are subject to corrosion due to the aggressivity of the geothermal fluid containing CI, HS-/H-S, and CO3/CO2. When localized this corrosion can lead to perforation of …

    View paper: Evaluation of the Toxicity of a Mixture of Geothermal and Fresh Groundwater in Case of Perforation of Well Casing PDF: Evaluation of the Toxicity of a Mixture of Geothermal and Fresh Groundwater in Case of Perforation of Well Casing

  2. Drilling of geothermal boreholes and casing design in Poland

    Gonet, A; Sapi?ska-?liwa, A; Kowalski, T; ?liwa, T; Bieda, A · European Geothermal Congress · 2016 ·Technology and Best practice – Direct Uses

    Geothermal boreholes have to be designed and done as engineering facilities, i.e. they have to meet requirements resulting from their location and aim so as to ensure durability, maintenance and conditions for proper exploitation. The construction of the …

    View paper: Drilling of geothermal boreholes and casing design in Poland PDF: Drilling of geothermal boreholes and casing design in Poland (530KB)

  3. Well Design and Well Workover to Land Deep Production Casings in Menengai Field

    Khaemba, Abraham W. · Geothermal Resources Council Transactions · 2015 ·Drilling; Well completion; Cementing; Equipment design; Well

    View paper: Well Design and Well Workover to Land Deep Production Casings in Menengai Field Download unavailable

  4. PLASMABIT – Innovative drilling and casing system

    Kocis, Kristofic, Kocis · European Geothermal Conference · 2013 ·7 Petrothermal Systems (PS1-3)

    Currently, the price of the geothermal well is increasing with its depth exponentially due to friction, tripping and other negative features. PLASMABIT technology is being developed to drill with a constant speed, without need to change a drilling bit on …

    View paper: PLASMABIT – Innovative drilling and casing system PDF: PLASMABIT – Innovative drilling and casing system (244 KB)

  5. Puna Geothermal Venture, Hawaii--2005 Drilling Program

    Spielman, Paul; Rickard, William; Teplow, William · Geothermal Resources Council Transactions · 2006 ·Drilling; Foam cement; ICM; ROP; well development; casing pa

    … with difficulties and successfully complete the wells. A casing patch was used to repair parted casing. Foam cement was used for the intermediate casing and foam cement was reverse circulated for the production casing. Mud motors were used for most of the …

    View paper: Puna Geothermal Venture, Hawaii--2005 Drilling Program Download unavailable

  6. Cementing Operations on Fenton Hill During FY87, 1 October, 1986 to 30 September, 1987

    Cocks, George G.; Dreesen, Donald S.; Gill, Patrick J.; Root, Ronald L. · Geothermal Resources Council Transactions · 1988 ·Well completion; Well casing; Cementing; HDR/EGS

    … EE-2 below the proposed side track site, b) cement behind casing at 10220-24 ft, c) cement behind casing at 9800-04 ft, d) a whipstock plug, and e) the cementing through perforations, of the 9-5/8 in. casing from 6500 ft to the surface. Specific data on …

    View paper: Cementing Operations on Fenton Hill During FY87, 1 October, 1986 to 30 September, 1987 Download unavailable

  7. Acoustic Cement Bond Logging Diagnostics for Geothermal Applications

    Hsi-Tien Chang · Geothermal Resources Council Transactions · 1981 ·Well completion; Well casing; Cementing; Well logging; High

    For the successful and safe operation of a geothermal well, casing and cement conditions must be accurately determined. Cement bond logs are needed to detect channels or water pockets in the cement between the pipe and the formation and to determine the …

    View paper: Acoustic Cement Bond Logging Diagnostics for Geothermal Applications Download unavailable

  8. A Case History: The Completion of a Shallow, Over-Pressured Geothermal Well

    Rudisill, Jacob M. · Geothermal Resources Council Transactions · 1978 ·Well casing; Drilling; Cementing; Well completion

    … difficult were 1) the running of the 9-5/8" production casing and 2) remedying the consequences of the 13-3/8" surface casing. Patience, cooling of the well, and carefully performed and evaluated cement jobs were the technique employed which contributed …

    View paper: A Case History: The Completion of a Shallow, Over-Pressured Geothermal Well Download unavailable

  9. Material Challenges for Deep Superhot Geothermal Wells

    Karlsdottir, Sigrun N.; Thorhallson, Andri I.; Prikryl, Jan; Pekyavas, Mehmet; Ásbjörnsson, Sverrir; Wallevik, Sunna Ó.; Alexandersson, Kristján F. · Geothermal Resources Council Transactions · 2022 ·Superhot reservoirs; Well casing; Equipment design; Wellbore

    View paper: Material Challenges for Deep Superhot Geothermal Wells Download unavailable

  10. Testing Flexible Couplings for Geothermal Wells

    Thorbjornsson, I.O.; Kaldal, G.S.; Ragnarsson, A. · Geothermal Resources Council Transactions · 2019 ·Well casing; Wellbore integrity; Durability testing

