-
William M. RICKARD, Sam ABRAHAM and Ernesto RIVAS
·
World Geothermal Congress
·
2020
·Drilling and Completion Technology
… the cement subsequently falls down the annulus. The ‘top squeeze’ method is selected when there are no cement returns to surface during the primary cement job. For each case, specific procedures must be followed to successfully complete a remedial cement …
View paper: Top Squeeze or Top Fill: Improved Secondary Cementing for Geothermal Wells
PDF: Top Squeeze or Top Fill: Improved Secondary Cementing for Geothermal Wells (300 KB)
-
William M. RICKARD, Jonathan HERNANDEZ and Alan BAILEY
·
Stanford Geothermal Workshop
·
2013
·General
… the cement subsequently falls down the annulus. The ‘top squeeze’ method is selected when there are no cement returns to surface during the course of the primary cement job. For each case, specific procedures must be followed to successfully complete a …
View paper: Top Squeeze or Top Fill: Improved Secondary Cementing for Geothermal Wells
PDF: Top Squeeze or Top Fill: Improved Secondary Cementing for Geothermal Wells (136 KB)
-
William M. Rickard, Jonathan Hernández and Alan Bailey
·
ARGeo
·
2012
·Drilling
… the cement subsequently falls down the annulus. The ‘top squeeze’ method is selected when there are no cement returns to surface during the course of the primary cement job. For each case, specific procedures must be followed to successfully complete a …
View paper: Top Squeeze or Top Fill: Improved Secondary Cementing for Geothermal Wells
PDF: Top Squeeze or Top Fill: Improved Secondary Cementing for Geothermal Wells (116KB)
-
Dennis Lovett, Rafael Hernandez, Lyndon Chandarjit
·
World Geothermal Congress
·
2010
·21. Drilling and Completion Technology
… company reduced nonproductive time (NPT) by 78% by squeeze cementing a lost-circulation (LC) zone with cement foamed by adding nitrogen to the slurry. The slurry design chosen was nitrogen-foamed Class G cement with an accelerator. A slurry volume of …
View paper: Squeeze with Foamed Cement Cuts Nonproductive Time in a Geothermal Well
PDF: Squeeze with Foamed Cement Cuts Nonproductive Time in a Geothermal Well (1406KB)
-
Lovett, Dennis; Hernandez, Rafael; Chandarjit, Lyndon
·
Geothermal Resources Council Transactions
·
2009
·Cementing; Lost circulation
… company reduced nonproductive time (NPT) by 78% by squeeze cementing a lost-circulation (LC) zone with cement foamed by adding nitrogen to the slurry. The slurry design chosen was nitrogen-foamed Class G cement with an accelerator. A slurry volume of …
View paper: Squeeze with Foamed Cement Cuts Nonproductive Time in a Geothermal Well
Download unavailable
-
Sophy, Matthew J.; Lopeman, Janice; Peters, Brad; Spielman, Paul; Akerly, John; Nguyen, Hao
·
Geothermal Resources Council Transactions
·
2019
·Drilling; Cementing; Lost circulation
View paper: Successful Well Design and Remedial Cementing By Top Squeeze Method at Steamboat, NV, USA
Download unavailable
-
Muhamad Bayu SAPUTRA, Gamal HASTRIANSYAH, Fatah GUNAWAN, Fernando PASARIBU, Marihot Sp SILABAN
·
World Geothermal Congress
·
2020
·Case Histories
… this problem has been done by using remedial casing and squeeze cementing. Evaluation after handling the problem is carried out by conducting a production test and or by a wellbore simulation analysis then compared its condition with previous condition …
View paper: The Phenomenon of Cooling Geothermal Wells in PT Pertamina Geothermal Energy Fields; Investigation and Handling
PDF: The Phenomenon of Cooling Geothermal Wells in PT Pertamina Geothermal Energy Fields; Investigation and Handling (1485 KB)
-
M. Kelley, D. Chaparro, O. Goh, B. Murphy
·
New Zealand Geothermal Workshop
·
2024
·Session 5.2 - DRILLING & WELL TESTING 2 | PRODUCTION & MANAG
This paper describes the successful remediation of a geothermal production well in Rotokawa, New Zealand six years after its drilling which left it with an incomplete cement job on an outer casing annulus. As an initial risk mitigation prior to commissioning …
View paper: Post drilling outer casing cement remediation and recommissioning of a Rotokawa well
PDF: Post drilling outer casing cement remediation and recommissioning of a Rotokawa well (599KB)