Dana Marie SUNGA, Richard DE GUZMAN, Miguel RAMOS, Michelle BIBON, Antonio LORENZO, Fidel SEE, Edwin ALCOBER · World Geothermal Congress · 2020 ·Corrosion and Scaling
… system. A base-case test line and treatment lines with dosing provision were simultaneously operated for ~30 days, alongside a field laboratory for immediate silica analysis. Out of four different chemical treatments, the most effective silica inhibition …
View paper: Simultaneous Silica Treatment Qualification Using On-Site Side Stream Test Rig PDF: Simultaneous Silica Treatment Qualification Using On-Site Side Stream Test Rig (1466 KB)
Kokhanenko, Pavlo ., Brown, Kevin . and Jermy, Mark · New Zealand Geothermal Workshop · 2014 ·Geothermal Engineering - Production and Management
… of utilization of the limited geothermal resources. Brine acidification has had considerable success in controlling silica polymerization and deposition in above-ground equipment. Organic inhibitors have also been trialed. Meanwhile, fouling by stibnite and …
View paper: Experimental And Theoretical Observations Of Scaling Rate And Implications For Anti-Scaling Practises PDF: Experimental And Theoretical Observations Of Scaling Rate And Implications For Anti-Scaling Practises (312 KB)
O. Goh, L. McLellan · New Zealand Geothermal Workshop · 2024 ·Session 2.2 - PRODUCTION & MANAGEMENT 1
Mercury operates the Rotokawa and Ngā Awa Pūrua geothermal power plants on the Rotokawa geothermal field located in the North Island of New Zealand. Over time, the geothermal fluid enthalpy has declined. The Rotokawa Upgrade project was initiated to mitigate …
View paper: Rotokawa upgrade project: Midlife geothermal power plant development and optimisation PDF: Rotokawa upgrade project: Midlife geothermal power plant development and optimisation (774KB)
R. Hudson, G. Morris, B. Pummer and P. Tearne · New Zealand Geothermal Workshop · 2012 ·06. Geothermal Engineering - Production and Management
The inception of the 166 MW Te Mihi geothermal power project followed the successful re-consenting of Wairakei power station in 2007. The configuration and construction of the Te Mihi power station in the west of the field optimised the use of the geothermal …
View paper: Te Mihi Geothermal Power Project - from Inception to Execution PDF: Te Mihi Geothermal Power Project - from Inception to Execution (240KB)
Tony Gray · World Geothermal Congress · 2010 ·26. Power Generation
This paper compares different energy conversion rates for some geothermal power plant cycles. These are being implemented at two high temperature, liquid dominated reservoirs; Kawerau and Rotokawa. The power plant cycle selected for the first development is a …
View paper: Power Plant Selection in Mighty River Power Develpment Projects PDF: Power Plant Selection in Mighty River Power Develpment Projects (2169KB)