Love, William; Cron, Carl; Holligan, David
·
Geothermal Resources Council Transactions
·
1988
·Well casing; Corrosion; Titanium; Durability testing; Econom
… completions are a cost-effective option for geothermal production wells in the Salton Sea field.
View paper: The Use of Beta-C Titanium for Downhole Production Casing in Geothermal Wells
Download unavailable
-
Ali MUNDAKIR, Agus A. ZUHRO, Budi SETIAWAN
·
World Geothermal Congress
·
2020
·Drilling and Completion Technology
… decrease the steam supply or even deplete it. Leaking of production casing is a common problem in geothermal operation, which usually caused by aquifer flow that enter the production casing. It can cause the cooling of reservoir temperature which lowering …
View paper: Application of Modified Inflatable Packer to Repair Production Casing Leak in Big Hole Geothermal Well
PDF: Application of Modified Inflatable Packer to Repair Production Casing Leak in Big Hole Geothermal Well (1452 KB)
-
Nico RIYANTO, Geovannis NAPITUPULU, Sena SATYADARMA WAHYUDIN
·
World Geothermal Congress
·
2020
·Drilling and Completion Technology
Determining the proper connection for tie back production casing in geothermal wells is crucial. This casing and its connection experience various loads not only while drilling but also in the production phase. In order to assess the suitable connections, …
View paper: Connection Selection for Tie Back Production Casing in Geothermal Wells According to Finite Element Analysis and Physical Thermal Well Testing Protocol
PDF: Connection Selection for Tie Back Production Casing in Geothermal Wells According to Finite Element Analysis and Physical Thermal Well Testing Protocol (1069 KB)
-
Abraham KHAEMBA
·
Stanford Geothermal Workshop
·
2015
·Field Studies
… inch anchor casing set at 400m depth and the 9⅝ inch production casing set at between 800-1400m. The wells are targeted to be drilled to a total depth of 2500-3000m, with the slotted 7 inch liners run to the bottom. All the casings used are grade K55. …
View paper: Well Design and Well Workover to Land Deep Production Casings in the Menengai Field
PDF: Well Design and Well Workover to Land Deep Production Casings in the Menengai Field (810 KB)
-
Khaemba, Abraham W.
·
Geothermal Resources Council Transactions
·
2015
·Drilling; Well completion; Cementing; Equipment design; Well
View paper: Well Design and Well Workover to Land Deep Production Casings in Menengai Field
Download unavailable
-
Aris TWERDA, Pejman SHOEIBI OMRANI, Andreas MACK, Jos VAN’T WESTENDE
·
World Geothermal Congress
·
2020
·Production Engineering, Steam Gathering Systems
… geothermal wells is important for ensuring reliable heat production from them over a long period. The geothermal production could suffer from several production issues, such as corrosion, scaling, erosion and hydrocarbon production, which can limit the …
View paper: Application of Well-Bore Flow Modelling in Geothermal Systems - Lessons Learned from Oil and Gas Production Systems
PDF: Application of Well-Bore Flow Modelling in Geothermal Systems - Lessons Learned from Oil and Gas Production Systems (861 KB)
-
Boga ISA, Fahmi SUNGKAR, Hendra SIMANJUNTAK
·
World Geothermal Congress
·
2020
·Drilling and Completion Technology
… loads not only during drilling operations but also during production operations. In the past, there were numerous papers published in relation to casing failures in geothermal wells that sometime is hardly explained. For more than 100 years of geothermal …
View paper: A Thermal Casing Connection Test to Avoid Casing Failure in Geothermal Wells
PDF: A Thermal Casing Connection Test to Avoid Casing Failure in Geothermal Wells (1037 KB)
-
Sabodh K. Garg, Jim Combs and Billie Joe Livesay
·
World Geothermal Congress
·
2000
·Exploration and Development
… these slim holes were not intended to serve as long-term production wells, little attention has been paid to optimizing casing design for obtaining maximum discharge of geothermal fluids. For example, many existing slim holes are completed with a 114 mm …
View paper: Optimizing Casing Designs of Slim Holes for Maximum Discharge of Geothermal Fluids from Liquid Feedzones
PDF: Optimizing Casing Designs of Slim Holes for Maximum Discharge of Geothermal Fluids from Liquid Feedzones (197 B)
-
Combs, Jim; Garg, Sabodh K.; Livesay, Billy Joe
·
Geothermal Resources Council Transactions
·
2000
·Drilling Technology; Slimholes; Liquid Freezones; Casing Des
View paper: Maximum Discharge of Geothermal Fluids From Slim Holes by Optimizing Casing Designs
Download unavailable
-
Kurata, Yoshiaki; Sanada, Norio; Nanjo, Hiroshi; Ikeuchi, Jun
·
Geothermal Resources Council Transactions
·
1995
·Well casing; Tubulars; Durability testing; Corrosion; Econom
View paper: Casing Pipe Materials for Deep Geothermal Wells
Download unavailable
-
Thorbjornsson, I.O.; Kaldal, G.S.; Ragnarsson, A.
·
Geothermal Resources Council Transactions
·
2019
·Well casing; Wellbore integrity; Durability testing
View paper: Testing Flexible Couplings for Geothermal Wells
Download unavailable
-
Adamczyk, Aaron; Fagade, Tayo; Fellers, Kerry
·
Geothermal Resources Council Transactions
·
2018
·Risk management; Brine chemistry; Well casing; Wellbore inte
View paper: A Proactive Approach to Risk Mitigation in Geothermal Wells
Download unavailable
-
Fatah GUNAWAN, Gamal HASTRIANSYAH, Teguh PRABOWO, Agus A. ZUHRO
·
World Geothermal Congress
·
2015
·Drilling and Completion Technology
… four different types of casing, specifically 20”, 13-3/8” (production casing), 10-3/4” and 8-5/8” (perforated liner). This well is dedicated as production well. Prior to production well testing using Lip Pressure method, the vertical discharge from the well …
View paper: Remedial of Geothermal Well: Case Study Sendangan-3, Tompaso Project
PDF: Remedial of Geothermal Well: Case Study Sendangan-3, Tompaso Project (501 KB)
-
Woods, Terry
·
Geothermal Resources Council Transactions
·
1995
·Well logging; Corrosion; Well casing; Equipment design
View paper: Ultrasonic Logging in Cased Boreholes for Corrosion Evaluation
Download unavailable
-
Weber, Lawrence; Emerson, Eric; Harris, Kirk; Brothers, Lance
·
Geothermal Resources Council Transactions
·
1998
·Drilling; Well completion; Cementing; Corrosion; Equipment d
View paper: The Application of a New Corrosion Resistant Cement in Geothermal Wells
Download unavailable
-
Sanada, Norio; Kurata, Yoshiaki; Lichti, Keith A.
·
Geothermal Resources Council Transactions
·
1997
·Geothermal overviews; Deep drilling; Durability testing
View paper: Valuation and Development of Deep Geothermal Resources--Materials Subtask Update of IEA Research Collaboration Program
Download unavailable
-
Mercado, S.; Bermejo, F.; Heard, C.; Fernandez, H.; Angulo, R.
·
Geothermal Resources Council Transactions
·
1990
·Power plant design and operation; Flash steam power generati
Geothermal plants Cerro Prieto II and III of 220 MW each achieved excellent operation conditions during 1987 with plant factors of 0.75 and 0.86, respectively. This demonstrates the operation of large geothermal plants with plant factors higher than have been …
View paper: Cerro Prieto II (220 MW) and III (220 MW) Geothermoelectric Plants
Download unavailable