    View paper: Testing Flexible Couplings for Geothermal Wells Download unavailable

  11. A Proactive Approach to Risk Mitigation in Geothermal Wells

    Adamczyk, Aaron; Fagade, Tayo; Fellers, Kerry · Geothermal Resources Council Transactions · 2018 ·Risk management; Brine chemistry; Well casing; Wellbore inte

    View paper: A Proactive Approach to Risk Mitigation in Geothermal Wells Download unavailable

  12. Completion Design Considerations for a Horizontal Enhanced Geothermal System

    Olson, Jeffrey; Eustes, Alfred; Fleckenstein, William; Eker, Erdinc; Baker, Reed; Augustine, Chad · Geothermal Resources Council Transactions · 2015 ·HDR/EGS; Cementing; Well completion; Well casing; Packers

    View paper: Completion Design Considerations for a Horizontal Enhanced Geothermal System Download unavailable

  13. Ultrasonic Logging in Cased Boreholes for Corrosion Evaluation

    Woods, Terry · Geothermal Resources Council Transactions · 1995 ·Well logging; Corrosion; Well casing; Equipment design

    View paper: Ultrasonic Logging in Cased Boreholes for Corrosion Evaluation Download unavailable

  14. A Note on Downhole Pressure in a Flowing or Static Steam Well

    Goyal, K. P. · Geothermal Resources Council Transactions · 1986 ·Pressure gradients; Well casing; Fluid dynamics

    An expression, to calculate downhole/bottomhole pressure in a flowing/shut-in well is derived. This relation also considers a well which may or may not be directionally drilled. Finally, an equation is developed to calculate an equivalent diameter for a well …

    View paper: A Note on Downhole Pressure in a Flowing or Static Steam Well Download unavailable

  15. Development of Geothermal Well Completion Systems -- II

    Nelson, E. B.; Eilers, L. H.; Moran, L. K.; Spangle, L. B.; Simpson, B. E. · Geothermal Resources Council Transactions · 1979 ·Cementing; Well casing; Durability testing

    Cementing of geothermal wells is of special interest due to the associated high temperature corrosive fluids and fragile formations. Systems used for cementing conventional oil and gas wells are not necessarily suitable in harsh geothermal environments and …

    View paper: Development of Geothermal Well Completion Systems -- II Download unavailable

  16. Corrosion Risk Assessment for Reinjection of Combined Brine Fluid to Intermediate Aquifer

    Sigit Prabowo, Keith Lichti, Soroor Ghaziof, Kelly Melia, Farrell Siega, Aimee Calibugan · World Geothermal Congress · 2026 ·Advances in Well Engineering and Pump Technology - Part 2

    … aquifer that is known to be corrosive to carbon steel well casings and cements. The chemistry of the intermediate aquifer contains corrosive CO₂-rich fluids which comes from the arising CO₂ gas from deep reservoir fluids through the permeable features of the …

    View paper: Corrosion Risk Assessment for Reinjection of Combined Brine Fluid to Intermediate Aquifer PDF: Corrosion Risk Assessment for Reinjection of Combined Brine Fluid to Intermediate Aquifer

  17. A Rigorous Design Approach for Superhot Rock Wells

    P. Jammer, P. V. Suryanarayana, S. M. Rahman · World Geothermal Congress · 2026

    … ductile materials. Consideration is also given to managing casing pre-compression and installation temperature, annular pressure buildup, “cold” collapse and connection selection. A clear illustration of this approach is presented through a case study …

    View paper: A Rigorous Design Approach for Superhot Rock Wells PDF: A Rigorous Design Approach for Superhot Rock Wells

  18. Reducing Flat Time in Geothermal Drilling: Surface-Landed Threaded Wellhead Installation

    Anil Tokcan, Sami Atalay, Ernesto Rivas, William M. Rickard · World Geothermal Congress · 2026 ·Advances in Well Engineering and Pump Technology - Part 1

    … that eliminates waiting on cement time by landing each casing string at the surface. The method leverages redesigned wellhead equipment (WHE) that allows the wellhead to be landed directly on the previous casing string using threaded connections …

    View paper: Reducing Flat Time in Geothermal Drilling: Surface-Landed Threaded Wellhead Installation PDF: Reducing Flat Time in Geothermal Drilling: Surface-Landed Threaded Wellhead Installation

  19. Bridging the Gap Between Geothermal and Oil&Gas in Mexico: Three HPHT Case Studies Using PTS-CCL-GR Logging

    Carlos Cerón Rendón, Antonio Godinez Urban · World Geothermal Congress · 2026 ·Subsurface Characterisation & Reservoir Engineering

    … a single HPHT PTS-CCL-GR (Pressure–Temperature–Spinner, Casing-Collar Locator, Gamma-Ray) toolstring in producing wells. Case 1: A °148C, 7678psi oil well in Veracruz undergoing workover operations, where a 24-hour coiled-tubing correlation pass reduced …

