Kerna, M. J.; Allen, T. S.
·
Geothermal Resources Council Transactions
·
1984
·Exploration; Flash steam power generation; Power plant desig
The Roosevelt Hot Springs Unit (RHSU) was unitized in April 1976 and was the first geothermal unit approved by the United States Department of the Interior. At the time, Phillips Petroleum Company was named unit operator. In the fall of 1980, after an …
View paper: Roosevelt Hot Springs Unit Development: A Case History
Download unavailable
-
Shinya TAKAHASHI, Satoshi YOSHIDA
·
ARGeo
·
2016
The USGS volumetric method is used for assessing the electrical capacity of a geothermal reservoir. The calculation formulas include both underground related parameters and above-ground related parameters. While primary variability and uncertainty in this …
View paper: Improvement of Calculating Formulas for Volumetric Resource Assessment.
PDF: Improvement of Calculating Formulas for Volumetric Resource Assessment. (736 KB)
-
Saeid Jalilinasrabady, Ryuichi Itoi, Hiroki Gotoh, Toshiaki Tanaka
·
Stanford Geothermal Workshop
·
2010
·Production Engineering
The natural state model was developed in the takigami geothermal field, using TOUGH2 simulator. Conceptual model of the field was constructed as well as grid blocks. The rock types were assigned to each block in several layers. Initial and boundary conditions …
View paper: The Natural State Numerical Model of Takigami Geothermal Reservoir, Oita, Japan
PDF: The Natural State Numerical Model of Takigami Geothermal Reservoir, Oita, Japan (752KB)
-
Naoko Yamaguchi
·
World Geothermal Congress
·
2010
·26. Power Generation
Wayang Windu geothermal power station, owned and operated by Star Energy Geothermal (Wayang Windu) Limited, has been operating its first unit (Unit 1) from 1999. Although construction of the second unit (Unit 2) was also scheduled at the same time as Unit 1, …
View paper: Design of Wayang Windu Unit 2 Geothermal Power Station
PDF: Design of Wayang Windu Unit 2 Geothermal Power Station (511KB)
-
Yamaguchi, Naoko
·
Geothermal Resources Council Transactions
·
2009
·Power plant design and operation
Wayang Windu geothermal power station, owned and operated by Star Energy Geothermal (Wayang Windu) Limited, has been operating its first unit (Unit 1) from 1999. Although construction of the second unit (Unit 2) was also scheduled at the same time as Unit 1, …
View paper: Design and Construction of Wayang Windu Unit 2 Geothermal Power Station
Download unavailable
-
Cadenas, C.; De la Torre, G.
·
Geothermal Resources Council Transactions
·
1998
·Geothermal overviews
View paper: Main Features of the Las Tres Virgenes I Geothermal Project
Download unavailable
-
Yano, Yusaku; Ishido, Tsuneo
·
Geothermal Resources Council Transactions
·
1998
·Reservoir modeling; Computer modeling; Reservoir management
View paper: A Reservoir Engineering Study on Production Behavior of Deep-Seated Geothermal Reservoirs
Download unavailable
-
DiPippo, Ronald
·
Geothermal Resources Council Transactions
·
1997
·Power plant design and operation; Binary cycle power generat
View paper: High-Efficiency Geothermal Plant Designs
Download unavailable
-
Hickerson, Brooks; Hickerson, Russ
·
Geothermal Resources Council Transactions
·
1997
·Salt domes; Exploration; Drilling; Economics
View paper: Geothermal Energy From Hot Salt Domes
Download unavailable
-
Yamada, Shigeto
·
Geothermal Resources Council Transactions
·
1993
·Power plant design and operation
View paper: Palinpinon Geothermal Power Plants
Download unavailable
-
DiPippo, Ronald
·
Geothermal Resources Council Transactions
·
1992
·Dry steam power generation; Power plant design and operation
View paper: Thermodynamic Improvements on the Direct-Steam Plant
Download unavailable
-
Schoonmaker, James L.; Maricle, Mark F.
·
Geothermal Resources Council Transactions
·
1990
·Power plant design and operation; Power grids
The California Energy Company, Inc. (CECI) and Mission Power Engineering Company (MPE) have completed engineering and construction, and began operation of four additional geothermal generating units as part of the Coso Geothermal Project. These units are …
View paper: Design and Construction of the Coso Geothermal Power Projects
Download unavailable
-
Thorleifson, William C.; Ibe, Alex P.
·
Geothermal Resources Council Transactions
·
1982
·Binary cycle power generation; Liquid dominated reservoirs;
The Heber Binary Cycle Demonstration Plan is undertaken to provide, on a commercially viable scale, an energy conversion technology utilizing our liquid dominated, moderate temperature geothermal resources. Use of these abundant reserouce, available in many …
View paper: Use of Available Geothermal Moderate Temperature Resources for Power Generation Re: The Heber Binary Cycle Demonstration Plant
Download unavailable