    View paper: Bridging the Gap Between Geothermal and Oil&Gas in Mexico: Three HPHT Case Studies Using PTS-CCL-GR Logging PDF: Bridging the Gap Between Geothermal and Oil&Gas in Mexico: Three HPHT Case Studies Using PTS-CCL-GR Logging

  20. Concept of a High-Temperature EGS Plant in Central Oregon

    Daniel DICHTER, Trenton CLADOUHOS, Quinlan BYRNE, Victor RUSTOM, Greg SZUTIAK · Stanford Geothermal Workshop · 2026 ·Enhanced Geothermal Systems

    … injectors have a tie-back design with a 7” outer diameter casing throughout; the producers have a similar casing in the feedzone, stepping up to a 9 5/8” outer diameter casing around 2.5 km TVD to improve the flow characteristics of the more-compressible …

    View paper: Concept of a High-Temperature EGS Plant in Central Oregon PDF: Concept of a High-Temperature EGS Plant in Central Oregon (4098 KB)

  21. Development of Passive Cooling Mechanisms for Acoustic Well Logging Tool Survival in High-Temperature High-Pressure Geothermal Environments

    Marcus ELLIOTT, Jamil El MASRY, Cristian PANTEA, Anthony OLIVETT, Eric DAVIS · Stanford Geothermal Workshop · 2026 ·Emerging Technology

    … acoustic well logging tools is vital for monitoring casing and cement integrity. However, the development of technology for diagnostics in such extreme conditions remains challenging. Conventional acoustic well logging tools fail to obtain reliable …

    View paper: Development of Passive Cooling Mechanisms for Acoustic Well Logging Tool Survival in High-Temperature High-Pressure Geothermal Environments PDF: Development of Passive Cooling Mechanisms for Acoustic Well Logging Tool Survival in High-Temperature High-Pressure Geothermal Environments (1063 KB)

  22. Geothermal operators are embracing geothermal multifinger caliper technology for derisking well interventions and workovers

    R. Khastoo, P.H. De Jesus · New Zealand Geothermal Workshop · 2025 ·POSTER

    … in order to acquire data that informs the condition of the casing or resorted to deploying a limited analogue-based caliper measuring tool. The quenching operation incurs cost and subjects the casing to potentially damaging thermal cycling. Technological …

    View paper: Geothermal operators are embracing geothermal multifinger caliper technology for derisking well interventions and workovers PDF: Geothermal operators are embracing geothermal multifinger caliper technology for derisking well interventions and workovers (875KB)

  23. Advancing Geothermal Well diagnostics with the Utilization of Hybrid Camera Technology

    Edcel Iolo Maramag, Ronn Johnn Catbagan · Philippine International Geothermal Congress · 2025

    … Its second operation, Well B, aims to assess the casing integrity of the wellbore and identify another potential problem in the 1930 ft CHF. The turbidity of the water during the manipulation and interaction of the water supply and fluid particles …

    View paper: Advancing Geothermal Well diagnostics with the Utilization of Hybrid Camera Technology PDF: Advancing Geothermal Well diagnostics with the Utilization of Hybrid Camera Technology (744KB)

  24. Lesson Learned: Well Logging Analysis to Interpret Shallow Connection Between Two Wells in Dieng Geothermal Field, Indonesia

    Ichwan Agusta ELFAJRIE, Reza Jamil FAJRI, ELFINA, Muhammad Istiawan NURPRATAMA, Nurkholis HARIYADI, Alan MUHADJIR · Stanford Geothermal Workshop · 2024 ·Production Engineering

    … response continues even though HCE-C was down because of casing integrity issues. Casing leakage was indicated by the chemistry analysis of a fluid sample from HCE-C. The relationship between both wells shows that the connection was not located in feed …

    View paper: Lesson Learned: Well Logging Analysis to Interpret Shallow Connection Between Two Wells in Dieng Geothermal Field, Indonesia PDF: Lesson Learned: Well Logging Analysis to Interpret Shallow Connection Between Two Wells in Dieng Geothermal Field, Indonesia (1606 KB)

  25. Djibouti Well Design For The Upcoming Wells at Gale Le Goma Site, Asal Region Using The African Code Of Practice.

    Mohamed Tabet · World Geothermal Congress · 2023 ·Drilling and Completion Technology

    … 700 m MD and the resulting minimum depth of the production casing was set at 300 m MD with 12-1/4” production section down to 700 m MD. Correspondingly, the surface casing has a minimum setting depth of 60 m MD. The selected casing steel grade was of API 5CT …

    View paper: Djibouti Well Design For The Upcoming Wells at Gale Le Goma Site, Asal Region Using The African Code Of Practice. PDF: Djibouti Well Design For The Upcoming Wells at Gale Le Goma Site, Asal Region Using The African Code Of Practice. (0,47 MB)

‹ Previous 1 2 3 4 5 6 … 8 Next ›

Papers are freely accessible. Copyright remains with the authors and conference organisers as stated on each paper.

IGA Conference Paper Database · New search